Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
The project trans-making aims to establish a multilateral network of research and innovation staff active in the fields of placemaking/place-based art activities as a space to create alternative narratives for social, economic and democratic renewal.It will investigate and experiment with placemaking to contribute actively to the democratization/well-being of society, educating and empowering indi ...
Voir le projet

 15

 TERMINÉ 
...table obstacles. This project systematises practical processes essential for the creation of a new, East-West strand of contemporary music and opera. It initiates cutting-edge research workshops in Istanbul, Holland and the UK to: 1. Train top-level traditional instrumentalists and singers in Turkey effectively to perform a new repertoire; 2. Train top professional Western singers in non-Western t ...
Voir le projet

 3

 TERMINÉ 
The main goal of this project is developing a complete synthesis and optimization methodology for switching nano-crossbar arrays that leads to the design and construction of an emerging nanocomputer. New computing models for diode, FET, and four-terminal switch based nanoarrays are developed. The proposed methodology implements both arithmetic and memory elements, necessitated by achieving a compu ...
Voir le projet

 5

 TERMINÉ 
...ch faculties or departments of engineering, architecture who would like to learn about the protection of geographical indications (GIs) and traditional specialities guaranteed (TSG) in EU Law at Istanbul Technical University. The duration of programme is 42 hours (14 weeks) which will be designed as one semester course. A new teaching module on protection of geographical indications and traditio ...
Voir le projet

 1

 TERMINÉ 
Refugees and migrants and integration into the labour market as a key strategy to tackle the refugee crisesThe influx of refugees and migrants into the European Union has recently reached a high level. The crisis constitutes an urgent call to the member countries of the European Union to work together and develop efficient strategies for coping with the challenges that arise. European countries ne ...
Voir le projet

 6

 TERMINÉ 

Re-use of modernist buildings - Design tools for sustainable transformations.

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

The project, Re-use of modernist buildings. RMB wants to initiate an educational framework of common definitions, approaches and methodologies on a European level. It is based on existing research, educational practices and reference projects in the program countries and associated states.Demographic and climate chance has resulted in huge qualitative and quantitative challenges and demands for th ...
Voir le projet

 6

 TERMINÉ 

PRACE 5th Implementation Phase Project (PRACE-5IP)

Date du début: 1 janv. 2017, Date de fin: 30 avr. 2019,

PRACE, the Partnership for Advanced Computing is the permanent pan-European High Performance Computing service providing world-class systems for world-class science. Systems at the highest performance level (Tier-0) are deployed by Germany, France, Italy and Spain providing researchers with over 11 billion core hours of compute time. HPC experts from 25 member states enabled users from academia an ...
Voir le projet

 30

 TERMINÉ 
Sewage sludge management is one of the most challenging waste issues in Environmental Engineering field due to their highly polluted nature and high volume. On the other hand, sewage sludge, which is also called as biosolids, can be a nutrient resource for the agri-foods which leads to their usage in agriculture as fertilizers. Usage of biosolids as fertilizer is the most desirable management stra ...
Voir le projet

 1

 TERMINÉ 

RepliCable and InnovaTive Future Efficient Districts and cities (CITYFIED)

Date du début: 1 avr. 2014, Date de fin: 31 mars 2019,

"CITyFiED project aims to develop a replicable, systemic and integrated strategy to adapt European cities and urban ecosystems into the smart city of the future, focusing on reducing the energy demand and GHG emissions and increasing the use of renewable energy sources by developing and implementing innovative technologies and methodologies for building renovation, smart grid and district heating ...
Voir le projet

 18

 TERMINÉ 

Welding of E-Textiles for Interactive Clothing (ETexWeld)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2018,

The new field of science dealing with implementation of electronics to textiles in combination with informatics is known as e-textiles. This project proposal leads to knowledge transfer among partners in order to develop innovative e-textile products for interactive protective clothing and footwear using welding technologies by bringing experts from different countries, sectors and disciplines tog ...
Voir le projet

 8

 TERMINÉ 

CASE-STUDY ALLIANCE TURKEY

Date du début: 1 sept. 2015, Date de fin: 31 août 2018,

The context of this project is the higher education in entrepreneurship, business and management in undergraduate major and minor, MBA, and Executive MBA levels. The primary objective of this project is to enhance the diffusion of the case teaching and case writing in emerging countries and economies to improve the quality and relevance of education, to create high quality learning opportunitie ...
Voir le projet

 5

 TERMINÉ 
This is a project for higher education student and staff mobility between Programme Countries and Partner Countries. Please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 
The main objective of this proposal is to develop new methods to retrieve sea ice parameters from existing (and imminent) satellite sensors to provide enhanced products for polar operators and prediction systems, specifically addressing extreme and unexpected conditions. Automatic remote sensing products traditionally provide general information on sea ice conditions such as ice extent and concent ...
Voir le projet

 14

 TERMINÉ 

COmbining Probable TRAjectories (COPTRA)

