Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Organic Bioelectronics (ORGBIO)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2017,

Organic Bioelectonics is a new discipline which holds promise to shape, direct, and change future medical treatments in a revolutionary manner over the next decades. At the moment Europe has a unique leading position in this area, being almost all the world-leading groups in this field located in Europe and constituting the core of this international training network. However, realizing the promis ...
Voir le projet

 15

 TERMINÉ 

Photonic Libraries And Technology for Manufacturing (PLAT4M)

Date du début: 1 oct. 2012, Date de fin: 31 mars 2017,

Description "PLAT4M will make silicon photonics ready for transition to industry"Silicon is now a mature integration platform that has brought CMOS microelectronics to mass-market application. The PLAT4M vision is that silicon photonics will lead to a similar revolution in the photonics sector.Over the past years silicon photonics has see ...
Voir le projet

 18

 TERMINÉ 

Arrowhead (ARROWHEAD)

Date du début: 1 mars 2013, Date de fin: 28 févr. 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Voir le projet

 87

 TERMINÉ 
Providing broadband wireless communications to a majority of European citizens is a major objective of the EC at the horizon of 2020. With a current annual growth rate in the range of 70%, the mobile data traffic of smartphones, tablets, machine-to-machine and other portable devices dramatically challenges the 4G wireless cellular network currently under deployment. To sustain this growth, high da ...
Voir le projet

 15

 TERMINÉ 

Integrated Reconfigurable silicon photonic based optical Switch (IRIS)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2016,

IRIS aims at fabricating a highly integrated, scalable, transparent and high capacity WDM Photonic Switch used as an Transponder Aggregator (TPA),a novel function which will be added to existing ROADM nodes without disrupting their architecture while adding attributes such as colourless, directionless and contentionless. For Metro networks, this switch will provide flexibility, energy efficiency, ...
Voir le projet

 8

 TERMINÉ 

ACTive Implant for Optoacoustic Natural sound enhancement (ACTION)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2016,

The ACTION project builds on the recent discovery that relatively low levels of pulsed infrared laser light are capable of triggering activity in hair cells of the partially hearing (hearing impaired) cochlea and vestibule. So far the excessively large volume of optical fibre systems and external light sources used for animal studies prevented the practical use of this discovery for long term anim ...
Voir le projet

 7

 TERMINÉ 
Description CONTREX (Design of embedded mixed-criticality CONTRol systems under consideration of EXtra-functional properties)Abstract – Up to now mission & safety critical services of Systems of Systems (SoS) have been running on dedicated and often custom designed Hardware/Software platforms. In the near future such systems will be accessib ...
Voir le projet

 15

 TERMINÉ 
Description A flexible architecture compatible with current infrastructures and low cost components based on silicon photonics: the keys for mass Fiber-To-The-Home ultra-broadband deployment FABULOUS will design, develop and characterize new Silicon Photonics components for application in next-gen ...
Voir le projet

 8

 TERMINÉ 

ClouT: Cloud of Things for empowering the citizen clout in smart cities (ClouT)

Date du début: 1 avr. 2013, Date de fin: 30 juin 2016,

ClouT's overall concept is leveraging the Cloud Computing as an enabler to bridge the Internet of Things with Internet of People via Internet of Services, to establish an efficient communication and collaboration platform exploiting all possible information sources to make the cities smarter and to help them facing the emerging challenges such as efficient energy management, economic growth and de ...
Voir le projet

 6

 TERMINÉ 
Network operators are looking for cost effective solutions to manage and upgrade their networks to meet the user experience demanded by European citizens. The backhauling infrastructure is becoming a bottleneck.E3Network will design an E-band transceiver for the backhaul infrastructure of the future networks. It will work in the E-band, which enables highly focused "pencil beam" transmissions and ...
Voir le projet

 9

 TERMINÉ 

High Performance and Embedded Architecture and Compilation (HiPEAC)

Date du début: 1 janv. 2012, Date de fin: 29 févr. 2016,

The proposed HiPEAC network of excellence is a follow-up of an existing network and wants (i) to steer and to increase the European research in computing systems; (ii) to improve the quality of the European computing systems research, and (iii) to create a visible and integrated pan-European community in computing systems. The network is structured along four programs. The membership program aims ...
Voir le projet

