Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

European Virus Archive goes global (EVAg)

Date du début: 1 avr. 2015, Date de fin: 31 mars 2019,

The overall objective will be to create and mobilise an International network of high calibre centres around a strong European group of institutes selected for their appropriate expertises, to collect, amplify, characterise, standardise, authenticate, distribute and track, mammalian and other exotic viruses. The network of EVAg laboratories including 25 institutions represents an extensive range o ...
Voir le projet

 27

 TERMINÉ 

CESBA ALPINE SPACE – SUSTAINABLE TERRITORIES (CESBA Alps)

Date du début: 16 déc. 2015, Date de fin: 15 déc. 2018,

Description (EN): Currently available sustainability assessment tools cover buildings and small urban areas, with no support for the territorial scale, typical in the rural, low density Alpine regions. The project aims to facilitate the development, exchange, and implementation of innovative policies and plans at territorial level based on common assessment tools. By developing a tr ...
Voir le projet

 11

 TERMINÉ 
...ill develop modern Library Staff Development Training Programmes supported by 8 ECTS modules accompanied by online learning media and embedded in curricula in PC universities, Public Administration Institutes and disseminated to external stakeholders such as Public and National libraries to ensure maximum transfer effect to society at large.While the main beneficiaries of the project outputs/produ ...
Voir le projet

 13

 TERMINÉ 

Social Protection Innovative Investment in Long Term Care (SPRINT)

Date du début: 1 juin 2015, Date de fin: 31 mai 2018,

SPRINT project intends to give meaning to the concept of social investment as applied to long-term care provision. Its objective is to articulate in more detail the aspirations of the Social Investment Programme, to provide a means for assessing the social costs and benefits of various ways of providing long-term care for the frail elderly, and to present examples of approaches that do indeed, fa ...
Voir le projet

 13

 TERMINÉ 

Wrist and arm sensing technologies for cardiac arrhythmias detection (WASTCArD)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2018,

Abnormal heart rhythms are a major cause of cardiovascular disease and death in Europe. Sudden cardiac death accounts for 50% of cardiac mortality in developed countries; ventricular tachycardia or ventricular fibrillation is the commonest underlying arrhythmia. In the ambulatory population, atrial fibrillation is the commonest one, and is associated with increased risk of stroke and heart failur ...
Voir le projet

 7

 TERMINÉ 

TEMPORARY VERSUS PERMANENT MIGRATION (TEMPER)

Date du début: 1 mars 2014, Date de fin: 28 févr. 2018,

"The overall objective of the TEMPER project consists of providing a comprehensive assessment of the pros and cons of recent initiatives to promote circular migration as an alternative to more traditional forms of temporary and permanent migration, not only among prospective migrants but also among current residents in the EU. These initiatives usually rely on a poor understanding of the ultimate ...
Voir le projet

 8

 TERMINÉ 

Social Innovation: Driving Force of Social Change (SI-DRIVE)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2017,

SI-DRIVE extends knowledge about social innovation (SI) in three major directions:- Integrating theories and research methodologies to advance understanding of SI leading to a comprehensive new paradigm of innovation.- Undertaking European and global mapping of SI, thereby addressing different social, economic, cultural, historical and religious contexts in eight major world regions.- Ensuring rel ...
Voir le projet

 28

 TERMINÉ 
"The GLOBAL VALUE project develops an innovative framework for assessing impacts of Multinational Corporations (MNCs) on issues related to the Millennium Declaration, sustainable development, human rights, transparency, and anti-corruption. To ensure utility, we will monitor the policy debate on global and sustainable development and deliver a regularly updated catalogue of goals and indicators. W ...
Voir le projet

 12

 TERMINÉ 
Despite improved understanding of the links between ecosystem health, provision of ecosystem services and human well-being, further conceptual and empirical work is needed to make the ideas of ecosystem services (ESS) and natural capital (NC) operational. OpenNESS will therefore develop innovative and practical ways of applying them in land, water and urban management: it will identify how, where ...
Voir le projet

 39

 TERMINÉ 

PROmoting Global REsponsible research and Social and Scientific innovation (PROGRESS)

