Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Citizen Led Air pollution Reduction in Cities (CLAiR-CITY)

Date du début: 1 mai 2016, Date de fin: 30 avr. 2020,

CLAiR-City will apportion air pollution emissions and concentrations, carbon footprints and health outcomes by city citizens’ behaviour and day-to-day activities in order to make these challenges relevant to how people chose to live, behave and interact within their city environment. Through an innovative engagement and quantification toolkit, we will stimulate the public engagement necessary to a ...
Voir le projet

 17

 TERMINÉ 
Several European bus manufacturers consider the hybrid fuel cell (FCH) bus as the most promising technology to facilitate the decarbonisation of public transport. By leveraging the experiences of past fuel cell bus projects, implementing technical improvements that increase efficiency and reduce costs of FCH buses, as well as introducing a modular approach to hydrogen refuelling infrastructure bui ...
Voir le projet

 13

 TERMINÉ 
Demographic ageing is one of the most serious challenges Europe is facing. Better care and sustainability of health services calls for innovative ways to address the needs of the elderly. Supporting homecare, i.e. care provided by professionals within users’ own homes, has been identified by EC as a possible solution.Although a high number of elderly and their families are searching for skilled pr ...
Voir le projet

 11

 TERMINÉ 

Building Logistic edUcation in Europe

Date du début: 1 sept. 2015, Date de fin: 31 août 2017,

The aim of the project is to promote innovation and to improve the school and training system in the Liguria region by taking advantage of the opportunity given by the European and international confrontation through the exchange of cultural and operational models which are intended to be spread for the promotion of a sustainable, inclusive, smart growth as indicated by the Europe 2020 Strategy. T ...
Voir le projet

 8

 TERMINÉ 

Innovation Support Services for SMEs in North West Italy (ALPS.INN3)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2016,

The project, whose geographical coverage will be North-West Italy (3 regions : Piemonte Liguria and Valle d’Aosta) aims at implementing a specific framework service for supporting SMEs in the innovation management capacity . The service, delivered through provision of 96 individual companies’ service packages, will be directed to SMEs with international growth potential via product, process servic ...
Voir le projet

 6

 TERMINÉ 
Background Marine litter is a problem that affects many parts of Europe and can cause a wide spectrum of environmental, economic, health and cultural impacts. There are a variety of reasons why the phenomenon occurs, including: poor solid waste management practices; a lack of infrastructure; human activities; low levels of public awareness about the pote ...
Voir le projet

 6

 TERMINÉ 

Public procurement of innovation FOR cooperative ITS (P4ITS)

Date du début: 1 déc. 2013, Date de fin: 31 mai 2016,

P4ITS will create a network of individuals and organisations experienced in procurement of cooperative ITS (or experienced in other ITS procurement but expecting to shortly embark on deploying C-ITS), willing to improve the market roll-out of innovative transport systems through public procurement, and concerned by the legal and operational challenges linked to the commercial procurement of comple ...
Voir le projet

 17

 TERMINÉ 

ORTS ET IDENTITE (PORTI)

Date du début: 14 janv. 2013, Date de fin: 14 janv. 2016,

Les villes portuaires de lespace de coopération du Programme Italie/France Maritime présentent la même problématique de déstructuration et absence de fluidité du point de vue urbain et économique entre lhinterland e linterface ville-port. Afin de transformer le désagrément causé par linteraction des fonctions urbaines et portuaires en un atout pour le développement économique des territoires, le p ...
Voir le projet

 6

 TERMINÉ 
La thématique principale de la proposition PROTERINA-Due est la prévention des risques naturels.Lobjectif général du projet est en effet daméliorer la capacité de prévoir et de prévenir les risques naturels, en particulier les risques hydrologiques et des ceux des incendies de forêt.Les bénéficiaires (directs ou indirects) sont les administrations régionales compétentes dans les domaines de la pro ...
Voir le projet

 8

 TERMINÉ 
Le projet Innolabs ++ concerne, comme Innolabs +, le thème du développement et de la promotion des modèles innovants de gouvernance territoriales et de la compétitivité, qui seront mis à disposition des sujets des zones du projet, leur permettant de créer une véritable valeur ajoutée dans lorganisation de leurs opérations de développement local.L'objectif général est de réaliser des infrastructure ...
Voir le projet

