Rechercher des projets européens

33 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
NIMBLE: collaboration Network for Industry, Manufacturing, Business and Logistics in Europe will develop the infrastructure for a cloud-based, Industrie 4.0, Internet-of-things-enabled B2B platform on which European manufacturing firms can register, publish machine-readable catalogs for products and services, search for suitable supply chain partners, negotiate contracts and supply logistics, and ...
Voir le projet

 17

 TERMINÉ 
The main objective of POWER2DM is to develop and validate a personalized self-management support system (SMSS) for T1 and T2 diabetes patients that combines and integrates (1) a decision support system (DSS) based on leading European predictive personalized models for diabetes interlinked with predictive computer models, (2) automated e-coaching functionalities based on Behavioural Change Theories ...
Voir le projet

 8

 TERMINÉ 

Security In trusted SCADA and smart-grids (SCISSOR)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2017,

In traditional industrial control systems and critical infrastructures, security was implicitly assumed by the reliance on proprietary technologies (security by obscurity), physical access protection and disconnection from the Internet. The massive move, in the last decade, towards open standards and IP connectivity, the growing integration of Internet of Things technologies, and the disruptivenes ...
Voir le projet

 9

 TERMINÉ 

MOBILISING THE POTENTIAL OF ACTIVE AGEING IN EUROPE (MOPACT)

Date du début: 1 mars 2013, Date de fin: 28 févr. 2017,

The starting point for MOPACT is the ambitious goals set by Horizon 2020 and the European Innovation Partnership Pilot Project on Active and Healthy Ageing (EIPAHA). Our response is ambitious too: we aim to provide the research and practical evidence upon which Europe can make longevity an asset for social and economic development. MOPACT will create a high quality, multi-disciplinary critical mas ...
Voir le projet

 32

 TERMINÉ 

EnhAnced Government LEarning (EAGLE)

Date du début: 1 févr. 2014, Date de fin: 31 janv. 2017,

Public administrations (PA) need to cope with various challenges: new regulations, an aging workforce and the need for adopting their ICT. Technology-enhanced learning (TEL) represents thus a sensible option notably for rural local governments (RLG) that need to keep up with such changing environments, but do have limited ac-cess to training courses.From interviews of a pre-study with RLG in 5 Eur ...
Voir le projet

 10

 TERMINÉ 
ARIADNE is a proposal to bring together and integrate the existing archaeological research data infrastructures so that researchers can use the various distributed datasets and new and powerful technologies as an integral component of the archaeological research methodology. There is now a large availability of archaeological digital datasets that altogether span different periods, domains and reg ...
Voir le projet

 24

 TERMINÉ 

Media in Context (MICO)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2016,

With the tremendous increase in multimedia content on the Web and in corporate intranets, discovering hidden meaning in raw multimedia is becoming one of the biggest challenges. Analysing multimedia content is still in its infancy, requires expert knowledge, and the few available products are associated with excessive price tags, while still not delivering sufficient quality for many tasks. This m ...
Voir le projet

 7

 TERMINÉ 

Fusepool Publish-Process-Perform Platform for Linked Data (Fusepool P3)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2015,

To make publishing and processing of linked data easy, the proposed project develops a set of integrated software components based on open-source Linked Data Platform best practices. The tightly integrated components support the multilingual data value chain from data exploration (e.g. identifying structured and unstructured data sources), extraction (e.g. using named entity recognition, RDF conv ...
Voir le projet

 9

 TERMINÉ 

GMES pre-operational security services for supporting external actions (G-NEXT)

Date du début: 1 janv. 2013, Date de fin: 30 juin 2015,

According to the potential application areas identified under SEA (GMES Security working group in Support to External Actions), and the experience gained by the proposal consortium in Security and Emergency precursor projects (LIMES, G-MOSAIC, SAFER) this proposal will identify and exploit a set of Services able to provide reliable support to the EU External Action service and suitable to be integ ...
Voir le projet

 17

 TERMINÉ 
What is missing so far in the European Union are disaster management procedures, tools and systems which fully take into account the specific characteristics and requirements of large-scale international cooperation in emergency situations. These characteristics are distinguished by many diverse emergency response organisations that need to collaborate across technological systems, organisational ...
Voir le projet

 19

 TERMINÉ 

A data infrastructure to support agricultural scientific communities (agINFRA)

Date du début: 15 oct. 2011, Date de fin: 14 févr. 2015,

agINFRA is an Integrated Infrastructure Initiative (I3) project that will try to introduce the agricultural scientific communities into the vision of open and participatory data-intensive science. In particular, agINFRA aims to design and develop a scientific data infrastructure for agricultural sciences that will facilitate the development of policies and the deployment of services that will prom ...
Voir le projet