Date du début: 1 févr. 2013, Date de fin: 31 janv. 2016,

Delivering European Renewal relies heavily on the advancement of Responsible Research and Innovation (RRI) – that is, research and innovation which is:- is ethically acceptable,- is sustainable by avoiding significant adverse effects and- drives towards the common good, i.e. societal desirability.To achieve maximum impact where it is most needed, ProGReSS concentrates on the underexplored and leas ...
Voir le projet

 10

 TERMINÉ 

Capitalizing Alpine Building Evaluation Experiences (CABEE)

Date du début: 30 juin 2012, Date de fin: 29 juin 2015,

CABEE is a transnational Alpine project that aims to create and implement an Alpine-wide guideline for definition, procurement, production, assessment and promotion as well as learning about new and refurbished Nearly-Zero-Emission-Buildings (NZEB) and their neighbourhoods. CABEE capitalizes wisdom from finished and on-going EU-projects but also projects from the Alpine Space program. It focuses o ...
Voir le projet

 12

 TERMINÉ 

Arctic Climate Change, Economy and Society (ACCESS)

Date du début: 1 mars 2011, Date de fin: 28 févr. 2015,

The Arctic is engaged in a deep climatic evolution. This evolution is quite predictable at short (year) and longer scales (several decades), but it is the decadal intermediate scale that is the most difficult to predict. This is because the natural variability of the system is large and dominant at this scale, and the system is highly non linear due to positive and negative feedback between sea ic ...
Voir le projet

 29

 TERMINÉ 
"""Sustainable Urbanisation in China : Historical and Comparative Perspectives, Mega-trends towards 2050 (URBACHINA) combines the knowledge and expertise from a number of different disciplines to provide new and innovative insights and scenarios that can be used guide urbanization in China over the next 40 years. A key strength of the proposal is the use of 'thematic pairs' of European and Chine ...
Voir le projet

 11

 TERMINÉ 

Social services on both sides of the border

Date du début: 4 avr. 2013, Date de fin: 4 janv. 2015,

Objective of the project The objective of the project was to improve the quality of life of people from disadvantaged groups in districts with sparse population in the Republic of Karelia and North Karelia. Main activities• Sociological base-line survey of efficient operating models in low threshold approach services and on needs of beneficiaries, comparing results of the situation in the Republic ...
Voir le projet

 6

 TERMINÉ 

Territorial Indicators of Poverty and Social Exclusion in Europe (TIPSE)

Date du début: 31 janv. 2012, Date de fin: 30 déc. 2014,

Combating poverty and social exclusion rank among the main objectives of the Europe 2020 Strategy. The recent economic crisis has had a huge effect on millions of European citizens with many people losing their jobs, household incomes decreasing and consequently the risk of being affected by poverty increasing. For social exclusion, not only a clear definition seems to be lacking, but also there d ...
Voir le projet

 6

 TERMINÉ 
Objective of the projectThe objective of the project is to build initial capacity for family work in the Republic of Karelia and Oulu Region under the Functional Children and Families Scheme ("Effective Families"). Main activities• Workshops and a study tours in Finland and Karelia. • Trainings in Karelia and Finland on Functional Children and Families Scheme.• Support and monitoring to the traini ...
Voir le projet

 5

 TERMINÉ 

Bringing closer ESPON evidence for decision making (ESPON on the Road)

Date du début: 23 déc. 2013, Date de fin: 30 déc. 2014,

AimThe ESPON 2013 Programme has produced a lot of results and the applied research, targeted analyses, scientific tools and publications provide a huge pool of knowledge that can be actively used in decision making. The project aims at strengthening the bridge between ESPON knowledge and local reality by bringing ESPON results closer to potential users. The project shall provide a platform for dis ...
Voir le projet

 19

 TERMINÉ 

Managing Migration and its Effects in SEE - Transnational Actions Towards (SEEMIG)

Date du début: 31 mai 2012, Date de fin: 29 nov. 2014,

The SEE region faces a complex, nationally and regionally diverse set of demographic, migratory and labour market challenges (low or declining fertility, large scale out-migration, brain and care drain, ageing, low labour force participation rate). Together with further aspects like gender, age and the given territorial heterogeneity of the programme area, they are creating a complex challenge to ...
Voir le projet

 28

 TERMINÉ 
Recent health financing reforms in low and middle income countries aim to introduce affordable prepayment and subsidies for low socio-economic groups. However, while such reforms have led to increased utilization of care, often the poor and informal sector continue to be excluded from coverage.Health Inc. puts forward the hypothesis that social exclusion is an important cause of the limited succes ...
Voir le projet

