Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
Background Freshwater habitats are among the most threatened habitat types globally. In the 2007-2012 conservation status assessment of the EU Habitats Directive (Article 17), none of the freshwater, coastal, and groundwater dependent wetland habitats in Europe fully met favourable conservation status, and most are in unfavourable conservation status. Alm ...
Voir le projet

 30

 TERMINÉ 
Background Thanks to conservation efforts started in the 1980s, the Hungarian population of the eastern imperial eagle has come back from the brink of extinction, reaching 160 pairs by 2014. The Pannonian biogeographical region (which includes all of Hungary and parts of Slovakia, Romania, Czech Republic, Croatia, Serbia and Ukraine) now holds some 220 pa ...
Voir le projet

 12

 TERMINÉ 
The GeoERA proposal is put forward by the national and regional Geological Survey Organisations (GSO) of Europe. Its overall goal is to integrate the GSO’s information and knowledge on subsurface energy, water and raw material resources, to support sustainable use of the subsurface in addressing Europe’s grand challenges. The GeoERA consortium will organise and co-fund together with the EC a joint ...
Voir le projet

 45

 TERMINÉ 

European Human Biomonitoring Initiative (HBM4EU)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2021,

The overarching goal of the European Human Biomonitoring Initiative (HBM4EU) is to generate knowledge to inform the safe management of chemicals and so protect human health. We will use human biomonitoring to understand human exposure to chemicals and resulting health impacts and will communicate with policy makers to ensure that our results are exploited in the design of new chemicals policies an ...
Voir le projet

 43

 TERMINÉ 

ERA-Net Cofund on Sustainable Food production and consumption (SUSFOOD2) (SUSFOOD2)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2021,

The aim of SUSFOOD2 is to foster research and innovation in the field of sustainable food systems through enhanced cooperation and coordination between EU member and associated states. It will thereby contribute to the overall EU objective of building the European Research Area as well as a newly emerging Food Research Area. Major challenges will influence future food chains asking for innovative ...
Voir le projet

 26

 TERMINÉ 

Tackling Water Challenges in the International Context (IC4WATER)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2021,

The Joint Programming Initiative Water Challenges for a Changing World, the Water JPI, is an intergovernmental initiative which strives to achieve sustainable water systems for a sustainable economy in Europe and abroad.IC4WATER’s objectives include supporting agencies in stepping up international cooperation: through the sharing of best practices, networking, closer coordination of existing activ ...
Voir le projet

 19

 TERMINÉ 
Background The project focuses on areas that are pivotal for the conservation of the two sea turtle species occurring in the EU and listed as priority species in Annex II of the Habitats Directive, the loggerhead turtle (Caretta caretta) and the green turtle (Chelonia mydas). In the EU, the loggerhead turtle has major nesting sites in Greece and Cyprus, a ...
Voir le projet

 9

 TERMINÉ 
The aim of the ERA-GAS Cofund is to strengthen the transnational coordination of research programmes and provide added value to research and innovation on greenhouse gas (GHG) mitigation in the European Research Area. ERA-GAS will organise a single joint transnational call for proposals with cofunding from the European Commission (EC). In addition, ERA-GAS will undertake additional joint activit ...
Voir le projet

 19

 TERMINÉ 

European Research Area on Sustainable Animal Production Systems (SusAn)

Date du début: 1 mars 2016, Date de fin: 28 févr. 2021,

This proposal seeks funding under the Horizon 2020 Work Programme 2014-2015 to establish an ERA-NET for joint European research coordination on Sustainable Animal Production (SusAn). The scope for this ERA-NET has been developed under the SCAR Collaborative Working Group on Sustainable Animal Production (CWG-SAP). Funding organisations from 22 European countries initially seek to support one co-fu ...
Voir le projet

 37

 TERMINÉ 

The rescue of endemic priority plant species Minuartia smejkalii (Life for Minuartia)

Date du début: 7 juil. 2016, Date de fin: 31 déc. 2020,

Background Minuartia smejkalii is a postglacial flowering plant that is endemic to the Czech Republic. A type of sandwort, M. smejkalii is nowadays only found in two Natura 2000 network sites in the country. However, its population has undergone a 65% decline in the last five years and in some parts of the project sites it is already extinct. The main cau ...
Voir le projet

