Rechercher des projets européens

16 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Neutron Scattering and Muon Spectroscopy Integrated Initiative (NMI3-II)

Date du début: 1 févr. 2012, Date de fin: 31 janv. 2016,

"Advanced solutions to the challenges that confront our technology-based society – from energy and environment to health – are crucially dependent on advanced knowledge of material properties down to the atomic scale. Neutron and Muon spectroscopy offer unique analytical tools for material investigation. They are thus an indispensible building block of the European Research Area and directly addre ...
Voir le projet

 20

 TERMINÉ 

Supercritical Water Reactor - Fuel Qualification Test (SCWR-FQT)

Date du début: 1 janv. 2011, Date de fin: 31 déc. 2014,

"The SCWR-FQT project is related to the HPLWR Phase 2 European project, executed between 2006 and 2010, focused on the design of the European supercritical water cooled reactor, HPLWR. The scope of the SCWR-FQT Euratom-China parallel project is to design an experimental facility for qualification of fuel for the supercritical water-cooled reactor. The facility is destined to be operated in the LVR ...
Voir le projet

 10

 TERMINÉ 

MATerials TEsting and Rules (MATTER)

Date du début: 1 janv. 2011, Date de fin: 31 déc. 2014,

The 2010-2012 implementation plan of the European Sustainable NuclearIndustrial Initiative (ESNII), in the frame of the Sustainable Nuclear Energy Technology Platform (SNE TP), establishes a very tight time schedule for the start of construction of the European Gen IV prototypes; namely the construction of the LFR ETPP (European Technology Pilot Plant) Myrrha will start in 2014 and that of the SF ...
Voir le projet

 30

 TERMINÉ 
The EURATOM FP7 Collaborative Project “Fast / Instant Release of Safety Relevant Radionuclides from Spent Nuclear Fuel (CP FIRST-Nuclides)” is established with the overall objective to provide for improved understanding of the fast / instantly released radionuclides from disposed high burn-up UO2 spent nuclear fuel. This issue is given a high priority in the SRA of the IGD-TP. The outcome of the p ...
Voir le projet

 11

 TERMINÉ 
The essence of the project is to provide a special purpose structure for training and qualification of personnel for serving VVER technology as one of nuclear power options used in EU. Such approach should allow unifying existing VVER related training schemes according to IAEA standards and commonly accepted criteria recognized in EU. The structure is based on three general pillars: 1) Training sc ...
Voir le projet

 12

 TERMINÉ 
In view of the increasing age of the European NPPs and envisaged life time extensions up to an EOL of 80 years, there is a need for an improved understanding and prediction of RPV irradiation embrittlement effects connected with long term operation (LTO). Effects caused by high neutron fluences such as the possible formation of Late Blooming Phases and as yet unknown defects must be considered ade ...
Voir le projet

 17

 TERMINÉ 

Structural integrity for lifetime management – non-RPV components (STYLE)

Date du début: 1 janv. 2010, Date de fin: 31 déc. 2013,

"The overall objective of the project is to assess, optimise and develop the use of advanced tools for the structural integrity assessment of reactor coolant pressure boundary components (RCPB) relevant to ageing and life time management and to integrate the knowledge created in the project into mainstream nuclear industry assessment codes. Realistic failure models for some of the key components w ...
Voir le projet

 21

 TERMINÉ 
"The European Sustainable Nuclear Industrial Initiative was launched in November 2010 to anticipate the development a fleet of fast reactors with closed cycle. Three fast neutron technologies have been selected:• the Sodium cooled Fast Reactor with the ASTRID prototype• the Lead cooled Fast Reactor with the ALFRED demonstrator which will be preceded by a pilotplan MYRRHA• the Gas cooled Fast Rea ...
Voir le projet

 22

 TERMINÉ 

New MS Linking for an Advanced Cohesion in Euratom Research (NEWLANCER)

