Rechercher des projets européens

10 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
OCTAVIUS aims to demonstrate integrated concepts for zero emission power plants covering all the components needed for power generation as well as CO2 capture and compression.Operability and flexibility of first generation post combustion processes are demonstrated by TNO, EnBW and ENEL pilot plants in order to prepare full scale demo projects such as the ROAD and Porto Tolle projects that will st ...
Voir le projet

 18

 TERMINÉ 

Tomorrow's Elastic, Adaptive Mobility (TEAM)

Date du début: 1 nov. 2012, Date de fin: 31 oct. 2016,

TEAM aims at developing systems for participants in transportation networks, which help them to behave better – by explicitly taking into account the needs and constraints of other participants and the network itself. Focus will be placed upon decision-making in a time interval, above what is commonly associated with reactive safety (typically less than 5 seconds) and below long-term planning appl ...
Voir le projet

 27

 TERMINÉ 

Advanced Cockpit for Reduction Of StreSs and workload (ACROSS)

Date du début: 1 janv. 2013, Date de fin: 30 juin 2016,

Outstanding safety level of air transport is partly due to the two pilots standard. However situations where difficult flight conditions, system failures or cockpit crew incapacitation lead to peak workload conditions.The amount of information and actions to process may then exceed the crew capacity. Systems alleviating crew workload would improve safety.ACROSS Advanced Cockpit for Reduction of St ...
Voir le projet

 36

 TERMINÉ 

EERA Design Tools for Offshore Wind Farm Cluster (EERA-DTOC)

Date du début: 1 janv. 2012, Date de fin: 30 juin 2015,

The European Energy Research Alliance (EERA) together with some high-impact industry partners addresses the call proposing an integrated and validated design tool combining the state-of-the-art wake, yield and electrical models available in the consortium, as a plug-in architecture with possibility for third party models. To decrease uncertainties around wind farm wake predictions, a small measur ...
Voir le projet

 23

 TERMINÉ 

Intelligent Tutoring Interface for Technology Enhanced Learning (INTUITEL)

Date du début: 1 oct. 2012, Date de fin: 30 juin 2015,

The objective of INTUITEL is to enhance state-of-the-art e-learning content and Learning Management Systems (LMS) with features that so far have been provided only by human tutors. An INTUITEL-enabled system constitutes an integrated learning environment that configures itself in response to any learner, monitors his/her progress and behaviour, combines these data with pedagogical and methodologic ...
Voir le projet

 12

 TERMINÉ 
Adhesive bonding technologies are a substitute for joining processes such as welding which offer vehicle designers the potential to select from a wider range of lightweight materials for vehicle design and construction. The ability to use lightweight materials allows vehicles to maximise fuel efficiency.Current adhesive bonding methods require an energy intensive oven cure process. Furthermore, ov ...
Voir le projet

 11

 TERMINÉ 
"Fisheries landings of Nephrops novegicus (also known as Dublin Bay Prawn, Norway Lobster and Langoustine, among other names) are around 59,000 tons a year with a first sale value of close to €200 million.The NEPHROPS project is intended to bring together complementary information from survey, experimental and laboratory work. This combination of approaches is intended to create synergies and tran ...
Voir le projet

 15

 TERMINÉ 

All Condition Operations and Innovative Cockpit Infrastructure (ALICIA)

Date du début: 1 sept. 2009, Date de fin: 31 août 2014,

"ALICIA addresses the ACARE objective of increasing time efficiency within the future air transport system. The aim will be to develop a new and scalable cockpit application which can extend operations of aircraft in degraded conditions – “All Conditions Operations”. A key objective will be to deliver an extensible application that can be applied to many aircraft types. This will necessarily enta ...
Voir le projet

 42

 TERMINÉ 

Frequency Agile Microwave Bonding System (FAMOBS)

Date du début: 1 nov. 2008, Date de fin: 31 oct. 2012,

The cost of packaging in microelectronics is around 30% of total production costs, but this is rising at an alarming rate due to the increasing consumer demand for smaller and smarter portable electronic devices. In micro-systems, the costs of packaging can be up to 80% of total production costs. Technological advances to reduce packaging costs are therefore of pivotal importance to maintain the c ...
Voir le projet

 16

 TERMINÉ 
Voir le projet

 113