 3

 TERMINÉ 
Background In Crete there is a lack of prosecution of wildlife crime and measures for remediation of damage to biodiversity in Natura 2000 sites. The EU, however, introduced the Environmental Liability Directive in 2014 to remediate biodiversity damage and establish wildlife crime as a separate area of prosecution. Local communities have a role to play in ...
Voir le projet

 5

 TERMINÉ 
European forests are expected to provide a broad range of ecosystem services (ES). This capacity is however threatened by the uncertainties of climate change, the complex dynamics of evolving global markets and the pressures for increased use of bioenergy. Such challenges cannot be effectively addressed with an uncritical regional or national commitment to traditional forest management models (FMM ...
Voir le projet

 21

 TERMINÉ 
Background The Cyprus cedar (Cedrus brevifolia) is an evergreen long-lived coniferous tree that is endemic to Cyprus. Its natural distribution is very limited: it occurs only in a small area at the peak of Tripylos mountain, in the Paphos forest, in fragmented, scattered stands, over six separate geographical areas, mostly within the Koilada Kedron-Kampos ...
Voir le projet

 3

 TERMINÉ 

Building LIFE capacities in Lithuania (LIFE LT)

Date du début: 1 juil. 2016, Date de fin: 30 juin 2020,

Background The LIFE programme introduced action grants for capacity-building projects for the 2014-2017 funding period. These are projects designed to build Member States' capacity to participate more effectively in the LIFE Programme. Specifically, these projects propose interventions to develop the capacity to submit successful applications for funding ...
Voir le projet

 2

 TERMINÉ 

Climate Proofing Urban Municipalities (LIFE UrbanProof)

Date du début: 1 oct. 2016, Date de fin: 31 mai 2020,

Background Cities and towns, with their high population densities and dependence on collective infrastructure, are extremely vulnerable to the impacts of climate change. The concentration of people in urban centres restricts vegetation and green spaces, thus increasing risks related to heat and floods. The impacts of climate change on the urban environme ...
Voir le projet

 8

 TERMINÉ 

SUstainable and Resilient agriculture for food and non-food systems (FACCE SURPLUS)

Date du début: 1 mars 2015, Date de fin: 29 févr. 2020,

The objective of FACCE SURPLUS is to strengthen the European Research Area in support of different integrated food and non-food biomass production and transformation systems, especially by organising, implementing and cofunding with the EU a joint call for transnational research projects on the topic of sustainable and resilient agriculture. As this topic falls within the scope of the Strategic Re ...
Voir le projet

 24

 TERMINÉ 

Water Works 2014-2019 in Support of the Water JPI (WaterWorks2014)

Date du début: 1 févr. 2015, Date de fin: 31 janv. 2020,

Water is a critical resource for the European society. Beside its main life function, freshwater also provides many other functions essential to our economy. Water challenges cannot be successfully tackled through the isolated effort of individual national research and innovation programmes. This ERA-NET cofund proposal is submitted in the name of the Joint Programming Initiative “Water Challenges ...
Voir le projet

 25

 TERMINÉ 
The loss of biodiversity and degradation of ecosystems jeopardize the sustainable provision of ecosystem services and are major scientific and societal challenges. Addressing this challenge and providing scientific support to stakeholders and policy makers requires a coherent interdisciplinary research framework, with coordinated strategies and programmes at the national, regional and internationa ...
Voir le projet

 31

 TERMINÉ 

Living River Lahn - one river, many interests (Living River Lahn)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2019,

...tential of the Lahn is rated as ‘unsatisfactory’ or ‘bad’, according to WFD criteria. Furthermore, the ‘National report on the status of floodplains 2009’ of the Federal Ministry for the Environment, Nature Conservation and Nuclear Safety reports a ‘significantly modified’ to ‘heavily modified’ status of floodplains for the major part of the Lahn’s watercourse. The lower par ...
Voir le projet

 5

 TERMINÉ 

Preservation of species-rich Nardus grasslands in pSCI Beskydy (LIFE Beskydy)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2019,

Background The project area includes several habitats types that are listed in Annex I of the Habitats Directive. In particular, habitat type 6230*: species-rich Nardus grasslands on silicious substrates in mountain areas (and sub-mountain areas in continental Europe). This is present in the Natura 2000 site, Beskydy, covering an area of 647.6 ha – the ...
Voir le projet