 14

 TERMINÉ 
AVTR addresses the development of the complete Electrical powertrain optimised as a whole of systems:- Energy saving in pure urban drive up to 20% with respect to state of-the-art fixed transmission ratio,- Avoid the use of Permanent Magnet Motors because non optimal elements when integrated in a multi ratios transmission PWT. When designing for energy savings, the maximum efficiency is calculate ...
Voir le projet

 8

 TERMINÉ 
People with Parkinson's disease (PD) suffer from motor and cognitive impairments that severely impact mobility, fall risk, and multiple key aspects of functional independence. Until recently, treatment goals focused almost exclusively on symptom relief, but exciting recent work by CuPiD partners and others has demonstrated that motor learning and rehabilitation principles can be effective even in ...
Voir le projet

 9

 TERMINÉ 

Implantable Organic Nano-Electronics (iONE-FP7)

Date du début: 1 mars 2012, Date de fin: 28 févr. 2015,

The vision of iONE-FP7 is to exploit for the first time flexible organic electronics for the development and testing of Active Multifunctional Implantable Devices (AMIDs) to treat Spinal Cord Injury (SCI). The devices will (a) have long-term stability associated to high biocompatibility and safety, (b) have reduced risk of a host versus graft immune response, (c) mimic the local microenvironment f ...
Voir le projet

 13

 TERMINÉ 
Extending product functionality and improving their lifetime requires additional features to satisfy the growing customer's needs as well as new market and technology trends. For example, a network Intrusion Detection System needs to scan all incoming network packets for suspicious content. The scanning has to be at "line-speed" so that the monitored communication links are not slowed down, while ...
Voir le projet

 8

 TERMINÉ 
The e-HIMALAYA project aims at prototyping innovative GNSS-based core technologies and concepts, with the objective to build key Galileo differentiators in a multi-GNSS hybridized receiver.Several markets are addressed with the main weight put on Mass-Market and transport, which represents the main Galileo receiver market.The project will develop a list of key features to enable a higher penetrati ...
Voir le projet

 7

 TERMINÉ 

uBiquitous, secUre inTernet-of-things with Location and contExt-awaReness (BUTLER)

Date du début: 1 oct. 2011, Date de fin: 31 oct. 2014,

Recent ICT advances are bringing to reality a world where sensors, actuators and smart portable devices are interconnected into an Internet-of-Things (IoT) ecosystem reaching 50 Billion devices by 2015.The IoT major challenges are, from a systemic viewpoint, smart resource management and digital security; and from a user/service perspective, the pervasiveness (uniformity of performance anytime an ...
Voir le projet

 23

 TERMINÉ 

immersiVe ENhancemenT of User-woRld Interactions (VENTURI)

Date du début: 1 oct. 2011, Date de fin: 30 sept. 2014,

Augmented Reality (AR) is a concept and a vision that has been with us, and will be with us, for the foreseeable future. We're already augmented today using mobile devices with a connection to the Internet allowing us to almost instantly gain access to the collective global human knowledge. We're starting to add visual augmentation into some devices, but we are only tapping into a small part of th ...
Voir le projet

 9

 TERMINÉ 
"The activity is focused on the design and development of a ""ready-to-market"" single chip GNSS mass marketreceiver for GPS, EGNOS and GALILEO signals.Based on the wide expertise of STM in building high performance, ultra low power consumption receivers for the mass market and on the large experience and involvement of the consortium partners in the different domains (mass market AGNSS leading ro ...
Voir le projet

 11

 TERMINÉ 

Making Sense of Nonsense (iSense)

Date du début: 1 janv. 2011, Date de fin: 31 déc. 2013,

Description The emergence of networked embedded systems and sensor/actuator networks has made possible the collection of large amount of real-time data about a monitored environment. In many cases the collected data may be incomplete, or it may not make sense, thus compromising the sensor-environment interaction and possibly affecting the ab ...
Voir le projet

