Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

ACTivating resource efficiency and large databases in the CLOUD (ACTiCLOUD)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

Despite their proliferation as a dominant computing paradigm, cloud computing systems lack effective mechanisms to manage their vast amounts of resources efficiently, leading to severe resource waste and ultimately limiting their applicability to large classes of critical applications that pose non-moderate resource demands. This creates a significant need to lift existing technological barriers o ...
Voir le projet

 8

 TERMINÉ 

DIabetes REsearCh on patient sTratification (DIRECT)

Date du début: 1 févr. 2012, Date de fin: 31 janv. 2019,

The overarching aims of the DIRECT consortium, consisting of 20 leading academic groups in diabetes and 5 EFPIA companies, are to identify biomarkers that address current bottlenecks in diabetes drug development and to develop a stratified medicines approach to treatment of type 2 diabetes with either existing or novel therapies.There is heterogeneity in who develops diabetes, the rate at which th ...
Voir le projet

 27

 TERMINÉ 

Ice, Climate, and Economics - Arctic Research on Change (ICE-ARC)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2017,

The ICE-ARC project aims to understand and quantify the multiple stresses involved in the change in the Arctic marine environment. Particular focus is on the rapid retreat and collapse of the Arctic sea ice cover and to assess the climatic (ice, ocean, atmosphere and ecosystem), economic and social impacts of these stresses on regional and global scales.It is not possible to look at one aspect of ...
Voir le projet

 26

 TERMINÉ 

ADVanced communicAtions and iNformaTion processing in smArt Grid systEms (ADVANTAGE)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2017,

"Smart Grid systems represent a significant new technology to provide more energy efficient power delivery systems that reduce carbon emissions and can handle a mix of energy sources from small scale renewable energy to large power stations. The design and implementation of the smart grid will be very complex, involving a large number of systems, layers and relationships. In order to make the infr ...
Voir le projet

 8

 TERMINÉ 

Production and Reliability Oriented SOFC Cell and Stack Design (PROSOFC)

Date du début: 1 mai 2013, Date de fin: 31 oct. 2017,

This project aims at improving the robustness, manufacturability, efficiency and cost of SOLIDpower’s state-of-the-art SOFC stacks so as to reach market entry requirements. We propose a focused project addressing the key issues that have manifested themselves in the course of the ongoing product development efforts at SOLIDpower SA. The key issues are the mechanical robustness of solid oxide fuel ...
Voir le projet

 10

 TERMINÉ 
"ECCO-MATE aims to create a research and training platform for the development and implementation of novel fuel mixture preparation, injection profiling, air management and staged/low temperature combustion technologies both in marine and light-duty automotive diesel engines. The marine (slow speed, large-sized, two-stroke engines) and land-transport (high speed, small-to-medium-sized, four-stroke ...
Voir le projet

 12

 TERMINÉ 

New operational steps towards an alliance of European research fleets (EUROFLEETS2)

Date du début: 1 mars 2013, Date de fin: 28 févr. 2017,

EUROFLEETS2 is the enhancement of EUROFLEETS1, with the aim of developing a new pan-European distributed infrastructure with common strategic vision and coordinated access to Research Vessels (RVs) and marine equipment. EUROFLEETS2 will furthermore undertake specific actions to consolidate research fleets’ organization, methodology and tools through operational initiatives (like virtual fleets) le ...
Voir le projet

 32

 TERMINÉ 
NACLIM aims at investigating and quantifying the predictability of the climate in the North Atlantic/European sector related to North Atlantic/Arctic sea surface temperature (SST) and sea ice variability and change on seasonal to decadal time scales. SST and sea-ice forcing have a crucial impact on weather and climate in Europe. Rather than running climate forecasts ourselves, we will analyze the ...
Voir le projet

 18

 TERMINÉ 

User Empowerment for Enhanced Online Presence Management (USEMP)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2016,

A large majority of Europeans engage with Online Social Networks (OSNs) and a recent Eurobarometer study concludes that 74% of respondents think that they do not have enough control of the data they share and 70% are concerned with the way such data are handled by OSNs. In response to these concerns, USEMP aims at developing a framework that will empower users by enhancing their control over the d ...
Voir le projet