Date du début: 1 mars 2016, Date de fin: 28 févr. 2018,

SESAR implementation will result in an environment using extensive and intensive planning to address complexity imbalances and reduce potential conflicts. Accurate planning requires quantifying forecast accuracy at all planning horizons with the main challenge of combining trajectories with different levels of accuracy.A quality indicator giving the forecast accuracy could enhance the situation: I ...
Voir le projet

 5

 TERMINÉ 

Social Innovation: Driving Force of Social Change (SI-DRIVE)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2017,

SI-DRIVE extends knowledge about social innovation (SI) in three major directions:- Integrating theories and research methodologies to advance understanding of SI leading to a comprehensive new paradigm of innovation.- Undertaking European and global mapping of SI, thereby addressing different social, economic, cultural, historical and religious contexts in eight major world regions.- Ensuring rel ...
Voir le projet

 28

 TERMINÉ 
"Marine infrastructure plays a vital role in relation to energy, environment and sustainable development. Coastal and offshore structures built to protect coastal regions and to provide renewable energy, constitute a significant part of marine infrastructure in Europe. The need for such structures is expected to grow rapidly in the future due to increase in magnitude and frequency of storms, the a ...
Voir le projet

 1

 TERMINÉ 
The Contemporary Art world and market lack the basic information support and analytical tools that are widely available in similar environments and even for Pre-impressionist and Modern art. The huge amount of information (magazines, fairs, galleries etc.) available in various languages, creates chaos and is not summarised in any useful way which takes into account the different weight that phenom ...
Voir le projet

 5

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2016, Date de fin: 30 sept. 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 

Anatolian pLateau climatE and Tectonic hazards (ALErT)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2017,

ALErT: Anatolian pLateau climatE and Tectonic hazards, is a virtual campus of 10 European academic and 5 industry partners in the fields of applied Earth sciences, natural hazard monitoring, and knowledge transfer. Our research focus is on the tectonic and climatic boundary conditions along the densely populated margins of the Central Anatolian Plateau, Turkey and associated natural hazards. Due t ...
Voir le projet

 9

 TERMINÉ 
R2CITIES aims to develop and demonstrate an open and easily replicable strategy for designing, constructing, and managing large scale district renovation projects for achieving nearly zero energy cities. For this purpose, it will be developed a demonstration and dissemination framework of very innovative strategies and solutions for building energy renovation at district level, based in the follow ...
Voir le projet

 16

 TERMINÉ 

Multimodal Face Processing (MMFP)

Date du début: 1 juin 2013, Date de fin: 31 mai 2017,

"Faces play a central role in human communication. When interacting with someone, we use their face to identify them, to determine their gender, their emotional state and even their health. Automatic facial image interpretation involves developing algorithms, which can estimate such information from digital images and video. Such technology has a wide range of applications, including use in human- ...
Voir le projet

 1

 TERMINÉ 

PRACE 4th Implementation Phase Project (PRACE-4IP)

Date du début: 1 févr. 2015, Date de fin: 30 avr. 2017,

PRACE, the Partnership for Advanced Computing, was established in May 2010 as a permanent pan-European High Performance Computing service providing world-class systems for world-class science. Six systems at the highest performance level (Tier-0) are deployed by Germany, France, Italy and Spain providing researchers with over 9 billion core hours of compute time. HPC experts from twenty-five membe ...
Voir le projet

 27

 TERMINÉ 

Female Empowerment in Science and Technology Academia (FESTA)

Date du début: 1 févr. 2012, Date de fin: 31 janv. 2017,

"FESTA is concerned with implementing changes in the working environment of academic researchers, to encourage female researchers to stay and make a career in the academy and to create organizational environments where their competence is valued and fostered. In particular, we address the working environment of researchers in the lower levels of their careers, to make it possible for them to advan ...
Voir le projet

 8

 TERMINÉ 
...bon cities to address climate adaptation and urban environmental metabolism concerns by using a participatory city case study approach. Case study cities include Barcelona, Copenhagen/Malmö, Istanbul, Lisbon, Litomerice, Milan/Turin, Offenburg and Zagreb. These cities will develop qualitative post-carbon visions with local stakeholders. Visions will be chosen based on selected best-practice measur ...
Voir le projet

 13

 TERMINÉ 
...pants’ isolation feeling, and their encouragement (Denis V., et all 2004. Roles and Competencies of the e-tutor.) In this particular proposed plan, 20 adult’s instructors of the Governorship of Istanbul will take part. These instructors constitute the corpus of the adults instructors of our organization and they come from different scientific fields (economists, foreign language teachers, professo ...
Voir le projet

 5

 TERMINÉ 
NIOPLEX will contribute to the development of non-intrusive experimental flow diagnostics to improve the aerodynamic analysis capabilities in wind tunnels. The particular objective of the project is to develop an unprecedented comprehensive diagnostic approach, achieved by a simultaneous measurement of the surface pressure distribution on a model and the velocity and pressure field around it. Curr ...
Voir le projet

 9

 TERMINÉ 

Infrastructure for Analysis and Experimentation on Ecosystems (ANAEE)