 2

 TERMINÉ 

CYprus Capacity BuiLding for lifE (CYCLamEn)

Date du début: 15 déc. 2015, Date de fin: 14 déc. 2019,

Background The LIFE programme introduced action grants for capacity-building projects for the 2014-2017 funding period. These are projects designed to build Member States' capacity to participate more effectively in the LIFE Programme. Specifically, these projects propose interventions to develop the capacity to submit successful applications for funding ...
Voir le projet

 1

 TERMINÉ 
The Concerted Action will support the implementation of the renewable energy directive 2009/28/EC. As with the first and second phase, the objectives of CA-RES3 are directly linked to the transposition and implementation of the RES Directive. The third phase of the CA-RES will also provide further opportunities to explore possibilities for common approaches in specific areas of implementation of t ...
Voir le projet

 29

 TERMINÉ 

Boosting Regulatory Advantages Vis à vis Emas Registration (LIFE B.R.A.V.E.R.)

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2019,

Background EMAS (Eco-Management and Audit Scheme) is an EU-level management tool designed to help registered organisations enhance their environmental performance and credibility. The EMAS scheme operates through incentives that reward organisations that make commitments to sustainability. The European Commission has initiated a process to improve and sim ...
Voir le projet

 7

 TERMINÉ 
The direct dependence of humans on ecosystem services is by far strongest in developing regions where poverty restricts access to resources. This dependency also makes people in developing countries more sensitive to climate change than their developed counterparts. Increasing human populations deteriorates natural habitat, biodiversity and ecosystems services which spiral into poverty and low hum ...
Voir le projet

 13

 TERMINÉ 
Background Mountains and forests are prominent features of the Greek landscape. Forest area covers half of the surface area of the country, with high forests accounting for 30.2% and wooded land another 20.5%. High forests have shown some increase since 1990 while wooded land has decreased. Around 77% of forest areas are publicly owned, with the church, ...
Voir le projet

 2

 TERMINÉ 
Description (EN): The AlpGovs’ main objective is to support effective and efficient EUSALP implementation in a systematic transnational approach through designing and testing appropriate governance structures and mechanisms mainly on the level of Action Groups (AGs), at the same time to create synergies with the other EUSALP implementing bodies General Assembly and Executive Board a ...
Voir le projet

 13

 TERMINÉ 

EuroMix

Date du début: 15 mai 2015, Date de fin: 14 mai 2019,

Euromix aim to develop an experimentally verified, tiered strategy for the risk assessment of mixtures of multiple chemicals derived from multiple sources across different life stages. The project takes account of the gender dimension and balances the risk of chemicals present in foods against the benefits of those foods.Important concepts for this new strategy are prioritisation criteria for chem ...
Voir le projet

 26

 TERMINÉ 
Background The LIFE programme introduced action grants for capacity-building projects for the 2014-2017 funding period. These are projects designed to build Member States' capacity to participate more effectively in the LIFE Programme. Specifically, these projects propose interventions to develop the capacity to submit successful applications for funding ...
Voir le projet

 2

 TERMINÉ 

Increasing Malta’s participation in LIFE (Increase LIFE !)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2019,

Background The LIFE programme introduced action grants for capacity-building projects for the 2014-2017 funding period. These are projects designed to build Member States' capacity to participate more effectively in the LIFE Programme. Specifically, these projects propose interventions to develop the capacity to submit successful applications for funding ...
Voir le projet

 1

 TERMINÉ 

European Virus Archive goes global (EVAg)

Date du début: 1 avr. 2015, Date de fin: 31 mars 2019,

The overall objective will be to create and mobilise an International network of high calibre centres around a strong European group of institutes selected for their appropriate expertises, to collect, amplify, characterise, standardise, authenticate, distribute and track, mammalian and other exotic viruses. The network of EVAg laboratories including 25 institutions represents an extensive range o ...
Voir le projet

 27

 TERMINÉ 
Background The Carpathian Mountains are an important biodiversity reservoir for the brown bear (Ursos arctos) and wolf (Canis lupus). However, an assessment of environmental suitability for large carnivores (LCIE 2008) identified the isolation of the Apuseni Mountains (Western Carpathians) from the Southern Carpathians in Romania as a pressing connectivit ...
Voir le projet

