Rechercher des projets européens

30 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Imaging the Force of Cancer (FORCE)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2019,

Cancer is the second leading cause of mortality in EU member states with ~90% of all cancer deaths caused by metastatic spread. Despite its significance, measuring metastatic potential as well as potential indicators of therapy efficacy remain unmet clinical challenges. Recently, it has been demonstrated in vitro, that aggressive metastatic cells pull on their surroundings suggesting that metastat ...
Voir le projet

 18

 TERMINÉ 

Platform-aware Model-driven Optimization of Cyber-Physical Systems (oCPS)

Date du début: 1 nov. 2015, Date de fin: 31 oct. 2019,

Many modern industrial systems fall in the realm of Cyber-Physical Systems (CPS) because of the tight interaction between computation, communication and control elements (the cyber part), and physical processes such as motion, heating/cooling, vibration, wear and tear (the physical part) within these systems. Traditional design methods involve multiple, often isolated, design phases involving diff ...
Voir le projet

 8

 TERMINÉ 

Advancing Smart Optical Imaging and Sensing for Health (ASTONISH)

Date du début: 1 juin 2016, Date de fin: 31 mai 2019,

The ageing population and related increase in chronic diseases put considerable pressure on both the healthcare system and the society, resulting in an unsustainable rise of healthcare costs. As a result there is an urgent need to improve efficiency of care and reduce hospitalisation time in order to control cost and increase quality of life. Addressing this need, medical applications need to beco ...
Voir le projet

 25

 TERMINÉ 
ENABLE-S3 will pave the way for accelerated application of highly automated and autonomous systems in the mobility domains automotive, aerospace, rail and maritime as well as in the health care domain. Virtual testing, verification and coverage-oriented test selection methods will enable validation with reasonable efforts. The resulting validation framework will ensure Europeans Industry competiti ...
Voir le projet

 76

 TERMINÉ 

MUltiSectoral Integrative approaches to CArdiac care (MUSICA)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2018,

MUltiSectoral Integrative approaches to CArdiac care – MUSICA - is proposed by a team of universities, companies and hospitals from 4 EU countries (Italy, United Kingdom, The Netherlands, Belgium). The main scope of MUSICA is to structure a new trans-sectoral and multidisciplinary network capable of developing research and technology with no barriers between academia, industries and clinicians in ...
Voir le projet

 10

 TERMINÉ 

MANGO: exploring Manycore Architectures for Next-GeneratiOn HPC systems (MANGO)

Date du début: 1 oct. 2015, Date de fin: 30 sept. 2018,

MANGO targets to achieve extreme resource efficiency in future QoS-sensitive HPC through ambitious cross-boundary architecture exploration for performance/power/predictability (PPP) based on the definition of new-generation high-performance, power-efficient, heterogeneous architectures with native mechanisms for isolation and quality-of-service, and an innovative two-phase passive cooling system. ...
Voir le projet

 9

 TERMINÉ 

Large Organic Robust Imager for X-ray sensing (LORIX)

Date du début: 1 févr. 2015, Date de fin: 31 juil. 2018,

General X-ray image sensing is undergoing a major transition away from analog solutions towards Direct Radiography using digital Flat-Panel Detector (FPD) technology, offering immediate imaging, large productivity, lower dose and portability. LORIX will develop, prototype and demonstrate large area X-ray FPD detectors enabled by TOLAE technology by combining a printed Organic Photo Diode (OPD) wit ...
Voir le projet

 12

 TERMINÉ 

An integrated pilot line for micro-fabricated medical devices (InForMed)

Date du début: 1 juin 2015, Date de fin: 31 mai 2018,

...ot line for medical devices. The pilot line includes micro-fabrication, assembly and even the fabrication of smart catheters. The heart of this chain is the micro-fabrication and assembly facility of Philips Innovation Services, which will be qualified for small/medium-scale production of medical devices. The pilot facility will be open to other users for pilot production and product validation. I ...
Voir le projet

 40

 TERMINÉ 

Cyber Physical System based Proactive Collaborative Maintenance (MANTIS)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2018,

The overall concept of MANTIS is to provide a proactive maintenance service platform architecture based on Cyber Physical Systems that allows to estimate future performance, to predict and prevent imminent failures and to schedule proactive maintenance. Maintenance is no longer a necessary evil that costs what it costs, but an important function that creates additional value in the business proces ...
Voir le projet

 47

 TERMINÉ 

USER-CENTRIC MANAGEMENT OF SECURITY AND DEPENDABILITY IN CLOUDS OF CLOUDS (SUPERCLOUD)