 7

 TERMINÉ 

Automation and Robotics for EUropean Sustainabile manufacturing (AREUS)

Date du début: 1 sept. 2013, Date de fin: 31 août 2016,

European Factories of the Future will have to be smart and green:• SMART: high performance, reconfigurable, adaptive and evolving factories based on robotic technologies ,• GREEN: reduced ecological footprint through a more efficient use, at factory level, of material and energy resources.Industrial Robotics is the strategic technology needed to keep the European Manufacturing leading edge, unfort ...
Voir le projet

 12

 TERMINÉ 
"EPIC-CVD's overarching goal is to provide clinicians and policy-makers with a menu of evidence-based options for cost-effective individualised risk assessment that enables the EU's increasingly resource-constrained economies to achieve more personalised predictive medicine in harmony with Europe's diverse cultures and healthcare systems.We will achieve this through developing and validating innov ...
Voir le projet

 33

 TERMINÉ 
Micro- and nanometer structuring has proven to be an efficient method to functionalize surfaces, and is attractive to manufacturers of plastic products. Plastic components are volume manufactured by injection moulding. Compact Discs and Digital Video Discs are today manufactured with nanometer range lateral resolution but, only on planar surfaces. Free-form (double-curved) moulding tools today off ...
Voir le projet

 14

 TERMINÉ 

Towards off flavour free finfish aquaculture (SPACETASTE)

Date du début: 1 sept. 2013, Date de fin: 30 nov. 2015,

"Off flavour is the presence of undesired sensory properties in food items. Most common in aquaculture products are earthy-musty off flavours caused by the presence of geosmin and 2-methyl-iso-borneol (MIB) in fish tissues. Off flavour is associated to land-based aquaculture production systems with high nutrient loadings such as pond systems and recirculating aquaculture systems (RAS).Off flavour ...
Voir le projet

 9

 TERMINÉ 

Intelligent Fault Correction and self Optimizing Manufacturing systems (IFaCOM)

Date du début: 1 nov. 2011, Date de fin: 30 avr. 2015,

The goal of zero defect manufacturing encompasses both short and long term perspectives. The short term perspective is to develop and implement a real time process control system that eliminates the production of any faulty component due to variances in materials, components and process properties. The long term perspective is to minimize all failures by continuous optimizing of the production pro ...
Voir le projet

 15

 TERMINÉ 
The development of shared structures for education and research in Scandinavian Studies has been the main goal for Centre for Scandinavian Studies since it's start in 2010. By now the organization has acquired the necessary competence and capacity to provide the Öresund region with education, research and information in neighbor language and culture on a broad scale.
Voir le projet

 2

 TERMINÉ 
The objective of the JoRIEW project is to reinforce the cooperation capacities of Jordanian research centres by promoting closer scientific collaboration with a number of ERA located research centres and universities. The JoRIEW project will help structure and enhance S&T cooperation in areas of common interest, such as research system integration, integrated energy and water planning, development ...
Voir le projet

 8

 TERMINÉ 

Cluster for Accelerator Technology (CATE)

Date du début: 31 déc. 2010, Date de fin: 30 déc. 2013,

With the prospects of big labs ESS and MAX IV, and the coming need of accelerator technology, companies in the region need to learn how to provide the required technology. To enable companies to compete internationally regarding design, construction, maintenance of high technology accelerator related equipment, close cooperation between Danish, Norwegian and Swedish universities and companies is e ...
Voir le projet

 5

 TERMINÉ 

Product Research and Optimization of Krill (PROKrill)

Date du début: 1 déc. 2009, Date de fin: 30 nov. 2013,

Antarctic krill (Euphausia superba) is an abundant marine resource that can help meet the world’s growing food demand, providing feed (for aquaculture and monogastric livestock) and dietary supplements for humans. Although protein-rich krill contains Omega 3/EPA/DHA and antioxidant astaxanthin, it is under utilized because F and Cu concentrations exceed EU limits for feed, enzymes rapidly taint th ...
Voir le projet

 3

 TERMINÉ 
ModNanoTox will develop a number of well-documented and technically advanced models describing the behaviour of engineered nanoparticles in organisms and the environment. Background to these models will be a thoroughly documented database, constructed based on: (1) an advanced evaluation of physicochemical properties of nanoparticles and in silico modelling of their reactivity; and (2) assessment ...
Voir le projet

