Rechercher des projets européens

22 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

ABC GATES FOR EUROPE (ABC4EU)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2017,

During the last years, many ABC Gates have been deployed in the main European airports, most of them as pilot projects intended to test their capability to improve the border crossing processes in aspects such as speed, security, automation, false rejection reduction, etc.Experience gained from these pilots has been periodically assessed within the Frontex ABC Workshops, where the need for a harmo ...
Voir le projet

 17

 TERMINÉ 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Voir le projet

 101

 TERMINÉ 

Dependable Embedded Wireless Infrastructure (DEWI)

Date du début: 1 mars 2014, Date de fin: 28 févr. 2017,

DEWI (dependable embedded wireless infrastructure) envisions to significantly foster Europe’s leading position in embedded wireless systems and smart (mobile) environments such as vehicles, railway cars, airplanes and buildings. These environments comprise wireless sensor networks and wireless applications for citizens and professional users. Therefore the consortium introduces the concept of a “s ...
Voir le projet

 61

 TERMINÉ 
Open Educational Resources (OER) has the potential to widen access to education and to improve the quality and cost-efficiency of teaching and learning in Europe. The most successful way to achieve a practical implementation of OERs are Massive Open Online Courses (MOOCs). MOOCs are large-scale online courses and represent one of the latest developments in open education in its continuous e ...
Voir le projet

 22

 TERMINÉ 

Future Internet - Core (FI-Core)

Date du début: 1 sept. 2014, Date de fin: 30 sept. 2016,

FI-WARE has started to materialize as a powerful foundation for the Future Internet. FI-WARE is an innovative, open cloud-based infrastructure for cost-effective creation and delivery of services, at a scale not seen before. FI-WARE is now well under way to successfully achieve its goals of boosting the effectiveness of creating new services of high economic and societal value, reinforcing EU comp ...
Voir le projet

 33

 TERMINÉ 

The Human Brain Project (HBP)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2016,

Understanding the human brain is one of the greatest challenges facing 21st century science. If we can rise to the challenge, we can gain profound insights into what makes us human, develop new treatments for brain diseases and build revolutionary new computing technologies. Today, for the first time, modern ICT has brought these goals within sight. The goal of the Human Brain Project, part of the ...
Voir le projet

 116

 TERMINÉ 
Against the background of the European Innovation Partnership on Active & Healthy Ageing, SmartCare aims to define a common set of standard functional specifications for an open ICT platform enabling the delivery of integrated care to older European citizens. A total of 24 regions and their key stakeholders will define a comprehensive set of integration building blocks around the challenges of dat ...
Voir le projet

 46

 TERMINÉ 
The importance of advanced simulation to the competitiveness of both large and small companies is well established. The principal objective of Fortissimo is to enable European manufacturing, particularly small to medium enterprises (SMEs), to benefit from the efficiency and competitive advantage inherent in the use of simulation. However, the simulation of, for example, high-pressure gas cylinders ...
Voir le projet

 96

 TERMINÉ 
TUCAN3G is built upon the basic premise that considers information and communications as a key factor of human development. The diffusion of ICT in developing countries has been very asymmetric between densely populated urban areas and isolated rural areas. Geographical conditions have often conditioned solutions for Internet connectivity in rural areas, often based on wireless 2G cellular technol ...
Voir le projet

 9

 TERMINÉ 
E-commerce has become a focal point of expansion and growth for the consumer goods industry. This rapidly expanding trend provides an opportunity for childrenswear manufacturers to introduce new commercialization channels, enabling to reach a global audience by selling their products directly to customers and being able to open 24 hours a day, seven days a week. However, the childrenswear sector i ...
Voir le projet

 10

 TERMINÉ 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Date du début: 1 oct. 2013, Date de fin: 31 mars 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Voir le projet

 154

 TERMINÉ 
The stringent Solvent Emission Directive (1999/13/EC), fully transposed in 2007, imposes limitations of emissions of volatile organic compounds (VOC) due to the use of organic solvents in paints and varnishes. The most economical way of limiting VOC emission is using water-based coating formulas in which water replaces a substantial amount of the organic solvents traditionally used. Unfortunately, ...
Voir le projet