Date du début: 1 nov. 2012, Date de fin: 31 oct. 2016,

ANAEE will provide Europe with a distributed and coordinated set of experimental, analytical and modelling platforms to analyse and predict in a precise manner the response of the main continental ecosystems to environmental and land use changes. ANAEE will consist of highly equipped in natura and in vitro experimental platforms associated with sophisticated analytical and modelling platforms coup ...
Voir le projet

 18

 TERMINÉ 
"Within the aeronautical industry it is critical to have safe and reliable operations in order to prevent accidents and mistakes which can potentially cause a huge loss of life and destruction. In this respect, the aeronautical industry has led the way in terms of understanding and implementing tools, methodologies and systems to combat human error within a system. One such principle which has bee ...
Voir le projet

 13

 TERMINÉ 

SEiSMiC, Societal Engagement in Science, Mutual learning in Cities (SEISMIC)

Date du début: 29 oct. 2013, Date de fin: 28 oct. 2016,

The European Research Area is targeting efforts in research and innovation on thecurrent challenges faced by society. These challenges are complex, multidimensional and require the engagement of different actors alongside researchers, particularly relating to integrated and sustainable urban development.In an effort to bridge the gap between the scientific community and society, SEiSMiC (Societal ...
Voir le projet

 13

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2015, Date de fin: 30 sept. 2016,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 

Enhancement of Skills in Retail

Date du début: 1 sept. 2014, Date de fin: 31 août 2016,

Recent research carried out in Turkey showed that the retail sector vocational training is limited to an average of 5 hours. On the one hand there are the companies where the staff trainings are exclusively well-done, with multiple sessions and effective methodology; on the other hand most of the companies organize the trainings orientation-like meetings. That creates a low profile for the retail ...
Voir le projet

 15

 TERMINÉ 
...ng the scope of potential applications. It will also enable a more connected/integrated approach to smart city applications development, which will be validated in realistic deployments in London and Istanbul. The partners will contribute and adapt a host of readily available urban infrastructures, IoT platforms and novel IoT applications, which will ease the accomplishment of the project's goals ...
Voir le projet

 10

 TERMINÉ 

PRACE - Third Implementation Phase Project (PRACE-3IP)

Date du début: 1 juil. 2012, Date de fin: 30 juin 2016,

PRACE-3IP supports the accelerated implementation of the pan-European HPC Research Infrastructure (RI) created in April 2010. It continues, complements, and extends the work of the PRACE-1IP and -2IP projects.PRACE-3IP addresses the computational and simulation needs of European scientific communities and of industry to keep them at the forefront of discovery. Our vision is the formation of an int ...
Voir le projet

 48

 TERMINÉ 
The recent devastating earthquakes and associated tsunamis in Japan, Indonesia, and Haiti, which killed more than half a million people, highlighted how mankind is still far away from a satisfactory level of seismic risk mitigation. Among the regions around the Mediterranean Sea for which earthquakes represent a major threat to their social and economic development, the area around the Marmara Se ...
Voir le projet

 21

 TERMINÉ 
The problems encountered in the industrial processing of oil and sugar are connected with corrosion, biochemical and/or biological reactions, friction, wear, and combined corrosion-wear of materials used in mechanical parts. The main concerns are on one hand a material degradation that generates risks of contamination during food production, and on the other hand the actual machinery that needs to ...
Voir le projet

 5

 TERMINÉ 

Mediterranean Air QUality In future climate Scenarios (MAQUIS)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2015,

The project “Mediterranean Air QUality In future climate Scenarios” (MAQUIS) will improve our understanding of air quality-climate interactions in a region of the world where significant climate changes are predicted to occur in the future. In particular we will characterize air quality in the eastern Mediterranean basin in current climate conditions and in future climate conditions; quantify the ...
Voir le projet

 1

 TERMINÉ 
2BFUNTEX will exploit the untapped potential in functional textile structures and textile related materials. It will bring together all innovation actors in the field fostering a multidisciplinary approach between universities, research institutes, SMEs (in textile 95% of the companies are SMEs) and sector associations. The 2BFUNTEX team will identify technological gaps and will eliminate barriers ...
Voir le projet

 28

 TERMINÉ 
The Air Transport in general and the Air Traffic Management system are formed by a high number of elements, human, organisational and technological, that interact with each other creating a unique system of intrinsic complexity. The variability of the initial conditions and the high number of potential scenarios makes the system performance particularly difficult to predict. As a consequence, the ...
Voir le projet

 7

 TERMINÉ 
"European oceans will be subject to massive development of marine infrastructure in the near future. The most obvious is the energy facilities e.g. offshore wind farms, exploitation of wave energy, expansion of electricity connections, and also further development and implementation of marine aquaculture. This will also lead to an increased need for marine infrastructure to support installation an ...
Voir le projet

 29

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2014, Date de fin: 30 sept. 2015,

During the academic year 2014-2015, ITU has taken part in Student Mobility including SMS and SMP as well as in Staff Mobility including STT and STA. The expected number for SMS was 393 students and the actual figure is 374. For SMP, 2014-2015 was the first year for ITU and while the expected number for traineeships was 7, the actual figure turned out to be 10 students. For that reason, as our SMP ...
Voir le projet

 1