 4

 TERMINÉ 
DIVERSIFOOD will evaluate and enrich the diversity of cultivated plants within diverse agroecosystems so as to increase their performance, resilience, quality and use through a multi-actor approach. By integrating existing experienced networks and using specific and relevant cases across Europe the project will strengthen “food culture” to improve economic viability of local chains resulting in a ...
Voir le projet

 21

 TERMINÉ 

Road-, Air- and Water-based Future Internet Experimentation (RAWFIE)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2018,

The purpose of the RAWFIE initiative is to create a federation of different network testbeds that will work together to make their resources available under a common framework. Specifically, it aims at delivering a unique, mixed experimentation environment across the space and technology dimensions. RAWFIE will integrate numerous testbeds for experimenting in vehicular (road), aerial and maritime ...
Voir le projet

 13

 TERMINÉ 

FOSTERING WATER-AGRICULTURE RESEARCH AND INNOVATION IN MALTA (FOWARIM)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2018,

FOWARIM (Fostering Water-Agriculture Research and Innovation in Malta) objective is to strengthen the research capacity of the Malta College of Arts, Science & Technology (MCAST)’s Water Research and Training Centre in 4 crucial themes related to the field of water use in agriculture: (a) Decreasing Water Demand, (b) Making Use of Alternative Sources of Water (c) Renewable Desalinization, On-Farm ...
Voir le projet

 7

 TERMINÉ 
Organic agriculture is considered to be one of the important development pathways for improving agriculture’s relation with the environment while at the same time ensuring food safety and future food security. This role is dependent on continuous research and innovation.CORE Organic Plus will continue, update and consolidate the series of transnational research calls which support a focused and co ...
Voir le projet

 24

 TERMINÉ 

Naval Fire Fighting Training & Education System

Date du début: 3 oct. 2016, Date de fin: 2 oct. 2018,

...ol, has been in operation since 2006 and adopts a conventional training workflow which will be radicalized through NAFTES. The Hellenic Navy (participating organization in NAFTES through the Hellenic Ministry of Defense, HMOD) intends to broaden the use and extend the scope of this unique training platform to commercial shipping companies from all around the globe. Therefore, NAFTES is considered ...
Voir le projet

 4

 TERMINÉ 

GPPbest - Best practices exchange and strategic tools for GPP (LIFE GPPbest)

Date du début: 1 oct. 2015, Date de fin: 30 juin 2018,

Background The most recent European Public Procurement directive emphasises the need for including environmental and social aspects in procurement procedures, while promoting a lifecycle costing approach. However, GPP is still not a common and established practice, underlining the evident gap between policy and its implementation. The lack of effective go ...
Voir le projet

 5

 TERMINÉ 

LIFE Capacity Building Slovenia (LIFE CB SI)

Date du début: 1 janv. 2016, Date de fin: 30 juin 2018,

...-based approach to tackling environmental challenges. Expected results: Through this capacity building project and its training activities, newly-recruited and existing personnel in the Slovenian Ministry of Environment and Spatial Planning will gain much-needed experience, knowledge and know-how in LIFE project planning, implementation and evaluation processes. This will consist of activities ...
Voir le projet

 1

 TERMINÉ 
Background Marine habitats are becoming more vulnerable, largely due to the impact of human activities. Some are listed in Annex I of the Habitats Directive and following a Natura 2000 marine biogeographic seminar in 2010, and various communications with the Commission, Malta is required to protect certain of these marine habitats. However, it lacks marin ...
Voir le projet

 5

 TERMINÉ 

Restoration of Wet Habitats in the Jerup Beach Ridge Plain (LIFE WETHAB)

Date du début: 1 juil. 2013, Date de fin: 30 juin 2018,

Background The Natura 2000 network site, Jerup Hede, RÃ¥bjerg og Tolshave Mose, hosts one of the largest dune and mire habitats in Denmark (4 024 ha). It comprises an old heath and bog area (mose is Danish for bog) with 25 different habitat types, seven of which have priority status. Furthermore, the Corncrake (Crex crex), an Annex I bird species with spe ...
Voir le projet

 3