Rechercher des projets européens

19 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
Description (EN): The AlpGovs’ main objective is to support effective and efficient EUSALP implementation in a systematic transnational approach through designing and testing appropriate governance structures and mechanisms mainly on the level of Action Groups (AGs), at the same time to create synergies with the other EUSALP implementing bodies General Assembly and Executive Board a ...
Voir le projet

 13

 TERMINÉ 

Quantifying projected impacts under 2°C warming (IMPACT2C)

Date du début: 1 oct. 2011, Date de fin: 30 sept. 2015,

Political discussions on the European goal to limit global warming to 2°C demands that discussions are informed by the best available science on projected impacts and possible benefits. IMPACT2C enhances knowledge, quantifies climate change impacts, and adopts a clear and logical structure, with climate and impacts modelling, vulnerabilities, risks and economic costs, as well as potential respons ...
Voir le projet

 29

 TERMINÉ 
Within the scope of Pr. 3 of ASP 2007-13 major innovation capacities were focused on knowledge development in Natural Hazard/Risk Management (NHRM) & Risk Governance (RG) (eg. innovation in hazard mapping/protection technology) in various funded projects (& other ETC/national-R&D initiatives). START_it_up will capitalise this knowledge pool by enhancing it into a transnational common state-of-the- ...
Voir le projet

 8

 TERMINÉ 
The ESPONTrain Project is aiming at making ESPON2013 knowledge operational in a coordinated and transnational way for practical use at regional and local level, and translating ESPON Europe-wide information and findings to the regional/local level. Specifically, the project is aiming at: •Stimulating a transnational educational and training ESPON activity facilitated by both an e-learning procedur ...
Voir le projet

 10

 TERMINÉ 

Transalpine Transport Architects (TRANSITECTS)

Date du début: 30 juin 2009, Date de fin: 29 juin 2012,

In TRANSITECTS public institutions design common transnational intermodal solutions for freight transport in the Alpine Space. In the partnership different interests (economy, environment and transport) are integrated which is of crucial importance for a sustainable solution. Main aim of the project is to make the rail network more attractive and hence to foster its accessibility and functionality ...
Voir le projet

 16

 TERMINÉ 
Beyond its traditional functions, the Mediterranean forest areas are concerned with new uses, notably in periurban or protected contexts, such as biodiversity, soil and water conservation, carbon storage, leisure… This multitude of functions requires the implementation of new strategies of common actions and participative policies, which imply the different concerned stakeholders. The aim of QUALI ...
Voir le projet

 8

 TERMINÉ 

Adaptation to flood risk in the LABE-ELbe river basin (LABEL)

Date du début: 31 août 2008, Date de fin: 27 janv. 2012,

...of the disastrous Elbe flood 2002 and complimented the fruitful cooperation of the projects ELLA and LABEL in the Elbe catchment. According to Jan Mücke, Parliamentary State Secretary at the Federal Ministry for Transport, Building and Urban Development, the continuing cooperation to improve flood prevention is also in future a priority of the spatial development policy.
Voir le projet

 20

 TERMINÉ 

Sustainable and Equipped Productive Areas (SEPA)

Date du début: 31 janv. 2009, Date de fin: 30 juil. 2011,

SEPA promotes the concept of sustainable production area defined as a Community of manufacturing firms and services that, within a territory and through cooperation, plan to improve their environmental, economic and social performances, acquiring specific organizational tools, management and infrastructure. Its most innovative aspect is to move the focus from the activity of individual public inst ...
Voir le projet

 18

 TERMINÉ 

East-West Window (EastWest Window)

Date du début: 30 avr. 2007, Date de fin: 30 oct. 2008,

The main aim of the East West Window project was to accelerate the Baltic Sea Region (BSR) development through better connecting of the existing potentials within the Region. Achievements: * Assessment of unused innovation potential in NW Russia and recommendations ...
Voir le projet

 10

 TERMINÉ 
The SEMSON: South Eastern Mediterranean Spatial Planning Observatory Network project originates in the successfully evolving INTERREG-IIIB/CADSES project ESTIA-SPOSE (CADSES area) and aims at the promotion of spatial development policy integration in SE Mediterranean area. The Archi-Med macro-region, consisting of 4 EU members and several third peripheral countries, is currently a scattered area d ...
Voir le projet

 5

 TERMINÉ 

Regional Cooperation in Waste Management (RECO)