 14

 TERMINÉ 
Patient Empowerment involves patients to a greater extent in their own healthcare process and disease management becomes an integrated part of their daily life. The capability of self-management opens the possibility for patients not only to contribute to their own healthcare but also to be more in control of their disease. EMPOWER will develop a modular and standard-based Patient Empowerment Fram ...
Voir le projet

 7

 TERMINÉ 

Creative Cooperation in Cultural Heritage (CreativeCH)

Date du début: 1 oct. 2011, Date de fin: 30 sept. 2014,

CreativeCH will promote cooperation and mutual innovation among organisations of Science & Technology (S&T), Cultural Heritage (CH) and Cultural and Creative Industries (CCI), and highlight the contribution of such cooperations and innovations to vital European economic, social and cultural objectives.The goals of the CreativeCH Action Plan are, a) enable cities and regions across Europe to benefi ...
Voir le projet

 6

 TERMINÉ 

Cities on Power (CoP)

Date du début: 30 juin 2011, Date de fin: 29 juin 2014,

The challenge of the global climate change and the pressure on resources stemming from the global competition combined with the high dependency of the energy import of the European Union requires concerted strategies and innovative adaptation approaches. The EU directive on the promotion of the use of energy from renewable sources (RES) from 23rd April 2010 imposes on the EU Member States the obli ...
Voir le projet

 9

 TERMINÉ 

Almregion Bayerisch-Salzburger Kalkalpen

Date du début: 30 nov. 2010, Date de fin: 29 nov. 2013,

Das Projekt wird in 3 Betrachtungsdimensionen durchgeführt, wobei die Almen (inkl. Funktionen u. Ausstattung), die Almflächen (Almweidegebiet) sowie die reg. Verflechtungen der Almen (Regionalwirtschaft) im Mittelpunkt der Betrachtung stehen. Durch GIS-gestützte Methoden, vor Ort Erhebungen, statist. Analysen, etc. werden Art und Intensität der Veränderungen (Zuwachsen) dargestellt, die Ursachen-W ...
Voir le projet

 3

 TERMINÉ 

European Support Framework on Networked Media R&D for SMEs (SMARD)

Date du début: 1 sept. 2011, Date de fin: 31 mars 2013,

... within the exploitation chain between successful Networked Media Research and the commercialisation by SMEs.The SMARD Consortium is led by MFG Baden-Württemberg and comprises European partners from Salzburg Region (Salzburg Research), Flanders (Interdisciplinary Institute for Broadband Technology (IBBT) and Piemonte (CSP innovazione nelle ICT).The vision is to put advanced digital media technolog ...
Voir le projet

 4

 TERMINÉ 
Over the last decade, there has been an exponential growth in the number of cardiac implantable devices, in their electronic and software complexity widening their function and application. However, due to their limited processing capabilities restricted by their size, CIEDs need to be supported with software running on the data centers. Currently, the data center processing is standalone with the ...
Voir le projet

 8

 TERMINÉ 

Interactive Knowledge Stack for small to medium CMS/KMS providers (IKS)

Date du début: 1 janv. 2009, Date de fin: 31 déc. 2012,

Description A Semantic-based Open Source Platform for Small to Medium CMS ProvidersIKS will raise the semantic capability of European software houses to develop intelligent content management solutions for their customers. What is IKS? IKS is an integrating project targeted at the hundreds of SMEs in Europe, which are providing technology ...
Voir le projet

 17

 TERMINÉ 

Sustainable Instruments for Lakes Management in the Alpine Space (SILMAS)

Date du début: 31 août 2009, Date de fin: 30 août 2012,

Natural and artificial lakes are a main characteristic of the Alpine Space and belong, with their catchment areas, to the European heritage.During last decades, authorities in charge of lakes management worked to preserve and restore this heritage and its natural resources. They now have to anticipate climate change impacts.SILMAS, by exchanging good practices and testing new methods, will supply ...
Voir le projet

 15

 TERMINÉ 

Services and Applications For Emergency Response (SAFER)

Date du début: 1 janv. 2009, Date de fin: 31 mars 2012,

"SAFER aims at implementing preoperational versions of the Emergency Response Core Service. SAFER will reinforce European capacity to respond to emergency situations: fires, floods, earthquakes, volcanic eruptions, landslides, humanitarian crisis. The main goal is the upgrade of the core service and the validation of its performance with 2 priorities: First priority is the short term improvement o ...
Voir le projet

 57

 TERMINÉ 
"Within the context of the GMES Initiative, the G-MOSAIC Collaborative Project aims at identifying and developing products, methodologies and pilot services for the provision of geo-spatial information in support to EU external relations policies and at contributing to define and demonstrate sustainability of GMES global security perspective. The activities will be devoted to: Investigate the oper ...
Voir le projet

