Rechercher des projets européens

12 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Supporting intermodal transport solutions in the Adriatic area (INTERMODADRIA)

Date du début: 30 sept. 2012, Date de fin: 27 févr. 2015,

... transport services between the ports and their own hinterlands. Currently, the Adriatic ports have different level of accessibility to the inland transport infrastructures: even if the ports and the national governments have undertaken significant investments to increase the railways accessibility and the connection to the national railways network, not all the ports will be served in the present ...
Voir le projet

 11

 TERMINÉ 

Adriatic - Danube - Black Sea multimodal platform (ADB multiplatform)

Date du début: 31 mars 2012, Date de fin: 29 sept. 2014,

...and promote environmentally friendly, multimodal transport solutions from the ports in the SEE programme area (Black Sea, Aegean, Adriatic) to inland countries and regions along a selected pilot transnational network. This will be done by developing and establishing a "multimodal transport development platform", which integrates different regions and stakeholders from the transport business. ADB M ...
Voir le projet

 43

 TERMINÉ 

ROad safety in South East European regions  (ROSEE)

Date du début: 30 sept. 2012, Date de fin: 29 sept. 2014,

...roads while 37% of fatalities are counted in built-up areas. 44% involves vulnerable road users such as pedestrians, cyclists and riders of powered two-wheelers. ROSEE will support governments at the national and regional level in the selected South-East European regions to improve coordination in promoting, planning and operation of primary and secondary road networks with an emphasis on improvin ...
Voir le projet

 10

 TERMINÉ 

Intelligent Transportation for Dynamic Environment (InTraDE)

Date du début: 2 oct. 2007, Date de fin: 30 mars 2014,

... the developed system, Scientific and other communication articles in conferences and academic journals, newspapers, and specialised magazines have been published, The workings of transnational collaboration have been reported in order to serve as "lessons learned" for future projects, The project completed the transferability actions of the developed IAV concept to other application d ...
Voir le projet

 7

 TERMINÉ 

Danube Inland Harbour Development (DaHar)

Date du début: 31 mars 2011, Date de fin: 30 mars 2014,

The DaHar partnership represents small and medium sized Danube cities with ports of international importance. The economic development and participation in the economic circulation of these cities could be enhanced through the optimal utilisation of port development in the frame of enhancing waterway cargo transport on the Danube in a transnational context. To this end, DaHar partners wish to util ...
Voir le projet

 23

 TERMINÉ 

Channel Arc Manche Integrated Strategy (CAMIS - EMDI+)

Date du début: 29 févr. 2008, Date de fin: 30 déc. 2013,

Objectif général :Le projet CAMIS – EMDI+ a pour but de mettre en œuvre une politique maritime intégrée dans l'espace Manche tout en stimulant des coopérations concrètes entre acteurs. Le projet propose de développer un cadre pour une gouvernance maritime (stratégie maritime intégrée, instance de concertation entre acteurs), de créer un centre de ressources pour la coopération et la gouvernance de ...
Voir le projet

 19

 TERMINÉ 
...ese are caused by an accident involving heavy vehicle. The problem C.A.S.H. addresses is traffic safety of Heavy Goods Vehicles (HGV's), including Dangerous Goods (DG) and oversized transport in international traffic in each of the participating countries/regions. Although EU legislation on HGV and DG transport is being harmonised at the European level, the implementation and interpretation of exi ...
Voir le projet

 13

 TERMINÉ 

Sustainable Urban Goods logistics Achieved by Regional and local policies (SUGAR)

Date du début: 31 oct. 2008, Date de fin: 28 févr. 2012,

...:• Training sessions, workshops and joint planning events, in which the administrations will directly benefit from participation through the knowledge gained and successively utilised in addressing national, regional and municipal policy developments;• Development of city logistics publications and training products, which will record the knowledge gained during SUGAR.The SUGAR sites use these too ...
Voir le projet

 17

 TERMINÉ 

ISO Shipping Container Tracking and Monitoring System (ISOTRACK)

Date du début: 1 nov. 2008, Date de fin: 31 oct. 2011,

"90% of all cargo moves in containers and approximately 250 million are shipped annually. There were 1138035 SMEs in EU 25 as of 2003 in the transport and communications industry. The SME segment of the road transport industry in EU 25 employs 3.2 Million people, whilst 107200 personnel are employed in the SME maritime transport industry. Our member transport operators face theft of goods, illegal ...
Voir le projet

 14

 TERMINÉ 

Baltic Tangent

Date du début: 3 janv. 2005, Date de fin: 2 mai 2007,

...structure network linked to the main TEN north-south transport routes in Scandinavia and the Baltic States with links further east. The BT project outcome was expected to add new perspectives to transnational cooperation for the development of the southeast Baltic Sea Region and its relation to the Russian and far east markets. The project will accordingly also generate knowledge of general intere ...
Voir le projet

 34

 TERMINÉ 
The project will develop a complete training 'toolkit' to improve the competencies of owners and managers of SMEs, with regard to their entrepreneurial skills, in an effort to enhance their companies' economic growth and competitiveness. The project will address the needs of individual SMEs and clusters of SMEs. The project 'toolkit' will enable managers/owners of SMEs to analyse their capabilitie ...
Voir le projet

 12

 TERMINÉ 
...the customisation of solutions to SMEs. While work package 3 will be focused on the set-up of the framework and methodology for living lab creation, work packages 4 and 5 will each implement one international living lab, comprised of 5 local pilots, respectively. The first international living lab, implemented within WP4, will develop eServices for SMEs in order to improve the energy efficiency of ...
Voir le projet

 10