Date du début: 12 janv. 2005, Date de fin: 11 janv. 2008,

RECO is a waste management and spatial planning project in cooperation between partners from Estonia, Latvia, Lithuania, Germany, Poland, Finland, Sweden, Russia, Ukraine and Belarus. Its Central Objective is to support the development of efficient Institutions for management of municipal waste in the BSR in order to minimize negative environmental effects, lower life cycle costs for waste managem ...
Voir le projet

 58

 TERMINÉ 

Baltic Energy Efficiency Network for the Building Stock (BEEN)

Date du début: 20 juin 2005, Date de fin: 30 déc. 2007,

Buildings account for more than 40% of the overall energy consumption in the EU, of which two-thirds are consumed in residential buildings. Thereby, the standard of the buildings varies greatly and low thermal quality primarily occurs in the prefabricated multi-storey housing stock in the Central and Eastern European member states. This fact also implies huge potentials for energy savings and the ...
Voir le projet

 26

 TERMINÉ 

LAnners NETwork for CENtral and South East Europe (PLANET CENSE)

Date du début: 31 oct. 2003, Date de fin: 17 févr. 2007,

PLANET CENSE is a network of national spatial planning institutions and experts established as a consequence of the VISION PLANET project. It aims at pursuing and developing further the policy options laid down in the VISION PLANET project documents. The network will foster spatial integration and a cross-sector dialogue with: - The European Spatial Planning Gateway (ESP GATEWAY): an expert dialog ...
Voir le projet

 25

 TERMINÉ 

Territorial dimension of the Lisbon/Gothenburg Process (Lisbon strategy)

Date du début: 22 juil. 2004, Date de fin: 12 févr. 2007,

Studying the territorial dimension of the Lisbon/Gothenburg Agenda comprises a multitude of very complex and broad processes and contexts. It will neither be feasible to conduct an analysis of the impact of the Lisbon/Gothenburg strategy nor to embrace all factors of competitiveness.The main scope of the study is to develop a number of basic analytical elements that can introduce territorial cohes ...
Voir le projet

 6

 TERMINÉ 

SUSTRAIN Implement Corridor (SIC!)

Date du début: 31 déc. 2002, Date de fin: 30 juil. 2006,

With the 2004 enlargement the EU area has increased by about 75 million people. A GDP of only 23-68% of the EU average and long transport routes do not only increase the imbalance between Europe's economic core area - London, Paris, Milan, Munich (Blue Banana) and Hamburg and periphery, the regional development and growth opportunities of the new EU countries are also on the decline. However, the ...
Voir le projet

 18

 TERMINÉ 

Integrated Coastal Zone Development in the Baltic Sea Region / BALTCOAST (BALTCOAST )

Date du début: 30 juin 2002, Date de fin: 29 sept. 2005,

The main objective was to solve concrete local ICZD problems and to generalise experience acquired in this process into pan-Baltic actions such as changes of national legislation, elaboration of best practices and recommendations. The goal of the project was to accompany the implementation process by different international experts in the field of ICZD and to develop a common strategy based on the ...
Voir le projet

 25

 TERMINÉ 

Networking Logistics Centres in the Baltic Sea Region (NeLoC )

Date du début: 17 déc. 2001, Date de fin: 16 févr. 2004,

The NeLoC project provided a networking forum for existing and planned logistics centres in the Baltic Sea Region and it has enabled the exchange of experiences in planning and operating logistics centres.The project promoted the role of logistics centres in regional development as well as national and international logistics chains with emphasis laid on intermodal solutions. Further, the project ...
Voir le projet

 24

 TERMINÉ 

flood management measures by transnational spatial planning (ELLA – ELBE – LABE)

Date du début: 30 juin 2003, Date de fin: 30 juil. 2003,

The ELLA project is the transnational co-operation of nearly all regional spatial planning authorities in the Elbe basin. This partnership between national and regional partners that are responsible for spatial planning, water management and agriculture, realises almost full spatial coverage of the catchment area of the Elbe and even neighbouring regions. Flood prevention and common management app ...
Voir le projet

 23

 TERMINÉ 
The need for knowledge exchange in all relevant areasof urban policy has been identified for quite some timeby Member States, European municipalities and theEuropean Commission.The EUKN is to realize a sustainable and effective knowledgenetwork between European cities, urban researchers andknowledge institutes in order to support policy-makers indeveloping an effective urban policy.The objective o ...
Voir le projet

 14