Date du début: 1 févr. 2015, Date de fin: 31 janv. 2018,

Today, despite its unravelling business benefits, distributed cloud computing raises many security and dependability concerns. Root causes include increase in complexity and lack of interoperability between heterogeneous, often proprietary infrastructure technologies. SUPERCLOUD thus proposes new security and dependability infrastructure management paradigms that are : 1) user-centric, for self-se ...
Voir le projet

 11

 TERMINÉ 

Integrated Spectrometers for Spectral Tissue Sensing (InSPECT)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2017,

Image-guided needle procedures - such as taking biopsies in screening cancerous tumours - are becoming increasingly important in clinical practice. Today, physicians are severely hampered by the lack of precision in positioning the needle tip. Real-time tissue-characterization feedback at the needle tip during these procedures can significantly improve the outcome of diagnosis and treatment, and r ...
Voir le projet

 9

 TERMINÉ 
The undergoing transformation in our current socio-economic models, led by the advent of emerging technologies, has changed the relation of customers to products and services. Customers play no longer a passive role in the product and service development process as they express their product and service experiences and opinions through several channels such as discussion forums, blogs, chat, idea ...
Voir le projet

 13

 TERMINÉ 
...y navigating “in the blind”, using indirect measures as well as their anatomical experience to decide where they should inject. The INTUI-VIEW solution will change this.In the INTUI-VIEW project, Philips, B.Braun and Oslo University Hospital are partnering in order to bring an ultrasound tablet solution with needle tracking technology to the market. The solution is a revolutionary and new techniqu ...
Voir le projet

 4

 TERMINÉ 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Voir le projet

 101

 TERMINÉ 
ALMARVI aims at providing cross-domain many-core platform solution, system software stack, tool chain, and adaptive algorithms that will enable massive data-rate image/video processing with high energy efficiency. ALMARVI will provide mechanisms and support for high degree of adaptivity at various system layers that will abstract the variations in the underlying platforms (e.g., due to imperfectio ...
Voir le projet

 19

 TERMINÉ 

VPH Dementia Research Enabled by IT (VPH-DARE@IT)

Date du début: 1 avr. 2013, Date de fin: 31 mars 2017,

The DementiA Research Enabled by IT project responds to the European Parliament's 2011 resolution for a European Initiative on Alzheimer's disease and other dementias, and the EU Year of the Brain 2014 Initiative. It delivers the first patient-specific predictive models for early differential diagnosis of dementias and their evolution. Its mechanistic/phenomenological models of the ageing brain ac ...
Voir le projet

 22

 TERMINÉ 
HoliDes addresses development and qualification of Adaptive Cooperative Human-Machine Sys-tems (AdCoS) where many humans and many machines act together, cooperatively, in a highly adaptive way. They adapt to each other and to the context to guarantee fluent and cooperative task achievement. Such systems with higher levels of automation are urgently needed to enhance safety and to increase the conf ...
Voir le projet

 32

 TERMINÉ 

Critical System Engineering Acceleration (CRYSTAL)

Date du début: 1 mai 2013, Date de fin: 31 juil. 2016,

CRYSTAL aims at fostering Europe’s leading edge position in embedded systems engineering in particular regarding quality and cost effectiveness of safety-critical embedded systems and architecture platforms.Its overall goal is to enable sustainable paths to speed up the maturation, integration, and cross-sectoral reusability of technological and methodological bricks of the factories for safety-cr ...
Voir le projet

 70

 TERMINÉ 

Devices for Neurocontrol and Neurorehabilitation (DENECOR)

Date du début: 1 juin 2013, Date de fin: 31 mars 2016,

The primary aim of DeNeCor is to resolve this top issue such that electronic neuromodulation therapy becomes mainstream and full market potential can be obtained. We will increase acceptance by neurologists by demonstrating designed co-existency between therapy devices and diagnostic systems. The second aim of DeNeCor is to extrapolate the ‘bilateral’ agreements between AIMD and MRI manufactures i ...
Voir le projet

 22

 TERMINÉ 

Enhanced Power Pilot Line - EPPL (EPPL)

Date du début: 1 avr. 2013, Date de fin: 31 mars 2016,

A sustainable and competitive European power semiconductor industry is essential to support the megatrend developments formulated in the Europe 2020 strategy - climate change, energy security, food security, and health and aging population. In practically all these areas, power semiconductors play a vital role. Thus, it is of paramount importance to defend and further extend Europe’s leading posit ...
Voir le projet

 33

 TERMINÉ 

SMArt systems Co-design (SMAC)

