Rechercher des projets européens

19 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

LNG-BC: Liquefied Natural Gas Blue Corridors (LNG BLUE CORRIDORS)

Date du début: 1 mai 2013, Date de fin: 30 avr. 2017,

"LNG Blue Corridors unites/mobilizes the critical mass of experience (know-how, expertise, (industrial) parties and stakeholders) in LNG transport and infrastructure technology. It involves cooperation between heavy duty vehicle manufacturers, fuel suppliers, fuel distributors and fleet operators. The project includes a first definition of European LNG Blue Corridors, with strategic LNG refuelling ...
Voir le projet

 27

 TERMINÉ 

Technology Transfer in Computing Systems (TETRACOM)

Date du début: 1 sept. 2013, Date de fin: 31 août 2016,

The mission of the TETRACOM Coordination Action is to boost European academia-to-industry technology transfer (TT) in all domains of Computing Systems. While many other European and national initiatives focus on training of entrepreneurs and support for start-up companies, the key differentiator of TETRACOM is a novel instrument called Technology Transfer Project (TTP). TTPs help to lower the barr ...
Voir le projet

 33

 TERMINÉ 

Safety of ACtinide Separation proceSSes (SACSESS)

Date du début: 1 mars 2013, Date de fin: 30 juin 2016,

"Nuclear power plays a key role in limiting EU’s greenhouse gases emissions, and makes an important contribution to improve European Union’s independence, security and diversity of energy supply. However, its social acceptance is closely linked to an enhanced safety in the management of long-lived radioactive waste contributing to resource efficiency and cost-effectiveness of this energy and ensur ...
Voir le projet

 26

 TERMINÉ 
PV CROPS addresses 3 key objectives of the call topic:1) Improvement of performance, reliability and lifetime2) Cost reduction of PV systems3) Better integration of PV into gridThe 2 first objectives lead to a lower Levelized Cost of Energy, LCoE. So, the main objectives of PV CROPS are:1- Reduction of 30% of the LCoE of PV to achieve 0.14-0.07 €/kWh by 2020 and 0.20–0.09 €/kWh by 2015 and an incr ...
Voir le projet

 12

 TERMINÉ 

Additive Manufacturing for Wear and Corrosion Applications (AMCOR)

Date du début: 1 nov. 2012, Date de fin: 31 oct. 2015,

AMCOR will develop and demonstrate Laser Metal Deposition (LMD) industrial manufacturing systems for the deposition of functional graded coatings (FGM) and 3D features onto metallic components supplied by industry that are subjected to in-service wear and corrosion. This will be supported by the development, production and testing of mixed powder combinations for coatings suitability.The proposed ...
Voir le projet

 16

 TERMINÉ 

Hardware- and Network-Enhanced Software Systems for Cloud Computing (HARNESS)

Date du début: 1 oct. 2012, Date de fin: 30 sept. 2015,

The dominant approach in offering cloud services is based on homogeneous commodity resources: large numbers of inexpensive machines, interconnected by off-the-shelf networking equipment, supported by stock disk drives. This is consistent with the predominant business model for data centre cloud computing, which leverages homogeneous computation, communication, and storage to provide low-cost appli ...
Voir le projet

 6

 TERMINÉ 

Smart Intelligent Aircraft Structures (SARISTU)

Date du début: 1 sept. 2011, Date de fin: 31 août 2015,

The project proposal concerns the challenges posed by the physical integration of smart intelligentstructural concepts. It addresses aircraft weight and operational cost reductions as well as animprovement in the flight profile specific aerodynamic performance.This concerns material concepts enabling a conformal, controlled distortion of aerodynamicallyimportant surfaces, material concepts enablin ...
Voir le projet

 68

 TERMINÉ 
In all industrial sectors, Non Destructive Evaluation techniques play a critical role for ensuring structures reliability, plant safety and increasingly also for ensuring quality and efficiency of products and processes. The emerging use of numerical simulation is a major trend in the field with tremendous potential benefits in terms of costs reduction, enhanced diagnosis reliability and consequen ...
Voir le projet

 20

 TERMINÉ 
Carbon Capture and Sequestration has become an important technology to comply with the CO2 reduction targets set by the EC. However CCS has the drawback that the electrical efficiency of the coal fired power plant will drop significantly. To overcome this drawback, one has to increase the base efficiency of the power plant or increase the biomass co-firing share as this is a CO2 neutral energy sou ...
Voir le projet

 15

 TERMINÉ 

Adaptive Strategies for Sustainable Long-Term Social Interaction (ALIZ-E)