 4

 TERMINÉ 
Innolabs + concerne le thème du développement et de la promotion des modèles innovants de gouvernance territoriales et de la compétitivité dans le domaine socio-économique, notamment en ce qui concerne le tissu entrepreneurial, selon les principes énoncés par les stratégies de Lisbonne, Göteborg et Europe 2020.L'objectif général du projet est de réaliser des infrastructures et des instruments perm ...
Voir le projet

 6

 TERMINÉ 
Le projet soccupe de trois domaines thématiques en les mettant en relation entre eux: le nautisme, les services pour lemploi, l'instruction et la formationprofessionnelle.L'objectif principal de ce projet est de développer deux réseaux transfrontaliers thématiques: un réseau pour l'emploi et l'autre pour l'instruction et la formation professionnelle, afin d'améliorer, en termes qualitatifs et quan ...
Voir le projet

 7

 TERMINÉ 
Terragir 2 promeut la coopération entre les entreprises agro-alimentaires et entre celles-ci et les entreprises du service local, notamment dans le domaine touristique. Afin de contribuer concrètement à la valorisation du secteur, le projet se concentre sur la réalisation et la mise en réseau de VITRINES, cest-àdire despaces physiques ou virtuels que les entreprises utilisent pour informer, illust ...
Voir le projet

 8

 TERMINÉ 
Background Grey squirrels (Sciurus carolinensis) are acknowledged as an invasive alien species which has threatened the native Eurasian red squirrel (Sciurus vulgaris) in the British Isles and parts of northern Italy. The grey squirrel can also cause extensive damage to trees through bark-stripping, which affects re-growth and natural tree reproduction in ...
Voir le projet

 3

 TERMINÉ 

ART'AERA (PART'AERA)

Date du début: 14 janv. 2013, Date de fin: 14 janv. 2015,

Le projet vise à répondre aux attentes communautaires concernant une meilleure connaissance des origines de particules, polluant majeur de l'air. Une fois la contribution des différentes sources de pollution bien connue, les décideurs locaux pourront envisager des actions de planification efficaces, visant à abaisser la pollution transfrontalière, aidés par les outils développés dans AERA.
Voir le projet

 4

 TERMINÉ 

ARTISART

Date du début: 13 janv. 2013, Date de fin: 13 janv. 2015,

Création et promotion des réseaux des petites entreprises des métiers d’art certifiées pour la qualité et la valeur des produits et des métiers traditionnels et les compétences des maîtres artisans de la zone transfrontalière.
Voir le projet

 7

 TERMINÉ 

INFORMA

Date du début: 13 janv. 2013, Date de fin: 13 janv. 2015,

Initiatives de coopération pour la formation forestière professionnelle dans lespace alpin transfrontalier franco-italien.
Voir le projet

 8

 TERMINÉ 

INFO RAIL MED

Date du début: 13 janv. 2013, Date de fin: 13 janv. 2015,

Recherche de solutions opérationnelles afin de diminuer l'impact de la rupture de charge en gare de Vintimille grâce à une amélioration des relations entre les Régions, autorités organisatrices de transport, et de l'information des usagers afin de diminuer l'utilisation de la voiture et les conséquences négatives sur l'environnement.
Voir le projet

 2

 TERMINÉ 

RISKNET

Date du début: 13 janv. 2013, Date de fin: 13 janv. 2015,

Lobjectif du projet est la capitalisation et le développement du réseau transfrontalier sur les risques naturels dans les territoires des Alpes Occidentales pour développer une identité transfrontalière. La stratégie retenue est de mener une réflexion commune sur des concepts tels que la «culture du risque» (facteur important didentité transfrontalière) et le «risque soutenable».
Voir le projet

 10

 TERMINÉ 

ERA-NET on Translational Cancer Research (TRANSCAN)

Date du début: 1 janv. 2011, Date de fin: 31 déc. 2014,

"Cancer is a worldwide health burden and a major public health challenge in Europe, responsible for 25% of all deaths; a situation expected to worsen with population ageing. The strengthening of translational cancer research is an urgent need in European cancer research, i.e. the integration of basic, epidemiological, preclinical and clinical research with the implementation and evaluation of inte ...
Voir le projet

 29

 TERMINÉ 

ITINÉRAIRE DES PATRIMOINES ACCESSIBLES (ACCESSIT)