Date du début: 1 oct. 2011, Date de fin: 31 mars 2015,

Smart systems consist of heterogeneous subsystems and components providing different functionalities; they are normally implemented as "Multi-Package on a Board". To fully exploit the potential of current nanoelectronics technologies, as well as to enable the integration of existing/new IPs and "More than Moore" devices, smart system miniaturization and "Multi-Chip in a Package" implementation are ...
Voir le projet

 18

 TERMINÉ 

Enable power technologies on 300mm wafer diameter (EPT300)

Date du début: 1 avr. 2012, Date de fin: 1 mars 2015,

EPT 300 aims to be a decisive step forward to strengthen Europe’s leading position in power semiconductor technologies and More-than-Moore manufacturing capabilities relating to energy efficient electronic solutions. Power semiconductor devices fabricated in a European leading pilot line for 300mm wafer production are the scope of the project, for which manufacturing excellence, cost competitivene ...
Voir le projet

 22

 TERMINÉ 

Ultra Wide Context Aware Imaging (PANORAMA)

Date du début: 1 janv. 2012, Date de fin: 1 déc. 2014,

In many application domains all over the world there is a trend from “single-view imaging” towards “multi-view imaging”. Some examples are the introduction of 3D/4D imaging in Healthcare, High Definition TV and beyond in Broadcasting, multiple connected Surveillance Cameras for monitoring a scene. These applications have in common that they all involve an explosive growth in the generation of imag ...
Voir le projet

 17

 TERMINÉ 

High-throughput Production of FunctIonal 3D images of the brain (HIGH PROFILE)

Date du début: 1 avr. 2011, Date de fin: 30 juin 2014,

"HIGH PROFILE combines industrial and clinical driven R&D activities dealing with image diagnostic platforms for the central nervous system. The project’s approach is to progress state-of-the-art by integrating imaging equipment for diagnostics –including algorithms, equipment and infrastructure for massive image processing and simulation– to support combinations of images from different medical e ...
Voir le projet

 20

 TERMINÉ 
Description To investigate a statistical-runtime-feedback-driven optimisation that will improve performance of multicore interconnected processors with applications in medical imaging and biometric recognitionWhereas in the 1990s the speed of computer hardware doubled every 18 months while the software technologies remained largely stable ...
Voir le projet

 10

 TERMINÉ 

Central Nervous System Imaging (CSI)

Date du début: 1 mars 2010, Date de fin: 1 févr. 2013,

Diseases affecting the brain and the central nervous system are among those with the greatest impact on our society. The ENIAC JU project CSI aims to advance the state of the art in three-dimensional (3D) medical-imaging platforms to improve the efficiency of the diagnosis and therapy of these serious diseases. The objective of the project is to develop an innovative yet simple and low-cost smart ...
Voir le projet

 15

 TERMINÉ 
Cardiovascular disease (CVD) has a significant impact on the European society in terms of mortality, morbidity and allied healthcare costs. The opportunity of multi-scale modelling spanning, sub-cellular level up to whole heart is to improve CVD outcomes by providing a consistent, biophysically-based framework for the integration of the huge amount of fragmented and inhomogeneous data currently av ...
Voir le projet

 21

 TERMINÉ 

Osteoporotic Virtual Physiological Human (VPHOP)

Date du début: 1 sept. 2008, Date de fin: 31 oct. 2012,

Nearly four million osteoporotic bone fractures cost the European health system more than 30 billion Euro per year. This figure could double by 2050. After the first fracture, the chances of having another one increase by 86%. We need to prevent osteoporotic fractures. The first step is an accurate prediction of the patient-specific risk of fracture that considers not only the skeletal determin ...
Voir le projet

 21

 TERMINÉ 
More than half a million people live in Europe on chronic renal replacement therapy by hemodialysis (HD). This number increases annually at a constant rate of 8%. The Achilles heel of HD is the vascular access (VA) used to connect patient circulation to the artificial kidney. The current recommendation for VA is the native arteriovenous fistula (AVF), surgically created in the forearm. VA dysfunct ...
Voir le projet

 10

 TERMINÉ 

Healthcare Interoperability Testing and Conformance Harmonization (HITCH)

Date du début: 1 janv. 2010, Date de fin: 30 juin 2011,

"eHealth, the beneficial application of ICT-based systems and solutions, has been identified as potentially the key enabler to fundamentally improve patient safety in clinical contexts" . However, with ICT becoming a mission critical component of healthcare processes, the interoperability of the multitude of systems that together form the eHealth infrastructure of a hospital, region or nation, is ...
Voir le projet

 13