 39

 TERMINÉ 

Etourism Fitness für Oberbayern und Salzburg

Date du début: 31 oct. 2008, Date de fin: 30 oct. 2011,

Das Projektmanagement (FH Salzburg) koordiniert die beteiligten Partner, die gesamten Arbeits- und Organisationsstrukturen, unterstützt die Umsetzung des Arbeitsprogramms und der Arbeitspakete. Der bayerische Projektpartner TVB München Oberbayern wird die spezifische und vertiefende Projektumsetzung auf bayerischer Seite leisten. Folgende Partnerregionen sind beteiligt: Lammertal, Zell am See - Ka ...
Voir le projet

 3

 TERMINÉ 

Knowledge in a Wiki (KIWI)

Date du début: 1 mars 2008, Date de fin: 28 févr. 2011,

Description Knowledge management in software development and project management is an exciting problem, as it involves tacit knowledge (e.g. about processes), distributed knowledge (different people, different systems), and many different kinds of semantically rich content (e.g. source code, documentation, tutorials, project work plans) that ...
Voir le projet

 7

 TERMINÉ 

EuRegionale Raumanalyse (EULE)

Date du début: 31 déc. 2007, Date de fin: 30 déc. 2010,

...katoren (Zusammenführung grenzübergreifender geographischer und regionalstatistischer Daten- und Planungsgrundlagen, räumliche Ausdehnung des Projektgebietes (Bayerische Planungsregion 18 / Land Salzburg), Entwicklung eines Web-Prototypes für ein indikatorenbasiertes EuRegionales Informationssystem, AP3: Grenzübergreifende Bewertung / Analyse des Verflechtungsraumes (Indikatoren zur Abbildung gren ...
Voir le projet

 3

 TERMINÉ 

Monitoring and Measurement in the Next Generation Technologies (MOMENT)

Date du début: 1 janv. 2008, Date de fin: 30 juin 2010,

Reaching optimising control, management and flexibility of the future network infrastructures requires actions to retrieve a good understanding of network and application behaviour. In previous EU-funded FP6 projects like EVERGROW and LOBSTER, large efforts have been taken to successfully develop and deploy measurement infrastructures (e.g. ETOMIC, DIMES) to gain insight into the operational netwo ...
Voir le projet

 12

 TERMINÉ 

Privacy-aware Secure Monitoring (PRISM)

Date du début: 1 mars 2008, Date de fin: 31 mai 2010,

Passive network monitoring is required for the operation and maintenance of communication networks as well as to detect frauds and attacks. Typically, raw packet-level traffic traces are collected using suitable traffic probe devices and fed to monitoring applications (IDSs, antivirus, etc..) for analysis, with potential risks for the legitimate privacy rights of the customers. This projects aims ...
Voir le projet

 8

 TERMINÉ 
The provinces Salzburg (AT) & North Rhine-Westfalia (GE) are collaborating at political level and through economic partnerships. BRIDGE2GEO intensifies the existing links and initiates science-business partnerships within and between the regions in order to enhance S&T-based development. The cross-cutting topic is Geographic Information. Building on earlier joint actions, technological developmen ...
Voir le projet

 15

 TERMINÉ 
World Heritage Sites are important promoters of regional development, both economically, as they attract tourism, and socially, as cornerstones of regional identity. However, it is often difficult for sites with a World Heritage status to convey the abstract and complex concept of World Heritage to their local communities or to visitors and tourists. This can often be traced back to a lack of nove ...
Voir le projet

 9

 TERMINÉ 
OLCOS's objectives are to make available information and learning services that will foster and support the creation, sharing and re-use of open e-learning content in and among the European member states.
Voir le projet

 1

 TERMINÉ 
Traditional retail trade undergoes fundamental structural changes since the Eighties. Management has to respond to this change to assure the cultural and social function of retailers in the historic town centres. The most important objective of the project it is to develop innovative training tools (by means of e-learning) for the traditional retail trade. It is foreseen to produce training module ...
Voir le projet

 7

 TERMINÉ 
MOSEP addresses the growing problem of adolescents (aged 14 to 16) dropping out of the formal education system around Europe. Students of this age find themselves at the transition phase in their lives where they have to choose between going into upper secondary education or entering vocational training. It is a time when they have to make decisions and need to be supported in making the best choi ...
Voir le projet

 10

 TERMINÉ 
MOSEP addresses the growing problem of adolescents (aged 14 to 16) dropping out of the formal education system around Europe. Students of this age find themselves in a transition phase in their lives where they have to choose between going into upper secondary education or entering vocational training. It is a time when they have to make decisions and need to be supported in making the best choice ...
Voir le projet

 10

 TERMINÉ 
The main goal of the "ePortfolio for Your Future" (ePortfolio 4YF) project is to enable consultants prepare students to be aware of their competencies and skills in order to take the right decision for further education or professional development.
Voir le projet

 6