Rechercher des projets européens

14 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Industrial Energy and Environment Efficiency (Indus3Es)

Date du début: 1 oct. 2015, Date de fin: 30 juin 2019,

Large quantities of waste heat are continuously rejected from industries. Most of this waste energy, however, is of low-quality and is not practical or economical to recover it with current technologies. The Indus3Es project will develop an innovative Absorption Heat Transformer (AHT) for this purpose, focused on low temperature waste heat recovery (below 130ºC). The Indus3Es System will effective ...
Voir le projet

 10

 TERMINÉ 

Graphene-based disruptive technologies (GrapheneCore1)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Voir le projet

 158

 TERMINÉ 

FAST industrialisation by CAtalysts Research and Development (FASTCARD)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2017,

"To meet short term European 20-20-20 objectives and long term targets of European Energy Roadmap 2050, an energy paradigm shift is needed for which biomass conversion into advanced biofuels is essential.This new deal has challenges in catalyst development which so far hinders implementation at industrial level: Firstly, biomass is much more complex and reactive than conventional feedstock; second ...
Voir le projet

 14

 TERMINÉ 

HPC for Energy (HPC4E)

Date du début: 1 déc. 2015, Date de fin: 30 nov. 2017,

This project aims to apply the new exascale HPC techniques to energy industry simulations, customizing them, and going beyond the state-of-the-art in the required HPC exascale simulations for different energy sources: wind energy production and design, efficient combustion systems for biomass-derived fuels (biogas), and exploration geophysics for hydrocarbon reservoirs.For wind energy industry HPC ...
Voir le projet

 8

 TERMINÉ 

Sustainable Pavements & Railways Initial Training Network (SUP&R ITN)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2017,

"The design, construction, maintenance, use and end-of-life management of road pavements and railways is associated with a number of important impacts on the environment; namely the consequences of energy consumption, unsustainable use of materials/resources, waste generation and release of hazardous substances into the environment. It is estimated that over 80% of all these environmental impacts ...
Voir le projet

 10

 TERMINÉ 
The Eco2CO2 project aims at exploiting a photo-electro-chemical (PEC) CO2 conversion route for the synthesis of methanol as a key intermediate for the production of fine chemicals (fragrances, flavourings, adhesives, monomers,…) in a lignocellulosic biorefinery. A distinct improvement in the ecological footprint of the envisaged chemical industries will thus be achieved by: i) boosting the potenti ...
Voir le projet

 9

 TERMINÉ 

Sustainable Hydrothermal Manufacturing of Nanomaterials (SHYMAN)

Date du début: 1 mai 2012, Date de fin: 30 avr. 2016,

...l end users in four key areas – printed electronics with SOVY; surface coatings with CRF, PPG and SOVY; healthcare and medical with ENDOR and CERA; hybrid polymers and materials with TopGaN and REPSOL. Further value will be added to the Project by working on new materials that have been identified as key future targets but cannot be currently made, or made in significant quantities. The consortium ...
Voir le projet

 19

 TERMINÉ 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Date du début: 1 oct. 2013, Date de fin: 31 mars 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Voir le projet

 154

 TERMINÉ 

Reconstructing Mediterranean-Atlantic exchange during the Miocene (MEDGATE)

Date du début: 1 févr. 2012, Date de fin: 31 janv. 2016,

"MEDGATE combines the expertise of 29 geoscientists from both the oil industry and academia in the training of 10 researchers. It aims to equip these researchers for successful careers in either sector through interdisciplinary projects focussing on an intriguing problem which has implications for both environmental change and hydrocarbon exploration. The research aim of MEDGATE is to reconstruc ...
Voir le projet

 5

 TERMINÉ 
This proposal will aim to develop the enabling technology that will enable existing pipe crawling robots (pigs) to provide internal inspection of pipe walls using long range ultrasound guided waves (LRUG) deployed in pipe segments of about fifty metre length.The aim is to perform total volume inspection far more rapidly, accurately and cheaply than is presently achieved with magnetic and ultrasoni ...
Voir le projet

 8

 TERMINÉ 
The project concept is to combine nanoreactor technology with multisite solid catalyst design to achieve a safer, cleaner and intensified chemical production. The project ideas are the following: (i) From micro- to nano-reactors. Actual microreactor have channels of micrometric size. We will develop a new concept based on the use of nanometric size channels. (ii) Vectorial pathway for multisite ca ...
Voir le projet

 11

 TERMINÉ 

Demonstration of the WindFloat Technology (DEMOWFLOAT)

Date du début: 15 juil. 2011, Date de fin: 14 juil. 2014,

Consistent with industrial initiative of the SET Plan this project addresses the objective of a grid-connected multi-megawatt fully integrated offshore wind turbine hosted on a floating support structure. The Proposed Project is in the unique position to leverage significant pre-existing financial and intellectual capital invested by the project coordinator, WindPlus in a PILOT unit installation ...
Voir le projet

 12

 TERMINÉ 
The project will demonstrate a 200.000 t/year capacity flexible FAME production plant, starting from different kinds of raw material oils, with the aim of reducing 40% of the CO2 balance compared to the well to wheel emissions of a conventional fossil diesel plant, through the following measures: to develop an integrated transesterification process, linked to the neighbouring crushing process thro ...
Voir le projet

 6

 TERMINÉ 
...e dissemination and training, and project management. The project is co-ordinated by ECN (The Netherlands). Other participants involved: 4 SMEs (ETC, TK, VFT, Bioro), 3 industries (Greencell, Cehave, Repsol), 2 universities (Aston, UGent) and 3 RTD institutes (VTT, WUR A&F, STFI). Project duration: 24 months. Total requested EC-grant: 995 kEuro."
Voir le projet

 14