 5

 TERMINÉ 
"The objective of POLLUX is to develop a distributed real time embedded systems platform for next generation electric vehicles, by using a component and programming-based design methodology. Reference designs and embedded systems architectures for high efficiency innovative mechatronics systems will be addressed with regard to requirements on composability, networking, security, robustness, diagno ...
Voir le projet

 37

 TERMINÉ 
The main objective of the COMPLEX project is to increase the competitiveness of the European semiconductor, system integrator and EDA industry by addressing the problem of platform-based design space exploration under consideration of power and performance constraints early in the design process. High performance usually causes high power consumption. A main challenge in today's embedded system de ...
Voir le projet

 15

 TERMINÉ 

Embedded Reconfigurable Architectures (ERA)

Date du début: 1 janv. 2010, Date de fin: 31 mars 2013,

Description To develop an embedded system platform that dynamically adapt itself to the applications. The platform will be open-source: both the industry and academia can use it for fast design-space prototypingThe design of embedded systems such as mobile smartphones becomes increasingly more complex as multi-core processors are needed t ...
Voir le projet

 11

 TERMINÉ 
Description New tools for application development on many-core systemsThe current trend in computing architectures is to integrate in embedded devices an increasing number of processing cores. Latest generation smart phones carry two processors plus graphic accelerators while in the near future we can envision to scale up to 16 or 32 proc ...
Voir le projet

 8

 TERMINÉ 
Description Synaptic project targets the optimisation of manufacturability and the reduction of systematic variations in nanometer technologiesSynaptic project targets the optimisation of manufacturability and the reduction of systematic variations in nanometer technologies through exploitation of regularity at the architectural, structur ...
Voir le projet

 8

 TERMINÉ 

A Highly Efficient Adaptive Multi-processor Framework (HEAP)

Date du début: 1 févr. 2010, Date de fin: 31 janv. 2013,

Description Making modern embedded systems faster and less power hungry by parallelizationWriting parallel programs has traditionally been considered a difficult task, even when parallelism is taken into account from the beginning. Moreover there is an urgent need to parallelize the massive amounts of legacy sequential code so as to incre ...
Voir le projet

 11

 TERMINÉ 

Embedded Organic Memory Arrays (MOMA)

Date du début: 1 janv. 2010, Date de fin: 31 déc. 2012,

The advent of non-volatile flash memory -- silicon-based semiconductor memory that does not lose its data when the power is turned off -- revolutionized consumer electronics. Similar types of organic memory will play a pivotal role in the wide range of new market opportunities of flexible electronics based on organic transistor technology. Currently, these memory elements do not exist, thus formin ...
Voir le projet

 6

 TERMINÉ 

COntent Aware Searching, retrieval and sTreaming (COAST)

Date du début: 1 févr. 2010, Date de fin: 31 juil. 2012,

Towards the Future Internet age, COAST aims to build a Future Content-Centric Network (FCN) architecture, able to offer network-wide Service Level Agreements (SLAs) in service discovery and content consumption. In COAST FCN, the users will specify solely which content or web service they need and the COAST framework will find and deliver the desired or the most relevant data in an efficient, timel ...
Voir le projet

 11

 TERMINÉ 
BRAVEHEALTH proposes a patient-centric vision to CVD management and treatment, providing people already diagnosed as subjects at risk with a sound solution for continuous and remote monitoring and real time prevention of malignant events. The solution proposed will be made up of the following sub-systems: 1)WEARABLE UNIT: it is an innovative concept of miniaturised multi-parameter sensor, able to ...
Voir le projet

 18

 TERMINÉ 

Next Generation Peer-to-Peer Content Delivery Platform (P2P-Next)

Date du début: 1 janv. 2008, Date de fin: 30 avr. 2012,

P2P-Next develops an open source, efficient, trusted, personalized, user-centric, and participatory television and media delivery system with social and collaborative connotation using the emerging Peer-to-Peer (P2P) paradigm, which takes into account the existing EU legal framework.The P2P-Next integrated project will build a next generation Peer-to-Peer (P2P) content delivery platform, to be des ...
Voir le projet

 22

 TERMINÉ 

Aligning ResearCh AgenDas In ARTEMIS (ARCADIA)

