Rechercher des projets européens

15 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Voir le projet

 101

 TERMINÉ 

Reducing Internet Transport Latency (RITE)

Date du début: 1 nov. 2012, Date de fin: 30 nov. 2015,

The present Internet limits the performance of applications that need real-time interaction. In part this is because the design of the network has been optimised to boost throughput, maximising efficiency for bulk applications. There is evidence that large buffers throughout the network have added to the end-to-end latency, with excessive delays severely impacting the quality experienced by users. ...
Voir le projet

 9

 TERMINÉ 

Online Remote Condition Monitoring of Tidal Stream Generators (REMO)

Date du début: 1 déc. 2012, Date de fin: 30 nov. 2014,

Tidal stream power is a very environmentally attractive renewable energy source whose exploitation is being retarded by operation and maintenance problems which cause very low availability times, as poor as 25%.So the REMO project gaol is to provide an enabling technology for tidal stream energy, by reducing the projected life cycle maintenance costs of tidal stream energy by 50% and the generato ...
Voir le projet

 9

 TERMINÉ 

Modernisation of Vessels for Inland waterway freight Transport (MOVE IT!)

Date du début: 1 nov. 2011, Date de fin: 31 oct. 2014,

In response to the call’s demand for cost effective modernization of the inland fleet for freight transport, MoVe IT! develops a suite of options for the modernisation of inland ships that meet the challenges of over-aging of the fleet, climate change and stronger environmental objectives and provides decision support regarding the application of these options. In this suite of options, knowledge ...
Voir le projet

 23

 TERMINÉ 

Internet Connected Objects for Reconfigurable Ecosystems (iCore)

Date du début: 1 oct. 2011, Date de fin: 31 oct. 2014,

The iCore initiative addresses two key issues in the context of the Internet of Things (IoT), namely: (a) how to abstract the technological heterogeneity that derives from the vast amounts of heterogeneous objects, while enhancing context-awareness, reliability and energy-efficiency. (b) to consider the views of different users/stakeholders (owners of objects & communication means) for ensuring pr ...
Voir le projet

 28

 TERMINÉ 
The objective of this project proposal is to develop an alerting tool that(a) allows for a rapid simulation of the impact of different alerting strategies (depending on the selected media-mix and current availability of communication media), (b) supports the composition of the optimal mix of communication channels (individualized alerting channels and mass media), (c) improves alert compliance thr ...
Voir le projet

 12

 TERMINÉ 

Smart Metropolitan Areas Realised Through Innovation & People - SMARTiP (SMARTiP)

Date du début: 1 nov. 2010, Date de fin: 31 mars 2014,

The idea of the SMARTiP project is to take the experience developed by a wide range of existing user-driven, open innovation initiatives in Europe, particularly those developed through Living Labs, and to apply this experience to the challenge of transforming public services by empowering 'smart citizens' who are able to use and co-produce innovative Internet-enabled services within emerging 'smar ...
Voir le projet

 13

 TERMINÉ 

Policy and Security Configuration Management (PoSecCo)

Date du début: 1 oct. 2010, Date de fin: 31 déc. 2013,

Future Internet (FI) applications will see dynamic compositions of services providing a broad diversity of functions, starting with business functionality down to infrastructure services. Their progress crucially depends on the service providers' ability to deal with two interdependent challenges: (1) to achieve, maintain and prove compliance with security requirements stemming from internal needs ...
Voir le projet

 11

 TERMINÉ 

GEOTRACEBILITY FAIR TRADE (GEO FAIR TRADE)

Date du début: 1 avr. 2009, Date de fin: 30 sept. 2012,

Fair Trade is an activity area where CSOs play a key role. Fair Trade is also an activity area promoting the best social, economic and environmental practices of sustainable development. Unfortunately CSOs do not have the means to develop concerted strategies in Research and Technology Development. Their short term concerns often prevent them to have the necessary hindsight. The main objective of ...
Voir le projet

 11

 TERMINÉ 

Aftermath Crisis Management System-of-systems Demonstration (ACRIMAS)

Date du début: 1 févr. 2011, Date de fin: 31 mai 2012,

"Crisis management (CM) is a core capability of modern societies, but a highly diversified and heterogeneous area. Current CM in the EU can be regarded as a “system-of-systems” integrating diverse organisations and components with different cultures, policies and assets, and various stakeholders and procurement schemes. ACRIMAS understands the term “system-of-systems” that it incorporates technolo ...
Voir le projet

 15

 TERMINÉ 

Together Anywhere, Together Anytime (TA2)

Date du début: 1 févr. 2008, Date de fin: 31 mars 2012,

How can technology help to nurture family-to-family relationships? This is the question asked by the collaborative project "Together Anywhere, Together Anytime" (TA2).For many people, families form the key social unit. Many of our enduring experiences, holidays, celebrations and moments of fun and laughter are framed as family events. This is something that current technology does not address well ...
Voir le projet

 14

 TERMINÉ 

Evolved Internet Future for European Leadership (EIFFEL)

Date du début: 1 janv. 2008, Date de fin: 31 oct. 2010,

The EIFFEL Support Action forms a structure addressing the challenges of the Future Internet and the networked society of the future as a whole. Its foundations lie in the EIFFEL think tank formed in July 2006 from a group of individual researchers from both academia and industry, facilitated by the European Commission. Despite being highly successful in its operation, the current EIFFEL think tan ...
Voir le projet

 8

 TERMINÉ 

Secure Widespread Identities for Federated Telecommunications (SWIFT)

Date du début: 1 janv. 2008, Date de fin: 30 juin 2010,

Identity Management is considered key to private, legal and business transactions as in the European eIDM2010. IdM frameworks are however currently confined to the web services domain. SWIFT goes beyond this by including user centricity and network operators as additional interdependent domains with IdM at the core.This new view of user centricity provides a novel perspective: Identity as central ...
Voir le projet

 10

 TERMINÉ 
A reliable and cost efficient broadband infrastructure is vital for the economy and society of the 21st century. Broadband access based on hybrid fibre-coax (HFC) networks stimulates the accretion of broadband markets and features strong service innovation. The further development of HFC architecture and transmission technologies is essential for maintaining the ability to meet the future requirem ...
Voir le projet

 7

 TERMINÉ 

Support Action for the NEM European Technology Platform (4NEM)

Date du début: 1 oct. 2007, Date de fin: 30 nov. 2009,

In 2004, the Networked and Electronic Media (NEM) industrial sector launched the NEM European Technology Platform. Three years later, the NEM community has grown to more than 500 members.In the early time of FP7, the NEM platform intends to help to the birth of the NEM industry sector, develop its influence on the European organisations, and improve its presence on the international scene.The 4NEM ...
Voir le projet

 16