Date du début: 18 mai 2011, Date de fin: 18 mai 2014,

The project wants to elaborate a network of cultural heritage as part of an integrated management of shared resources in the "maritime" space. Specifically, the project will result in structuring a great itinerary and in the ability to integrate the actions the Tyrrhenian area by relying on a network consisting of the four regions and by a series of "laboratories of tangible and intangible heritag ...
Voir le projet

 19

 TERMINÉ 

OVER TO OVER – ANZIANI AL SERVIZIO DI ALTRI ANZIANI (O to O )

Date du début: 17 mai 2012, Date de fin: 17 mai 2014,

Le projet "Over to Over" vise à créer un réseau solidaire dassistance et de services aux personnes âgées en ce qui concerne le thème du logement. Les régions du Programme Italie/France « Maritime », partenaires du projet, caractérisées par l'une des plus hautes concentrations de personnes âgées en Europe (40% d'entre elles vivent seules), ont décidé de valoriser leur expérience en matière de polit ...
Voir le projet

 2

 TERMINÉ 

IATTAFORMA ITS PER L’INFOMOBILITÀ INTERMODALE INTERREGIONALE (3iPLUS)

Date du début: 31 mars 2011, Date de fin: 31 mars 2014,

The strategic project "3i plus" promotes the accessibility of local areas affected by the traffic service for inter-modal transport of all persons (citizens / general users), the real-time management of information and mobility services. The information infrastructure in the project will encompass the entire area covered by the OP Italy-France "Maritime" 2007-2013. There will also be project-speci ...
Voir le projet

 14

 TERMINÉ 

Trans-Rail Integrated Goods European-Express Routes Demonstrators (TIGER DEMO)

Date du début: 1 avr. 2011, Date de fin: 31 déc. 2013,

TIGER Project developed under the 7FP addresses the issues of promoting sustainable logistics introducing innovative railway services connecting the sea ports of the European Union with the Hinterland. This is done with particular attention to the flows generated to/from the Far East and South East Asia, involving all European major Ports, suffering from traffic congestion. In particular, two Nort ...
Voir le projet

 19

 TERMINÉ 

AMYCOFOREST

Date du début: 8 sept. 2011, Date de fin: 8 nov. 2013,

Démonstration et vulgarisation de modèles de sylviculture visant l'amélioration de la productivité mycologique, tout en sauvegardant la biodiversité et le bon fonctionnement des écosystèmes forestiers. Analyse du marché local lié à cette ressource et étude des possibilités de valorisation locale.
Voir le projet

 5

 TERMINÉ 

Petromyzon And River Continuity (P.A.R.C.)

Date du début: 12 janv. 2009, Date de fin: 31 déc. 2012,

Background The Montemarcello-Magra Park contains the only Italian rivers in which successful reproduction of the Sea lamprey (Petromyzon marinus) has been seen: the Magra and Vara rivers. These rivers also host many other important migratory fish species of European Community interest, both those migrating between seawater and freshwater (diadromous) and ...
Voir le projet

 4

 TERMINÉ 
Il progetto strategico PEEF "Educazione e formazione" mira a promuovere l'inserimento e la mobilità delle popolazioni trasfrontaliere con la prospettiva di un'apertura europea.
Voir le projet

 25

 TERMINÉ 

StratTour

Date du début: 31 déc. 2009, Date de fin: 30 déc. 2012,

Sviluppare un modello di turismo sostenibile basato sull'appropriazione del fenomeno "turismo" da parte degli abitanti, la promozione di un turismo di prossimità fuori stagione e la messa in relazione delle imprese e dei loro lavoratori stagionali
Voir le projet

 1

 TERMINÉ 

Product Main Impacts Sustainability through Eco-communication (PROMISE)

Date du début: 1 janv. 2010, Date de fin: 30 nov. 2012,

Background Information and communication tools are required to help ensure that society’s consumption patterns become more environmentally sustainable. Altering the behaviour patterns of the market and the general public is particularly important when it comes to raw material use, greenhouse gas emissions, waste minimisation, energy efficiency and biodi ...
Voir le projet

 6

 TERMINÉ 
The recent EU Commission paper on the establishment of a “Primary European Rail Freight Network” is the confirmation that Europe wants to develop a long term freight sustainable mobility.Infrastructure investments are costly and take long time to come to fruition. Hence force the need to adopt a realistic mid term strategy for developing the use of freight trains to bridge the gap up to when the ...
Voir le projet

