Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
Antimicrobial resistance (AMR) is a major global public health threat, and most troublesome is the rapid emergence and dissemination of multidrug resistant (MDR) Enterobacteriaceae, Acinetobacter species and Pseudomonas aeruginosa. There is an unmet medical need to prevent P. aeruginosa infection in critically ill patients and to develop new antibiotics for infections caused by Gram-negative bacte ...
Voir le projet

 44

 TERMINÉ 

Combatting Bacterial Resistance in Europe - Carbapenem Resistance (COMBACTE-CARE)

Date du début: 1 mars 2015, Date de fin: 28 févr. 2020,

Multi-drug resistant Gram-negative bacteria (MDR-GNB): the ultimate challenge!Antibiotic resistance is a global public health concern recently elevated to the top three threats identified by the WHO, and subject of numerous national and international government activities. Although focused strategies have beneficially influenced infection rates due to methicillin resistant Staphylococcus aureus (M ...
Voir le projet

 23

 TERMINÉ 
Blood-based biomarkers such as Circulating Tumor Cells (CTCs), circulating free tumor DNA (cfDNA) and microRNAs (miRNAs) have the potential to improve the development of personalized medicines for cancer patients. This is of particular importance when biopsies of the primary tumor or metastases are not accessible (e.g. at early disease stages or in minimal residual disease) or possible and the ass ...
Voir le projet

 34

 TERMINÉ 

Combatting Bacterial Resistance in Europe (COMBACTE-NET)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2019,

The emergence of Antibiotic-resistant bacteria (ARB) is a global problem, having recently been elevated to the top three threats identified by the World Health Organisation (WHO), and subject of numerous national and international government activities, including the Trans-Atlantic Task Force on Antimicrobial Resistance established by the US and EU presidencies. The estimated costs of ARB are aro ...
Voir le projet

 38

 TERMINÉ 
Background A total of 58.9% of EU glass melting capacity is based on either end-fired or cross-fired regenerative glass furnaces. These recover waste heat in flue gas by preheating the combustion air with regenerators. This is currently the most economically-viable choice for the container and flat glass glass manufacturing segments in which large-scale f ...
Voir le projet

 2

 TERMINÉ 
Background The Asian predatory wasp (Vespa velutina) is an invasive alien species that poses a serious threat to European biodiversity due to its alimentary habits. The wasp feeds larvae on animal proteins from native wasps, bees, other hymenoptera, diptera and lepidoptera. The species is being controlled in France through the use of baited traps and the ...
Voir le projet

 4

 TERMINÉ 

Genetics-driven targeted therapy of Hairy Cell Leukemia (Hairy Cell Leukemia)

Date du début: 1 avr. 2014, Date de fin: 31 mars 2019,

Hairy Cell Leukemia (HCL), a chronic B-cell neoplasm, is initially sensitive to chemotherapy with purine analogs, but ~40% of patients eventually relapses and becomes less responsive to these drugs. Furthermore, purine analogs may cause myelotoxicity, immune-suppression and severe opportunistic infections. Therefore, molecularly-targeted less toxic drugs are highly desirable in HCL. However, its ...
Voir le projet

 1

 TERMINÉ 
Coronary artery disease (CAD) is the leading cause of death in high-income countries. Invasive coronary angiography (ICA) is the reference standard for the diagnosis of CAD and allows immediate therapy. However, only 40% of patients undergoing ICA actually have obstructive CAD and ICA has relatively rare but considerable risks. Coronary computed tomography (CT) is the most accurate diagnostic test ...
Voir le projet

 38

 TERMINÉ 
Transition to adulthood is the period of onset of most of the serious mental disorders that disable or kill in adult life. Current service configuration of distinct Child and Adolescent Mental Health (CAMHS) and Adult Mental Health (AMHS) Services is considered the weakest link where the care pathway should be most robust. Transition-related discontinuity of care is a major socioeconomic and socie ...
Voir le projet

 14

 TERMINÉ 

Ensuring the Integrity of the European food chain (FOODINTEGRITY)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2018,