 6

 TERMINÉ 
The focus of the project is to enhance policy-making, reinforcing the capacity of public administrations to understand, anticipate and strategically manage the implications of demographic change for the growth and cohesion of European regions and cities, and for the overall integration of the SEE area. Local and regional authorities are at the forefront in facing the effects of current demographic ...
Voir le projet

 21

 TERMINÉ 
"Path to Peace: non-formal learning tools for conflict management using outdoor activities" is a 12 days training course hold in Styria, Austria, from the 5th to the 16th of August 2014. 20 youth leaders between 18 and 35 years from 10 countries (Austria, Spain, Italy, Greece, Turkey, Tunisia, Ukraine, Palestine, Georgia and Armenia) will meet in the natural countryside of Austria to learn about t ...
Voir le projet

 10

 TERMINÉ 
Europe is witnessing deep socio-demographic changes, namely the progressive ageing of its population. Elderly and vulnerable persons are increasingly at risk of social exclusion in urban areas due to the impoverishment of family and social linkages and significant infrastructure constraints. At present, the institutionalization of elderly and persons with disabilities presents some critical aspect ...
Voir le projet

 12

 TERMINÉ 

Use ESPON (USESPON)

Date du début: 30 sept. 2012, Date de fin: 30 mars 2014,

USESPON is about capitalization of European perspective on territorial development and cohesion by encouraging the use of work and findings from the ESPON 2013 Programme. The aim is to create awareness and sense of ownership amongst key stakeholders in respect of use of methods and tools developed within the current programme. The strategy is to draw on and share work done in four previous and ong ...
Voir le projet

 6

 TERMINÉ 
Cultural consumption is a knowledge based activity: cultural products and services are viable, only if they possess widely recognized values. SAGITTARIUS advances cultural consumption by communicating cultural values: from natural monuments and ecosystems to sites and collections, from the arts to traditions and handicrafts. Thus values of tangible-intangible, movable-immovable and spiritual herit ...
Voir le projet

 20

 TERMINÉ 
InFLOWence works on the strengthening of the competitive potentials that one territory has when the FUNCTIONAL LINKS between centre and subcentres are valorised by creating the appropriate integration process.TOOLS and INSTRUMENTS of participation and CAPACITY BUILDING processes are implemented and diffused.Proj's approach is applied and validate both at institutional and economic level through ag ...
Voir le projet

 10

 TERMINÉ 
"Goal: To understand long-term trends of population health as a consequence of socio-economic transitions, with a focus on lifestyle-related issues. Overviews: A unique team with extensive expertise in health effects of transition will generate new knowledge on health determinants in 11 CIS countries: Russia, Belarus, Ukraine, Moldova, Kazakhstan, Uzbekistan, Kyrgyzstan, Armenia, Azerbaijan and G ...
Voir le projet

 13

 TERMINÉ 

CEntral and South-east europeAn Resources (CESAR)

Date du début: 1 févr. 2011, Date de fin: 31 janv. 2013,

Description Human language technologies crucially depend on language resources and tools that are usable, useful and available. However, even where language resources and respective tools are available they have been developed mostly in a sporadic manner, in response to specific project needs, with relatively little regard to their long-term ...
Voir le projet

 9

 TERMINÉ 
The ESPONTrain Project is aiming at making ESPON2013 knowledge operational in a coordinated and transnational way for practical use at regional and local level, and translating ESPON Europe-wide information and findings to the regional/local level. Specifically, the project is aiming at: •Stimulating a transnational educational and training ESPON activity facilitated by both an e-learning procedur ...
Voir le projet

 10

 TERMINÉ 

Interregional SME Supply Clusters along the Northeast Corridor (BalticSupply)

Date du début: 30 nov. 2009, Date de fin: 15 déc. 2012,

BalticSupply (BS) is a transnational project co-financed by the European Regional Development Fund and made possible by the Baltic Sea Region (BSR) Programme. The project addresses the problem that very often markets in the BSR are too small and the fact that SMEs encounter a number of access barriers to European supply markets. These barriers cause competitive disadvantages for Baltic SMEs and th ...
Voir le projet

