Rechercher des projets européens

24 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
As the number of older people in Europe grows, increasing healthy life years is a priority. Cognitive decline, dementia (e.g. Alzheimer’s disease, AD), sleep disturbances and depression, all related to psychological distress and anxiety, are significant drivers of reduced quality of life in older adults. This project builds on evidence that lifestyle factors and meditation practice have the potent ...
Voir le projet

 12

 TERMINÉ 
Organized crime is becoming more diverse in its activities and methods including “greater levels of collaboration between criminal groups, greater mobility in and around the EU, a diversification of illicit activity, and a growing dependence on a dynamic infrastructure, anchored in key locations and facilitated by widespread use of the Internet” (the Director of Europol, in his foreword to the OCT ...
Voir le projet

 19

 TERMINÉ 
To meet the EU’s ambitious targets for carbon emission reduction, renewable energy production must strongly be upgraded and made more efficient and capable for grid energy storage. Alpine Foreland Basins feature a unique geological inventory which can contribute substantially to tackle these challenges. Deep ‘Molasse’ basins at the fringe of the Alpine mountain range offer an abundant geothermal p ...
Voir le projet

 14

 TERMINÉ 
SARABAND project aims to take advantage of the Q-band frequency (40,5 to 43,5 GHz) in a cost effective way to provide higher performing and integrated network nodes for wireless backhaul of future mobile radio and last mile access for the digital divide by developing smart antennas and front-end radio modules. The use of millimeter waves, particularly the Q-band where 3GHz bandwidth has been regul ...
Voir le projet

 10

 TERMINÉ 

Observatory Network to Enhance ICT Structural Funds Absorption (ONE)

Date du début: 31 déc. 2011, Date de fin: 29 juin 2014,

ONE aims at improving the regional capacity of planning ICT investments under Coeshion Policy Programmes through the setting up of a Federated network of regional ICT observatories in Poland, Germany, Italy, Czech Republic, UK, France and Cyprus. Capacity to plan, assess and manage investments in the field of ICT represents a crucial aspect of Innovation policy activity as accessibility, both in t ...
Voir le projet

 11

 TERMINÉ 

Air Transport Net (AirTN) (AirTN)

Date du début: 1 janv. 2010, Date de fin: 31 déc. 2013,

The AirTN ERA-Net was established under FP6 as a network of Member States whose ministries and agencies manage public funded national research activities and programmes in Aeronautics and Air Transport. The results from AirTN in FP6 are prerequisites for the implementation of joint activities to enhance co-operation and coordination of national and regional research programmes. AirTN in FP7 will s ...
Voir le projet

 25

 TERMINÉ 

4 Dimension Contracts - Guidance and Control (4DCO-GC)

Date du début: 1 nov. 2010, Date de fin: 31 oct. 2013,

"The 4DCo-GC project aims at exploring the concept of ""4D Contract guidance and control of the aircraft"" as a step change in air transport operations by providing a more radical and environmentally efficient solution for the management of the airspace. Scientific objectives of 4DCo-GC are to:- model 4D contract concepts (strategic, tactical and emergency levels)- develop algorithms (strategic, t ...
Voir le projet

 13

 TERMINÉ 

HIRF Synthetic Environment (HIRF SE)

Date du début: 1 déc. 2008, Date de fin: 31 mai 2013,

"The HIRF SE research project has the goal of providing the aeronautics industry with a framework which can be used during the development phase to mitigate the EM aspects. In addition it will provide a considerable reduction in the certification/qualification tests required on air vehicle. The HIRF SE main objectives can be summarized by the two followings items: • Full validated and integrated s ...
Voir le projet

 45

 TERMINÉ 
The CAAST-Net project will establish a platform to promote improved cooperation in science and technology between Europe and Sub-Saharan Africa. To achieve this objective, CAAST-Net will analyse the current European and African S&T cooperation landscape, and undertake S&T policy analyses. Informed by the outcomes of analyses, CAAST-Net will initiate and support European-African S&T policy dialogu ...
Voir le projet

 25

 TERMINÉ 
"The PPlane project is a direct follow up study to Out-of-the-Box project that aimed to identify potential new concepts and technologies for future air transport and focused on a number of radical changes to the system rather than taking incremental steps.As a result of the Out-of-the-Box project, PPlane implements a systematic approach to radical and novel ideas for Personal Air Transport System ...
Voir le projet

 13

 TERMINÉ 
RENAISSANCE aims to develop a valid, reliable and integrated package of access and mobility measures for historic cities. These will make possible the rediscovery, preservation and enhancement of historic cities in Europe, together with the sustainable development of the local economy, to the benefit of visitors, residents and local business alike. RENAISSANCE brings together a group of historic/t ...
Voir le projet

 30

 TERMINÉ 
Transport security and accessibility are essential for a balanced and sustainable development of ASP. Due to current climatic trends, the vulnerability of transport infrastructure to natural hazards has increased. But the specific threats to transport infrastructure have not yet been tackled in a systematic joint effort. Therefore the goal of PARAmount is to improve risk management strategies for ...
Voir le projet

 13

 TERMINÉ 

Quantitative Assessment of Secondary Spectrum Access (QUASAR)