Food Integrity “the state of being whole, entire, or undiminished or in perfect condition”.Providing assurance to consumers and other stakeholders about the safety, authenticity and quality of European food (integrity) is of prime importance in adding value to the European Agri-food economy. The integrity of European foods is under constant threat from fraudulently labelled imitations that try to ...
Voir le projet

 64

 TERMINÉ 
Emerging evidence indicates that the gut microbiome contributes to our ability to extract energy from the diet and influences development and function of the immune, endocrine and nervous systems, which regulate energy balance and behaviour. This has led to hypothesize that developing microbiome-based dietary interventions can be cost-effective measures to prevent diet-related and behavioural diso ...
Voir le projet

 30

 TERMINÉ 
"The Strategic Research Agenda of the EU Sustainable Nuclear Energy Technical platform requires new large infrastructures for its successful deployment. MYRRHA has been identified as a long term supporting research facility for all ESNII systems and as such put in the high-priority list of ESFRI. The goal of MAXSIMA is to contribute to the ""safety in MYRRHA"" assessment.MAXSIMA has five technical ...
Voir le projet

 14

 TERMINÉ 
Fortissimo 2 will drive the uptake of advanced modelling, simulation and data analytics by European engineering and manufacturing SMEs and mid-caps. Such an uptake will deliver improved design processes, better products and services, and improved competitiveness. For the European Union as a whole this means improved employment opportunities and economic growth.The importance of advanced ICT to the ...
Voir le projet

 38

 TERMINÉ 

“Jóvenes de Almendralejo en Europa”

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2018,

The Consortium that we present today has been promoted at a local level by Almendralejo Town Hall together with the following Vocational Schools of this town: IES Carolina Coronado, IES Santiago Apostol and IES Arroyo Harnina. This proposal is the result of our concern for the actual situtation of our youngsters, either students or recent graduates, who face a difficult working situation increase ...
Voir le projet

 31

 TERMINÉ 

Smart Water Supply System (LIFE SWSS)

Date du début: 1 sept. 2015, Date de fin: 31 août 2018,

Background Water Supply Systems (WSS) are large-scale systems that collect, store, treat and transport water over wide geographical areas to consumers. Safe and efficient operation is crucial for these systems. WSS can have major environmental impacts due to the substantial amounts of energy consumed, as well as through the emission of greenhouse gases (G ...
Voir le projet

 8

 TERMINÉ 
Our school aims to establish a solid cooperation with European Vocational organizations ,will raise the image of our School,Improve communication among staff and between students and staff Promote staff competence,Improve students' learning,help students to understand and come closer to a European multicultural, internationalized environment and Improve students' employability through practical tr ...
Voir le projet

 5

 TERMINÉ 

Next Station: Improving Professional Skills in Galicia

Date du début: 4 juil. 2016, Date de fin: 3 juil. 2018,

General Management of Education, Vocational Training and Educational Innovation in Council of Culture and Education in Galicia is in Santiago de Compostela and manages 205 schools with Vocational Training and 1204 schools in Galicia.Educational adviser and international program coordinator promotes and coordinates european projects with 19 Vocational Training schools with their international coor ...
Voir le projet

 38

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2016, Date de fin: 31 mai 2018,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2016, Date de fin: 31 mai 2018,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 

Az olasz gasztronómia eredményeinek átvétele a duális szakképzésben

Date du début: 1 juin 2016, Date de fin: 31 mai 2018,

The Chamber of Commerce and Industry of Jász-Nagykun-Szolnok Country has made the project can provide the professional training and realisation of future aims.The project provides an opportunity for 20 Hungarian citizens, aged over 18 old, to participate in and internship abroad for 112 days (16 weeks), in hotels and catering facilities in the regions of Northern Italy (Friuli-Venezia-Giulia and V ...
Voir le projet

 2

 TERMINÉ 

Accueil Relation COMmerce Vente de l'Académie de Lyon

Date du début: 1 juin 2016, Date de fin: 31 mai 2018,

The consortium presented here has for objective to contribute to the updating and upgrading of the professional skills of all the participants. The main theme chosen for this project is to “deal with customers’ and clients’ greeting procedures”. The targeted public is students in Bac Pro in sales professions (Retail studies, Reception, Sales and trade). We want to give them an International experi ...
Voir le projet