 16

 TERMINÉ 
ImPrim – a Primary Health Care flagship project. There are substantial health differences between the countries in the Baltic Sea Region (BSR). These inequalities have a relationship to social problems. The ImPrim project aims at promoting equitably distributed high quality Primary Health Care services in the BSR in order to increase the cost-efficiency of the public health system and more efficie ...
Voir le projet

 13

 TERMINÉ 

Borders for people (HUSKROUA/0901/069)

Date du début: 28 sept. 2010, Date de fin: 27 sept. 2012,

...ighboring regions of Ukraine, Slovakia, Romania and Hungary.Specific objectives:1) Formation of the system of international monitoring of transborder cooperation 2) Establishment of the International Institute of Transborder Cooperation and Security of Borders (IICS) as an organizational mechanism of coordination of main aims, forms and methods of transborder activities of national subjects Main a ...
Voir le projet

 2

 TERMINÉ 
Demographic Change is a main driving force all over Europe. The population within most mountain regions of the Alpine Space already today differs from the surrounding metropolitans. Beside the general trend of the aging of the Europeans there exist additional Alpine specific factors of regional different influence: migration (in – out), commuting (rural to urban areas) settlement and housing (cost ...
Voir le projet

 13

 TERMINÉ 
The recent technical improvements for the study of the cytogenetic basis of disease have led to the identification of many microdeletion and microduplication syndromes. De novo copy number variants (CNVs) are seen more often than expected in autistic patients, and rare chromosomal aberrations are known to account for a small fraction of schizophrenia and bipolar disorder. Recurrent spontaneous mut ...
Voir le projet

 8

 TERMINÉ 

ESPON in Integrated Territorial Strategies (INTERSTRAT)

Date du début: 31 janv. 2010, Date de fin: 29 févr. 2012,

The aim of this project is to encourage and facilitate the use of ESPON findings in the creation and monitoring of integrated territorial development strategies and to support transnational learning about the actual and potential contribution of ESPON to integrated policy-making. Its focus is active learning, using ESPON analysis and related data in the development of integrated territorial develo ...
Voir le projet

 9

 TERMINÉ 
...better projection of the EU’s image, enhancing the EU’s “soft power” in China. The project brings together a uniquely strong team from the University of Nottingham’s China Policy Institute, Leiden University, Jacobs University Bremen and Chatham House, as well as two strong Chinese partners. New knowledge from this research will help advance a number of social science disciplines.
Voir le projet

 6

 TERMINÉ 

Plant Production of Vaccines (PLAPROVA)

Date du début: 1 janv. 2009, Date de fin: 31 déc. 2011,

"Advances in the technologies for expressing proteins and extracting them from plants have allowed several plant-made products to be assessed for safety and efficacy. The results have been favourable and have culminated in the demonstration that plant-produced vaccine can protect target animals against challenge. However, most of these successes have concerned the production of antigens which had ...
Voir le projet

 11

 TERMINÉ 
"The issue of concern of the AWARE project is the anthropogenic deterioration of water ecosystems, in particular in coastal areas. The new approach proposed by the AWARE project to enhance connectivity between research and policy-making exploit the concept of integrated adaptive ecosystem management, engaging scientists, policy makers and the public (the latter including both stakeholders and lay ...
Voir le projet

 14

 TERMINÉ 
Throughout Europe the challenge of providing a cost effective integrated public transport system is seen as an essential prerequisite to reducing pollution and congestion whilst encouraging sustainable economic growth.The traditional fixed route services is ideal for clustered travel demand areas but the changing of habitation patterns and nature of work activities in today’s society have created ...
Voir le projet

 11

 TERMINÉ 

Research Infrastructures: Foresight and Impact (RIFI)

Date du début: 1 mars 2009, Date de fin: 31 mai 2011,

"The RIFI objectives are: - to create a methodology for evaluation of the socio-economic impact of investments in RIs, - to test and improve the elaborated methodology based on its application to several case studies in Romania and Bulgaria (at all the three levels of investment: pan European, regional and national), - to complement the methodology through integrating foresight, and to elaborate o ...
Voir le projet

 13

 TERMINÉ 
The grand vision for the Digital Research Infrastructure for the Arts and Humanities (DARIAH) is to facilitate access to research material for the humanities and for supporting the preservation of digital heritage material in Europe. DARIAH connects information users (researchers), information managers and information providers. It gives them a technical framework that enables enhanced data sharin ...
Voir le projet

 15