 23

 TERMINÉ 

Aera

Date du début: 30 juin 2009, Date de fin: 29 juin 2012,

In relazione agli obiettivi comunitari, il progetto ha l'obiettivo di fornire alle Regioni ed agli Enti strumenti per migliorare ed armonizzare le basi conoscitive e metodologiche relative ai processi di pianificazione della tutela della qualità dell'aria in modo da individuare strategie comuni di tutela nello spazio transfrontaliero.
Voir le projet

 8

 TERMINÉ 

RiskNat

Date du début: 30 juin 2009, Date de fin: 29 juin 2012,

I rappresentanti degli enti territoriali delle Alpi Occidentali hanno elaborato una proposta di progetto strategico per il periodo 2007-2013 sul tema della gestione in sicurezza dei territori di montagna transfrontalieri rispetto ai rischi naturali.
Voir le projet

 13

 TERMINÉ 

Renerfor

Date du début: 30 juin 2009, Date de fin: 29 juin 2012,

Iniziative di cooperazione per 10 sviluppo delle fonti di energia rinnovabili (bosco e acqua) neIle Alpi Occidentali, il risparmio energetico e la riduzione delle emissioni di gas ad effetto serra
Voir le projet

 10

 TERMINÉ 
The recent growth of interest in landscape and environmental systems and the historical centers, suggellatio at European level of the conclusion of the European Landscape Convention and adopted by the regions through the development of the Landscape Plan, created policies and interventions that need more consistency compared to local needs and local communities in order to reduce impacts associate ...
Voir le projet

 4

 TERMINÉ 

GPPinfoNET The Green Public Procurement Information Network (GPPinfoNET)

Date du début: 1 févr. 2009, Date de fin: 30 janv. 2012,

Background Flows of material and energy in the socio-economic system must be dramatically reduced in order to achieve sustainable development objectives. Waste generation must also be reduced. Green public procurement (GPP) can play a role in this: it is a tool for changing consumption and production modes. When public authorities decide to adopt GPP prac ...
Voir le projet

 5

 TERMINÉ 
The project 3i addresses the problem of accessibility simply trying to promote regional integrated mobility (inter) of the areas concerned with regard to intermodal transport (private mobility and public transport) of persons (citizens / general user). Systems and services produced in the future with 3i will be made available on the territory of cooperation. The project aims to create the basis fo ...
Voir le projet

 4

 TERMINÉ 

OPSA

Date du début: 30 juin 2009, Date de fin: 30 juin 2011,

Realizzare una piattaforma transfrontaliera comune in grado di favorire lo scambio informativo in materia di promozione della salute (osservazione, pianificazione e promozione). L'obiettivo è fornire agli attori locali uno strumento volto a favorire piani ed azioni di miglioramento e di orientamento delle politiche locali per la promozione della salute e il benessere della popolazione.
Voir le projet

 9

 TERMINÉ 
Biomass answers some basic questions: what are the opportunities offered by forest and agricultural biomass to produce energy and heat in the cooperation? What are the benefits and costs in achieving both environmental and economic systems and boilers, and organize their supply chains that provide the raw material? There are conditions for forest biomass power plants by promoting sustainable fores ...
Voir le projet

 7

 TERMINÉ 

SECTRAMSECURITE DU TRANSPORT DE MARCHANDISES - SICUREZZA NEL TRANSPORTO MERCI

Date du début: 31 déc. 2008, Date de fin: 30 déc. 2010,

L‟obiettivo primario da conseguire nel progetto sarà lo studio e l‟attuazione di soluzioni logistiche comuni per migliorare la messa in sicurezza dei servizi e delle infrastrutture di trasporto di interesse transfrontaliero a livello interregionale.
Voir le projet

 4

 TERMINÉ 

NATURA 2000 Alpi Del Mare / NATURA 2000 Alpes De la Mer

Date du début: 30 juin 2008, Date de fin: 31 mai 2010,

Natura 2000 nelle Alpi del Mare. Analisi e implementazione delle conoscenze in campo naturalistico sulla base di protocolli comuni, organizzazione di un Sistema Informativo Transfrontaliero sul patrimonio della rete Natura 2000 nel territorio alpino sud-occidentale (Alpi Liguri)
Voir le projet

 4