 33

 TERMINÉ 

SOX: Short distance neutrino Oscillations with BoreXino (SOX)

Date du début: 1 juin 2013, Date de fin: 31 mai 2018,

"We propose to realize an experiment sensitive to a large fraction of the parameter space for short distance neutrino flavor oscillations into sterile components.The experiment aims at the clear and unambiguous discovery, or at the definitive disproof, of the so called neutrino anomalies, a set of circumstantial evidences of electron neutrino disappearance at short distance from the source observe ...
Voir le projet

 1

 TERMINÉ 

The macroeconomic effects of microeconomic inaction (MEF)

Date du début: 1 juin 2013, Date de fin: 31 mai 2018,

"A large part of macroeconomics embeds some form of inertial behavior by firms and/or house- holds. Whether it is in price or wage setting, real or financial investment choices, saving or consumption decisions, some element of stickiness leading to inaction ranges in individuals’ choices (in prices, consumption, investment) is often included to reconcile the model with observed individual data. Ye ...
Voir le projet

 1

 TERMINÉ 
Background Europe is among the world’s largest producers and consumers of pulp, paper, and cardboard. More specifically, the Lucca paper district is the largest European industrial cluster with an overall production of 1.2 million tonnes of tissue paper and 950 000 tonnes of paper for packaging (75% and 40% of the total Italian production respectively). ...
Voir le projet

 4

 TERMINÉ 

Improving Judgments Project (KJ-IJP)

Date du début: 1 mars 2014, Date de fin: 28 févr. 2018,

"Decision-makers are often required to make subjective judgments about situations under uncertainty. For example, organizations operating across several countries need to predict currency exchange rates, and need experts to make these predictions using a combination of objective data and subjective judgments. This research program that we call as ‘Improving Judgments Project’ will focus on underst ...
Voir le projet

 1

 TERMINÉ 
The DROPSA consortium will create new knowledge and understanding of the damage and losses of fruit crops resulting from pests and pathogens, with a specific focus on the new and emerging threats due to Drosophila suzukii and quarantine pathogens Pseudomonas syringae, Xanthomonas fragariae and X. arboricola. The project will deliver a cost effective approach that can be widely implemented by the E ...
Voir le projet

 27

 TERMINÉ 
Background The manufacturing of carpet is linear: virgin raw materials are used to make yarn, backing and other materials, which are then used to manufacture carpets. This process is not sustainable in the long run: it consumes large quantities of primary resources and adds considerably to waste sent to landfill. Europe discards annually approximately 1 6 ...
Voir le projet

 3

 TERMINÉ 

Aquaponics New Novelty In Education

Date du début: 1 sept. 2016, Date de fin: 31 déc. 2017,

ANNIE - Aquaponics New Novelties In Education- feeding tomorrow's cities is a project in which all participating countries will start to create a network of educational institutions, rural and urban companies/farmers and regional governments and local authorities and to share good practices. The global trend of urbanisation brings new challenges on food production and processing, and the needs o ...
Voir le projet

 13

 TERMINÉ 

JAEN+: Formación Profesional con Plus en Europa

Date du début: 1 oct. 2016, Date de fin: 31 déc. 2017,

JAÉN+: Formación Profesional con Plus en Europa is an initiative by Diputación de Jaén, that gathers 7 vocational training centres from the province of Jaén. The project aims to improve the training of 60 people facilitating their labour integration. Through an analysis of the situation of the labour market in Jaén, and the analysis of the educational system, 6 are the sectors identified as necess ...
Voir le projet

 34

 TERMINÉ 

Synergistic Fouling Control Technologies (SEAFRONT)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2017,

Marine biofouling, the unwanted colonization of marine organisms on surfaces immersed in seawater has a huge economic and environmental impact in terms of maintenance requirements for marine structures, increased vessel fuel consumption, operating costs, greenhouse gas emissions and spread of non-indigenous species. The SEAFRONT project will aim to significantly advance the control of biofouling a ...
Voir le projet