Date du début: 1 janv. 2010, Date de fin: 30 juin 2012,

The need for the radio spectrum for the rapidly growing broadband access services is evident. Abundant and fast access to spectrum has three main advantages: it fosters rapid innovation in wireless systems and services lowering entry barrier on the market; it enables affordable mobile broadband access to all; and makes new energy efficient wireless systems possible. Secondary use of already lice ...
Voir le projet

 11

 TERMINÉ 

Cost-Efficient Methods and Processes for Safety Relevant Embedded Systems (CESAR)

Date du début: 1 mars 2009, Date de fin: 30 juin 2012,

"The embedded safety-critical systems design and development industry is facing increasing complexity and variety of systems and devices, coupled with increasing regulatory constraints while costs, performances and time to market are constantly challenged.This has led to a profusion of enablers (new processes, methods and tools), which are neither integrated nor interoperable because they have bee ...
Voir le projet

 54

 TERMINÉ 
"The goal of this project is to elaborate an open architecture for the operation of unmanned air-to-ground wide area land and sea border surveillance platforms in Europe. This architecture is based on analysis of concepts and scenarios for UAV-based aerial surveillance of European borders. It takes into account the emerging legislation for insertion of UAS into controlled civil airspace. The techn ...
Voir le projet

 14

 TERMINÉ 

South East European Transport Axis Cooperation (SEETAC)

Date du début: 31 mars 2009, Date de fin: 30 mars 2012,

The existing SEE transport framework & network are inadequate to actual requirements. For too long the relevant institutions were concentrating on national infrastructures where most of the investments have been made to the detriment of the trans-national implications. Current transport facilities, mostly in the non-EU countries are way beneath international standards mainly because of insufficien ...
Voir le projet

 21

 TERMINÉ 

End-to-End Efficiency (E3) (E3)

Date du début: 1 janv. 2008, Date de fin: 31 déc. 2009,

The End-to-End Efficiency (E3) project is an ambitious FP7 EC Integrated Project (IP) aiming at integrating cognitive wireless systems in the Beyond 3G (B3G) world, evolving current heterogeneous wireless system infrastructures into an integrated, scalable and efficiently managed B3G cognitive system framework. The key objective of the E3 project is to design, develop, prototype and showcase solut ...
Voir le projet

 23

 TERMINÉ 
The Trans-European railway Rail Baltica, linking Helsinki – Tallinn – Riga – Kaunas – Warsaw and continuing on to Berlin, is to be developed within the territories of the co-operating EU Member States.The Interreg IIIB project Rail Baltica had two main goals: (a) the definition of the most favourable route for the Rail Baltica railway link in terms of spatial planning and regional development, and ...
Voir le projet

 23

 TERMINÉ 

Baltic Energy Efficiency Network for the Building Stock (BEEN)

Date du début: 20 juin 2005, Date de fin: 30 déc. 2007,

Buildings account for more than 40% of the overall energy consumption in the EU, of which two-thirds are consumed in residential buildings. Thereby, the standard of the buildings varies greatly and low thermal quality primarily occurs in the prefabricated multi-storey housing stock in the Central and Eastern European member states. This fact also implies huge potentials for energy savings and the ...
Voir le projet

 26

 TERMINÉ 

SUSTAINABLE TRANSPORT IN THE BARENTS REGION - PHASE II (STBR II)

Date du début: 10 janv. 2006, Date de fin: 29 déc. 2007,

The objective of the STBR process is to develop a transport strategy for the whole of Barents Region jointly, and as an outcome propose and prepare concrete measures, which in due time can be included in national investment programs of each country. The strategy will rest on the realisation that the transport authorities of all countries need to see the Barents Region as a common transport area an ...
Voir le projet

 26

 TERMINÉ 
« MOBILMED » sintéresse à la problématique des transports dans des zones difficilement accessibles ou fragiles, telles que les îles. Le projet prévoit de coordonner différentes typologies dactivités dont le but est danalyser et de développer une mobilité « durable » dans les systèmes insulaires et sur les zones côtières. Des actions concrètes seront identifiées pour préserver ces régions de la Méd ...
Voir le projet

 5

 TERMINÉ 

SUSTRAIN Implement Corridor (SIC!)

Date du début: 31 déc. 2002, Date de fin: 30 juil. 2006,

With the 2004 enlargement the EU area has increased by about 75 million people. A GDP of only 23-68% of the EU average and long transport routes do not only increase the imbalance between Europe's economic core area - London, Paris, Milan, Munich (Blue Banana) and Hamburg and periphery, the regional development and growth opportunities of the new EU countries are also on the decline. However, the ...
Voir le projet

 18

 TERMINÉ 
Short description: The general objective of the project is to increase the competitiveness of the Lithuania-Poland border region and to improve conditions of the socio-economic co-operation in it, while rebuilding and reconstructing parts of the old local and regional roads and while strengthening infrastructure development administrative capacities of the regional institutions. The project is imp ...
Voir le projet

 10

 TERMINÉ 
Quality in VET (Vocational Education and Training) has been actively developed in European cooperation during the recent years. Also numerous good practices of work-based learning have been created in VET as results of innovative projects. Only in Finland hundreds of projects have deleveloped the quality of VET and work-based learning and gained remarkable results. Althoughresults are well-known a ...
Voir le projet

 11