Date du début: 1 nov. 2009, Date de fin: 31 janv. 2012,

There is a clear need for an ambitious pan-European approach to speed up the development of major technologies, by undertaking at the Community level large research actions taking into account National and Regional strategic R&D priorities. In the field of the Embedded Systems, ARTEMIS ETP has paved the way, but the ambition to align the research agendas drawn by the various European National/Regi ...
Voir le projet

 9

 TERMINÉ 

High Performance and Embedded Architecture and Compilation (HiPEAC)

Date du début: 1 févr. 2008, Date de fin: 31 janv. 2012,

Due to technology limitations, the domain of high-performance processors is experiencing a radical shift towards parallelism through on-chip multi-cores and chip customization leading to heterogeneous multi-core systems. Furthermore, the commodity market, the supercomputing market and the embedded market are increasingly sharing the same challenges, leading to convergence of the three markets.The ...
Voir le projet

 14

 TERMINÉ 
The White Paper on EU Transport Policy for 2010 states a key objective: 50% reduction of casualties due to road accidents by the end of 2010. Improvements on road safety are achievable increasing the EU market penetration of advanced driver assistance systems (ADAS), currently limited by performance and cost of sensor technologies.According to ICT-2007.6.1, ADOSE addresses research challenges in t ...
Voir le projet

 15

 TERMINÉ 

ICT Enabled Prediction of Cancer Reoccurrence (NeoMark)

Date du début: 1 juin 2008, Date de fin: 30 sept. 2011,

Description NeoMark will record and combine heterogeneous clinical, laboratory, molecular and imaging data to develop a data integration environment facilitating multiscale and multilevel modelling.Objectives of the projectThe clinical problemThe continuous improvement in treatment protocols for neoplastic diseases has substantially incre ...
Voir le projet

 10

 TERMINÉ 

TERABIT MAGNETIC STORAGE TECHNOLOGIES (TERAMAGSTOR)

Date du début: 1 mai 2008, Date de fin: 31 juil. 2011,

Description future perpendicular magnetic storage media with areal density larger than 1 bit/in2TERAMAGSTOR is an EU funded FP7 STREP project which aims to produce the next generation of perpendicular magnetic storage media with an areal density greater than 1Tbit/in2. Leading research groups and industrial partners from around Europe hav ...
Voir le projet

 9

 TERMINÉ 

Open Public Extended Network metering (OPEN meter)

Date du début: 1 janv. 2009, Date de fin: 30 juin 2011,

New smart multi-metering or multi-functional Advanced Metering Infrastructure (AMI) is capable of creating value for energy consumers, network operators, metering operators and retailers. AMI will provide better services for customers in various ways: not only by more accurate metering and billing, but also by easing the supplier switching process and also by facilitating demand response to price ...
Voir le projet

 20

 TERMINÉ 
As miniaturization of the CMOS technology advances designers will have to deal with increased variability and changing performance of devices. Intrinsic variability of devices which begins to be visible in 65nm devices already will become much more significant in smaller technologies. Soon it will not be possible to design systems using current methods and techniques.Scaling beyond the 32 nm techn ...
Voir le projet

 6

 TERMINÉ 
The primary aim of the ARAGORN project is to research and develop a Cognitive Resource Manager (CRM) that aims to ensure that efficient use is made of both node-local and shared resources in a collaborative wireless system. These include, for example, local energy consumption and shared use of available bandwidth. In order to achieve this, ARAGORN will develop a range of standardised interfaces, u ...
Voir le projet

 8

 TERMINÉ 
The SHARE project aims to facilitate open source software code sharing and utilisation within the embedded system domain, creating a nurturing environment for applications and solutions to be developed on OSS middleware, and paving the way for new business models and services. The focus of the project will be on:- Middleware for mission critical applications- Middleware for nomadic networks applic ...
Voir le projet

 10

 TERMINÉ 

Open Media Platform (OMP)

Date du début: 1 janv. 2008, Date de fin: 31 déc. 2009,

Supporting the next generation of content-rich networked services on mobile devices is presenting major technical challenges for Europe's semiconductor and Consumer Electronics industries. Unlike the standard PC architecture, these devices have huge variation in multimedia capability and must operate under widely varying network conditions. Software complexity growth on these devices is now outpac ...
Voir le projet

 8