 6

 TERMINÉ 

Center for evacuation security in the Oresundregion (KESO)

Date du début: 31 mai 2010, Date de fin: 30 mai 2013,

The Öresund region share issues with regards to complex building constructions, i.e. buildings and constructions that are complicated from an evacuation point of view. The project will lead to a cross border evacuation strategy, applicable and equally relevant in Denmark and Sweden. ...
Voir le projet

 3

 TERMINÉ 

FoodBest Oresund Phase II

Date du début: 30 sept. 2011, Date de fin: 29 avr. 2013,

Foodbest Oresund Phase II is working for a transformation from the traditional food industry and low technology culture into a new innovation-driven, high-tech culture with new business models. This project aims at consolidating this positioning, strenghening the relations between stakeholders in Denmark and Sweden and with important food companies and research/ education institutes across Europe. ...
Voir le projet

 7

 TERMINÉ 

Silent Spaces

Date du début: 28 févr. 2010, Date de fin: 27 févr. 2013,

The project will contribute to a harmonization of legal requirements and acoustic classification criteria for buildings, which are currently quite different in the two countries (SE and DK) and therefore set barriers for the trans-frontier collaboration and trade. It aims create a more sustainable environment by reducing noise and vibrations in buildings and dwellings. ...
Voir le projet

 5

 TERMINÉ 

Coasts of the Future

Date du début: 31 déc. 2009, Date de fin: 30 déc. 2012,

The project Coasts of the Future is a co-operation project between actors engaged in costal area development in the Oresund-Kattegat-Skagerrak-region. The coastal areas have experienced an extensive industrial change – from traditional enterprises such as fishing boats to tourism. A challenge is to adapt to the change in a way that leads to economic growth, and at the same time preserve environmen ...
Voir le projet

 9

 TERMINÉ 

Oresund Materials Innovation Community (Phase 2)

Date du début: 30 avr. 2010, Date de fin: 30 déc. 2012,

The projects partners intend to develop the Oresund innovation system within materials science, to create the fundament to make the region a world leading materials science centre. To reach this goal, the project will work with linking the regional strengths, making use of the innovation capacity within materials science, and integrating the innovation system across Oresund. ...
Voir le projet

 19

 TERMINÉ 

Sound Settlements

Date du début: 31 déc. 2009, Date de fin: 30 déc. 2012,

Research institutions in Sweden and Denmark will work with five case areas in a crossdiciplinary manner. A vital concept is the sound settlement, which represents a holistic view on dwellings, places of work, services, recreation and a sustainable infrastructure. An interdisciplinary research group with Danish and Swedish researchers will co-operate with local politicians, officials, architects an ...
Voir le projet

 11

 TERMINÉ 

Centre for Scandinavian Studies (CSS)

Date du début: 31 juil. 2010, Date de fin: 30 déc. 2012,

The long-term goal is to make the resulting centre into the leading institution worldwide for research and education in Scandinavian Studies, encompassing the fields of language, literature and culture. Expected Results: Co-op ...
Voir le projet

 3

 TERMINÉ 
"The elicitation of broadly neutralising antibodies (Nab) remains the primary and most challenging goal in HIV-1 vaccine development. Although a few anti-HIV-1 monoclonal antibodies with broadly neutralising capability have been isolated from infected individuals, none of the immunization strategies thus far explored has proven effective in inducing similar antibodies. Objective of this applicatio ...
Voir le projet

 18

 TERMINÉ 

Arctic Tipping Points (ATP)

Date du début: 1 févr. 2009, Date de fin: 31 janv. 2012,

The broad interdisciplinary consortia assembled in the Arctic Tipping Points (ATP) project will be managed (WP1) to identify the elements of the Arctic marine ecosystem likely to show abrupt changes in response to climate change, and establish the levels of the corresponding climate drivers inducing the regime shift for these tipping elements. ATP will evaluate the consequences of crossing those t ...
Voir le projet

 13

 TERMINÉ 

NET INFORMATION INTEGRATION SERVICES FOR SECURITY SYSTEMS (NI2S3)