 19

 TERMINÉ 
"The DEVASSES project aims at taking a step forward in the design and deployment of large-scale, dynamic service-based software systems by supporting the transfer of knowledge on novel state of the art methods, techniques, and tools for both design time and run time verification and validation. The goal is to reinforce existing partners’ cooperation through a coordinated program of exchange of res ...
Voir le projet

 2

 TERMINÉ 
FABRIC addresses directly the technological feasibility, economic viability and socio-environmental of dynamic on-road charging of electric vehicles.FABRIC responds to the need to assess the potential and feasibility of a more extensive integration of electric vehicles in the mobility and transportation system, focusing primarily on dynamic wireless charging which would allow practically all of th ...
Voir le projet

 27

 TERMINÉ 

Correctness by Construction (CORCON)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2017,

"As software becomes ever more ubiquitous in our lives, the need to ensure it runs without error becomes ever more important. Restarting a phone is a simple, if inconvenient task; restarting an aeroplane in mid-flight is not an option!Correct by construction programming offers a revolutionary approach to program verification where programs can contain not just computations as is normal, but also ...
Voir le projet

 9

 TERMINÉ 

European Medical Information Framework (EMIF)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2017,

In response to the need to tackle increasingly complex medical research questions, a growing amount of human health data is being collected, either in routine Electronic Healthcare Record (EHR) databases, through research-driven cohort studies, in biobanks or related efforts. However, data sources are typically fragmented and contain information gaps which prevent their full exploitation. EMIF aim ...
Voir le projet

 64

 TERMINÉ 

Phase contrast X-ray imaging for medicine (PhaseX)

Date du début: 1 nov. 2012, Date de fin: 31 oct. 2017,

The goal of this grant is to introduce grating-based phase contrast enhanced X-ray imaging as a novel diagnostic tool in human medicine. We will first gain fundamental knowledge to master high-energy grating-based phase contrast imaging and develop novel radiological equipment at the demonstrator/prototype level to perform phase contrast enhanced investigation in human patients in-vivo. In a secon ...
Voir le projet

 2

 TERMINÉ 
"The goal of WATBIO is to use the power of next generation sequencing to develop an accelerated route for producing new germplasm with enhanced drought tolerance whilst maintaining biomass productivity and quality in water scarce, marginal environments unsuitable for food crops.This will be achieved for three non-food crops (Populus, Miscanthus and Arundo), suitable for growth on water scarce, mar ...
Voir le projet

 23

 TERMINÉ 

Support Tourism And Reduction Strategy (+20) : STARS (+20) (LIFE STARS (+20))

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2017,

Background Based on Eurostat and World Trade Organisation (WTO) statistics, the tourism sector in the EU accounts for 9.7 million jobs (12% of the EU workforce) and more than 10% of the EU’s total GPD. It supports around 1.8 million enterprises, most of which are SMEs and micro-enterprises. The EU is the world’s no.1 tourist destination, with more th ...
Voir le projet

 4

 TERMINÉ 

Targeted disease prophylaxis in European fish farming (TargetFish)

Date du début: 1 oct. 2012, Date de fin: 30 sept. 2017,

European aquaculture production provides direct employment to 65.000 people with a turnover of 3 billion €. However, the lack of authorised veterinary medicinal products and the consequent disease outbreaks in farmed fish species costs the sector 20% of the production value. The most appropriate method for disease control, both on economical and ethical grounds, is disease prevention by vaccinatio ...
Voir le projet

 32

 TERMINÉ 
"Cell polarity and directed growth (tropism) are fundamental biological processes. Most fungi are dependent on these processes because they grow as polarised filaments called hyphae, whose growth and developmentare governed by physical and chemical cues from the environment. Such cues include surface-contact, light, nutrients, mating partners, host organisms, or ‘self’ hyphae from within the fung ...
Voir le projet

 13

 TERMINÉ 
MARS-EV aims to overcome the ageing phenomenon in Li-ion cells by focusing on the development of high-energy electrode materials (250 Wh/kg at cell level) via sustainable scaled-up synthesis and safe electrolyte systems with improved cycle life (> 3000 cycles at 100%DOD). Through industrial prototype cell assembly and testing coupled with modelling MARS-EV will improve the understanding of the age ...
Voir le projet

 17