Date du début: 1 mars 2010, Date de fin: 31 août 2014,

Description From theory to practice: Methods for an adaptive and prolonged child-robot interaction The goal of ALIZ-E is to develop novel methods for developing and testing interactive, mobile robots which will be able to socially interact with human users over extended periods of time, i.e. a pos ...
Voir le projet

 12

 TERMINÉ 

DC/DC COnverter-based Diagnostics for PEM systems (D-CODE)

Date du début: 1 mars 2011, Date de fin: 31 mai 2014,

"The D-CODE project aims at developing and implementing on-line electrochemical impedance spectroscopy (EIS) to have direct and meaningful information on the system status. EIS has been proven to be an effective diagnostic tool for laboratory tests. It will be implemented on-board thanks to a new DC/DC converter conceived by the D-CODE’s partners. The new hardware will be developed together with d ...
Voir le projet

 7

 TERMINÉ 

Low Emission Gas Turbine Technology for Hydrogen-rich Syngas (H2-IGCC)

Date du début: 1 nov. 2009, Date de fin: 30 avr. 2014,

The overall objective of this project is to provide and demonstrate technical solutions which will allow the use of state-of-the-art highly efficient, reliable gas turbines in the next generation of IGCC plants, suitable for combusting undiluted hydrogen-rich syngas derived from a pre-combustion CO2 capture process, with high fuel flexibility. The recognised challenge is to operate a stable and co ...
Voir le projet

 25

 TERMINÉ 
"In nuclear power plants, materials may undergo degradation due to severe irradiation conditions that may limit their operational life. Utilities that operate these reactors need to quantify the ageing and the potential degradations of some essential structures of the power plant to ensure safe and reliable plant operation. So far, the material databases needed to take account of these degradation ...
Voir le projet

 23

 TERMINÉ 

Actinide reCycling by SEParation and Transmutation (ACSEPT)

Date du début: 1 mars 2008, Date de fin: 30 sept. 2012,

"Actinide recycling by separation and transmutation is considered worldwide and particularly in several European countries as one of the most promising strategies to reduce the inventory of radioactive waste, thus contributing to make nuclear energy sustainable. Consistently with potentially viable recycling strategies, the Collaborative Project ACSEPT will provide a structured R&D framework to de ...
Voir le projet

 35

 TERMINÉ 

New Molecular Purification Technology for Pharmaceutical Production (NEMOPUR)

Date du début: 1 sept. 2008, Date de fin: 31 août 2012,

"The NEMOPUR Initial Training Network will focus on creating a new generation of molecular purification technologies for Active Pharmaceutical Ingredient (API) manufacture, with a particular focus on removal of organic impurities from API production. New membranes with improved chemical stability in a wide range of solvents, and better controlled cutoff properties, novel molecularly imprinted poly ...
Voir le projet

 9

 TERMINÉ 

High Power Electric propulsion: a Roadmap for the future (HiPER)

Date du début: 1 oct. 2008, Date de fin: 31 janv. 2012,

The main objective of the HiPER project is to initiate technological and programmatic consolidation in the development of innovative electric propulsion technologies (and of the related power generation) to fulfill future European space transportation needs. The objective will be pursued by conceiving and substantiating a long term vision for European space transportation and exploration, conside ...
Voir le projet

 21

 TERMINÉ 

Trusted Architecture for Securely Shared Services (TAS3)

Date du début: 1 janv. 2008, Date de fin: 31 déc. 2011,

The TAS3 (Trusted Architecture for Securely Shared Services) proposes an Integrated Project that will develop and implement an architecture with trusted services to manage and process distributed personal information. This architecture will be dependable, robust but at the same time also cost-effective and reliable. The personal information that will be processed and managed can consist of any typ ...
Voir le projet

 20

 TERMINÉ 

Mobile Energy Resources in Grids of Electricity (MERGE)

Date du début: 1 janv. 2010, Date de fin: 31 déc. 2011,

Electric power systems are facing a major new challenge (and hence opportunity): future massive integration in the electric grid of electric plug-in vehicles (EV). Distribution and transmission grids and power system architectures still follow planning rules and procedures defined for the traditional operational paradigm. Therefore, it is necessary to identify and prepare solutions for the operati ...
Voir le projet

 16

 TERMINÉ 

CO2 Enhanced Separation and Recovery (CESAR)

Date du début: 1 févr. 2008, Date de fin: 31 mai 2011,

"CESAR aims for a breakthrough in the development of low-cost post-combustion CO2 capture technology to provide economically feasible solutions for both new power plants and retrofit of existing power plants which are responsible for the majority of all anthropogenic CO2 emissions (worldwide, approx. 5,000 power plants emit around 11 GtCO2/year). CESAR focuses on post-combustion as it is the only ...
Voir le projet

 22