Date du début: 1 juil. 2009, Date de fin: 30 sept. 2011,

"The key idea of proposed project is to research and implement a reference methodology for developing security systems based on NEC Information and Integration Services, able to integrate information from many and heterogeneous sources, in order to build up or improve the situation awareness of critical infrastructures. In particular, the main objectives include:  Definition of a operational sce ...
Voir le projet

 6

 TERMINÉ 
[EASY-ECO 2008-2010] is a training and conference programme on evaluations in the specific context of sustainable development. Sustainability evaluations are important for Europe because they support decision-making processes by highlighting strengths and weaknesses of particular policies, programmes and projects, they make policies more transparent and accountable and they support organisational ...
Voir le projet

 9

 TERMINÉ 
"The implementation of a prevention-oriented injury surveillance in the EU is a major demand towards the Member States in the recent “EC Council Recommendations on the prevention of injury and the promotion of safety”. Needed in particular are valid and reliable indicators for the array of external causes of injury morbidity, like involved activities, products and mechanisms, and for the most seve ...
Voir le projet

 13

 TERMINÉ 

Developing a Crisis Communication Scorecard (CrisComScore)

Date du début: 1 févr. 2008, Date de fin: 30 avr. 2011,

The outcome of this project will be an audit instrument - a Scorecard and relevant Guides - as a tool for ensuring effective crisis communication strategies and implementation. The Scorecard will enable public authorities to measure and improve their readiness for crisis communication. The Guides facilitate effective media relations and crisis communication strategies for various public groups. ...
Voir le projet

 5

 TERMINÉ 
Coastal and river tourism is a rapidly growing sector in Europe, the largest employer among all maritime activities, and makes a vital contribution to the economies of coastal communities, providing not only direct employment but also spin-off benefits. Foreign visitors constitute a significant proportion of coastal tourists. Because it is largely seasonal, however, many workers are low-skilled an ...
Voir le projet

 10

 TERMINÉ 
The purpose of the project is to support regional tourism organisations, the tourist business industry and people working within tourism by developing a webbased tourism portal which among other things will have an education module. Furthermore, the project will work with various methods to ensure that the tourist organisations have an even standard of service and quality and that even more local ...
Voir le projet

 2

 TERMINÉ 
VET providers all over Europe experience the same problem: students leave education or training without completing it. Most of these early school leavers struggle with social, mental or learning problems and many end up being not in education, employment or training (NEET). In a society with lurking demographic challenges and economic and social problems NEET is not a solution, neither to the youn ...
Voir le projet

 14

 TERMINÉ 
The implementation of the Bologna Process is well-advanced at most European universities. Yet the adjustments of degree formats in order to form a new European Higher Education Area with minimal educational boarders triggered new questions. The European call for knowledge transfer, competitiveness, and smart mobility calls for a systematic implementation of joint degree programmes. While double de ...
Voir le projet

 6

 TERMINÉ 
The overall aim of this proposal is to contribute to the sustainable development of Egypt in the field of Higher Education by using mobility flows to improve the career prospects of students and promoting intercultural understanding through institutional cooperation. The development of teaching and learning will occur through the student mobilities. The great variety of thematic fields offered by ...
Voir le projet

 20

 TERMINÉ 

S2-L05

Date du début: 15 juil. 2010,

88 students and staff will take part in a quality mobility programme. 23 European students and staff and 65 students and staff from the Gulf Countries will participate in a mobility programme at master, doctorate, post doctorate and staff level.
Voir le projet

 12

 TERMINÉ 
University Lifelong Learning (henceforth, ULLL) has just recently started to be an issue for the institutions implementing the main BMD reform. The project aims to monitor the way in which the flexibility offered by the Bologna reforms and tools are being used to develop ULLL and map progress since the first BeFlex survey in 2006.
Voir le projet

 11

 TERMINÉ 
EMIT - first on-line training for healthcare professionals : EMIT develops a work-linked training in hospitals on Ultrasound and Magnetic Resonance Imaging Technology for young medical physics graduates and other healthcare professionals. New curricula, timetables and ICT training materials (electronic and web-based) for two training modules have been developed. EMIT materials are loaded onto an ...
Voir le projet

 8