 15

 TERMINÉ 
FOTsis (European Field Operational Test on Safe, Intelligent and Sustainable Road Operation) is a large-scale field testing of the road infrastructure management systems needed for the operation of seven close-to-market cooperative I2V, V2I & I2I technologies (the FOTsis Services), in order to assess in detail both 1) their effectiveness and 2) their potential for a full-scale deployment in Europe ...
Voir le projet

 30

 TERMINÉ 
ACOUTRAIN will simplify and improve the acoustic certification process of new rolling stock, in particular relating to the TSI Noise. Today the need of conformity assessment for a new vehicle according to the TSI Noise represents a significant element of both cost and time to market due to the need to carry out expensive and time consuming tests. The goal of the proposed project is to speed up the ...
Voir le projet

 15

 TERMINÉ 

FI-WARE: Future Internet Core Platform (FI-WARE)

Date du début: 1 mai 2011, Date de fin: 31 déc. 2014,

The goal of the FI-WARE project is to advance the global competitiveness of the EU economy by introducing an innovative infrastructure for cost-effective creation and delivery of services, providing high QoS and security guarantees. FI-WARE is designed to meet the demands of key market stakeholders across many different sectors, e.g., healthcare, telecommunications, and environmental services. FI- ...
Voir le projet

 92

 TERMINÉ 
EnergyTIC is a demonstration project that will put into practice innovative ICT solutions available in two different countries, France and Spain, with a common goal: providing the end-users with an easy to understand / intuitive solution allowing him to monitor and adapt its energy and water consumptionTechnical solution: Comprehensive convergent ICT solutions will be implemented in 1700 dwellings ...
Voir le projet

 14

 TERMINÉ 

Reduced Certification Costs for Trusted Multi-core Platforms (RECOMP)

Date du début: 1 avr. 2010, Date de fin: 31 mars 2013,

"The proposed RECOMP (Reduced certification cost for trusted multi-core platforms) research project will establish methods, tools and platforms for enabling cost-efficient certification and re-certification of safety-critical systems and mixed-criticality systems, i.e. systems containing safety-critical and non-safety-critical components.RECOMP recognizes the fact that the increasing processing po ...
Voir le projet

 40

 TERMINÉ 
TheraEDGE is an industry-driven effort to accelerate the adoption of theranostics applications in Primary Care by pushing Point of Care Test (POCT) technology far beyond its current state-of-the-art and by delivering clinical, analytical and operational breakthroughs.TheraEDGE is built around the high-incidence clinical case of early-diagnosing lower respiratory tract infections in Primary Care. S ...
Voir le projet

 16

 TERMINÉ 

Smart Objects For Intelligent Applications (SOFIA)

Date du début: 1 janv. 2009, Date de fin: 31 mars 2012,

"The mission of the SOFIA project is to create a semantic interoperability platform and selected set of vertical applications to form an embedded system based smart environment.We vision smart environment application and services where all the information user wants, needs and should know from local place is easily available. A key factor in these smart environments will be a common, open way of a ...
Voir le projet

 18

 TERMINÉ 

Easy positioning of in-bed patients with reduced mobility (EPOSBED)

Date du début: 1 juil. 2008, Date de fin: 30 sept. 2010,

"The Need The in-bed positioning of patients with limited mobility is of major importance in order to prevent the worsening of their health condition and improve their comfort. The lack of autonomy to undertake basic movements and postural changes causes anguish and discomfort in these patients. Nowadays, nurses need to change manually the position of patients every 2 to 4 hours. The manual handli ...
Voir le projet

 10

 TERMINÉ 
Description With partners around the globe, the FLOSSInclude project is developing a roadmap for international co-operation to realise the potential of FLOSS as a tool for social and economic development.The Southern FLOSS ChallengeFree/Libre/Open Source Software (FLOSS) holds great potential for developing countries. There are no licence ...
Voir le projet

 11

 TERMINÉ 

Conservation of the Spanish Imperial Eagle, Black Vulture, Black Stork (CBD 2003)

Date du début: 1 sept. 2003, Date de fin: 1 sept. 2007,

Background The imperial eagle (Aquila adalberti), the black vulture (Aegypius monachus) and the black stork (Ciconia nigra) are three EU-priority listed species that breed mainly in Spain's Mediterranean-type forests. Their main conservation threats are the degradation of their natural habitats, to which they are highly sensitive, the disturbance caused b ...
Voir le projet

 15