Date du début: 1 nov. 2011, Date de fin: 31 oct. 2013,

"NEWLANCER project proposes to identify and implement effective and efficient actual solutions leading to enlarged NMS involvement in future Euratom Framework Programmes by strengthening and catalyzing the full R&D potential at national level, by increasing cohesion between New Member States institutions, and by improving their cooperation with Old Member States research centres.The specific sub-o ...
Voir le projet

 19

 TERMINÉ 

Severe Accident Research Network of Excellence 2 (SARNET2)

Date du début: 1 avr. 2009, Date de fin: 31 mars 2013,

Most of the actors involved in severe accident research in Europe, plus Canada, Korea and the United States (41 partners), will network in SARNET2 (Severe Accident Research NETwork of Excellence - Phase 2) their capacities of research in order to resolve important pending issues on postulated severe accidents of existing and future Nuclear Power Plants (NPPs). The project has been defined in order ...
Voir le projet

 45

 TERMINÉ 

European Gas Cooled Fast Reactor (GoFastR)

Date du début: 1 mars 2010, Date de fin: 28 févr. 2013,

Fast reactors have the unique ability to be sustainable by, not only being able to generate their own fuel, but through being able to burn minor actinides to reduce the quantity and radiotoxicity of nuclear wastes. The latter ability enables fast reactors to not only burn the minor actinides produced by themselves but, in addition, the minor actinides arising from legacy wastes and thermal reactor ...
Voir le projet

 22

 TERMINÉ 
"The Integrated Infrastructure Initiative for Neutron Scattering and Muon Spectroscopy (NMI3) aims at the pan-European coordination of neutron scattering and muon spectroscopy, maintaining these research infrastructures as an integral part of the European Research Area. NMI3 comprehensively includes all major facilities in the field, opening the way for a more concerted, and thus more efficient, u ...
Voir le projet

 23

 TERMINÉ 

NUclear Reactor Integrated Simulation Project (NURISP)

Date du début: 1 janv. 2009, Date de fin: 30 juin 2012,

The target of the proposed NURISP Collaborative Project is to make new and significant steps towards a European Reference Simulation Platform for applications relevant to present PWR and BWR and to future reactors. The roadmap of this Simulation Platform will be proposed to be part of the future Strategic Research Agenda of the Sustainable Nuclear Energy Technology Platform (SNE-TP). The first st ...
Voir le projet

 23

 TERMINÉ 

Fusion Energy Materials Science – Coordination Action (FEMaS-CA)

Date du début: 1 oct. 2008, Date de fin: 30 sept. 2011,

The timely availability of qualified materials for use in fusion power reactors is a necessity for the fast deployment of fusion power. 27 European institutions have joined together in the FEMaS-CA to advance fusion materials science in Europe and in close cooperation with EFDA, the European Fusion Development Agreement. The overarching objective of this Coordination Action is: The FEMaS-CA w ...
Voir le projet

 31

 TERMINÉ 

Human ModeL MATROSHKA for Radiation Exposure Determination of Astronauts (HAMLET)

Date du début: 1 sept. 2008, Date de fin: 30 sept. 2011,

"The European Space Agency’s project MATROSHKA (MTR), dedicated to determine the radiation load on astronauts in- and outside the International Space Station (ISS), launched in Jan. 2004 and is currently in its experimental phase 3. MTR is an anthropomorphic upper torso phantom containing over 6,000 radiation detectors to determine the depth- and organ dose distribution in the body. It is the larg ...
Voir le projet

 8

 TERMINÉ 

ADvanced Reactor Initiative And Network Arrangement (ADRIANA)

Date du début: 1 févr. 2010, Date de fin: 31 juil. 2011,

"The coordinating action ADRIANA (ADvanced Reactor Initiative And Network Arrangement) is proposed to setting up the network dedicated to the construction and operation of research infrastructures in support of developments for the European Industrial Initiative for sustainable nuclear fission. The project as the base for the current long-term taking place coordination activities of Euroatom under ...
Voir le projet

 15