Rechercher des projets européens

24 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Vision Inspired Driver Assistance Systems (VI-DAS)

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

Road accidents continue to be a major public safety concern. Human error is the main cause of accidents. Intelligent driver systems that can monitor the driver’s state and behaviour show promise for our collective safety. VI-DAS will progress the design of next-gen 720° connected ADAS (scene analysis, driver status). Advances in sensors, data fusion, machine learning and user feedback provide the ...
Voir le projet

 16

 TERMINÉ 

5G MiEdge: Millimeter-wave Edge cloud as an enabler for 5G ecosystem (5G MiEdge)

Date du début: 1 juil. 2016, Date de fin: 30 juin 2019,

Current research efforts on 5G Radio Access Networks (RAN) strongly focus on mmWave access to realize enhanced mobile broadband (eMBB) services. However, there are many unsolved issues to deploy mmW ave 5G RAN. The most critical issue is backhauling since it is infeasible to provide 10 Gigabit Ethernet backhaul everywhere. Meanwhile, Mobile Edge Computing (MEC) have obtained much attention in 5G n ...
Voir le projet

 5

 TERMINÉ 
FUTEBOL composes a federation of research infrastructure in Europe and Brazil, develops a supporting control framework, and conducts experimentation-based research in order to advance the state of telecommunications through the investigation of converged optical/wireless networks. Current wireless trends (cell densification, coordinated communication, massive MIMO) pose a new set of challenges tha ...
Voir le projet

 5

 TERMINÉ 
Understanding properties of nanoparticles (and in general of nano-functionalized materials) and how they behave in living systems is a relatively new area of scientific study. The scientific community has not yet been able to derive harmful properties of nanomaterials from the properties of the bulk material. So a precautionary approach is required when handling and using these materials in circum ...
Voir le projet

 15

 TERMINÉ 
Fortissimo 2 will drive the uptake of advanced modelling, simulation and data analytics by European engineering and manufacturing SMEs and mid-caps. Such an uptake will deliver improved design processes, better products and services, and improved competitiveness. For the European Union as a whole this means improved employment opportunities and economic growth.The importance of advanced ICT to the ...
Voir le projet

 38

 TERMINÉ 

Next Generation I/O for Exascale (NEXTGenIO)

Date du début: 1 oct. 2015, Date de fin: 30 sept. 2018,

The overall objective of the Next Generation I/O Project (NEXTGenIO) is to design and prototype a new, scalable, high-performance, energy efficient computing platform designed to address the challenge of delivering scalable I/O performance to applications at the Exascale. It will achieve this using highly innovative, non-volatile, dual in-line memory modules (NV-DIMMs). These hardware and systemwa ...
Voir le projet

 9

 TERMINÉ 
... reliable positioning subsystem. A good example of these new requirements can be witnessed in the increasing interest in navigation at lane-level, with applications such as enhanced driver awareness, intelligent speed alert and simple lane allocation. As well as the accuracy of positioning data being a big driver, there is also a question around the adaptability of navigation systems to these appl ...
Voir le projet

 10

 TERMINÉ 
The 5G CHAMPION project ambitions to deliver the first 5G system proof-of-concept in conjunction with the 2018 South Korean Winter Olympics. Key novel 5G building blocks will be developed and implemented into a new architectural approach providing an efficient end-to-end system performance encompassing cutting edge 5G radio-access, core-network and satellite technologies.It will be the first time ...
Voir le projet

 10

 TERMINÉ 
... The RealValue consortium is a truly cohesive partnership which has full participation and commitment from the whole energy supply chain. The consortium includes: technology developers (Glen Dimplex, Intel); energy system modelling specialists (UCD, DIW, RTU); energy market specialists (VTT); socio-economic experts (Oxford University); electricity network operators (ESBN, EirGrid) and energy utili ...
Voir le projet

 12

 TERMINÉ 
The objective of SPEED-5G is to research and develop technologies that address the well-known challenges of predicted growth in mobile connections and traffic volume. A major challenge is the cost of meeting the objective, in terms of both infrastructure and deployment. Today, lack of dynamic control across wireless network resources is leading to unbalanced spectrum loads and a perceived capacit ...
Voir le projet

 10

 TERMINÉ 
The overall objective of Flex5Gware is to deliver highly reconfigurable hardware (HW) platforms together with HW-agnostic software (SW) platforms targeting both network elements and devices and taking into account increased capacity, reduced energy footprint, as well as scalability and modularity, to enable a smooth transition from 4G mobile wireless systems to 5G.As it will be argued in the propo ...
Voir le projet

 19

 TERMINÉ 
... users, supporting UHD/3D streaming, immersive applications and ultra-responsive cloud services.The consortium brings together major infrastructure vendors (Samsung, Ericsson, Alcatel-Lucent, Huawei, Intel, Nokia), major European operators (Orange, Telefonica), leading research institutes and universities (Fraunhofer HHI Institute, CEA-LETI, IMDEA Networks, Universities Aalto, Bristol, Chalmers an ...
Voir le projet

 19

 TERMINÉ 
Key objectives of METIS-II are to develop the overall 5G radio access network design and to provide the technical enablers needed for an efficient integration and use of the various 5G technologies and components currently developed. The innovation pillars that will allow METIS-II to achieve this goal are • a holistic spectrum management architecture addressing the spectrum crunch, • an air interf ...
Voir le projet

 24

 TERMINÉ 
5G will have to cope with a high degree of heterogeneity in terms of: (a) services (mobile broadband, massive machine and mission critical communications, broad-/multicast services and vehicular communications); (b) device classes (low-end sensors to high-end tablets); (c) deployment types (macro and small cells); (d) environments (low-density to ultra-dense urban); (e) mobility levels (static to ...
Voir le projet

 18

 TERMINÉ 

DEEP Extended Reach (DEEP-ER)

Date du début: 1 oct. 2013, Date de fin: 31 mars 2017,

... more applications increasing scientific throughput, and the loss of computational work through system failures will be substantially reduced.DEEP-ER will build a prototype with the second generation Intel® Xeon Phi processor, a uniform high-speed interconnect across Cluster and Booster, non-volatile memory on the compute nodes, and network attached memory providing high-speed shared memory access ...
Voir le projet

 17

 TERMINÉ 
Flexible spectrum usage is a promising enabler of spectral efficiency for next generation wireless broadband networks. In order to deliver the next order of magnitude gains in terms of overall spectral and radio efficiency envisioned for 2020, wireless access will have to be revisited both from a policy as well as from a technology innovation perspective. On the policy side, with the emergence of ...
Voir le projet

 8

 TERMINÉ 

Tomorrow's Elastic, Adaptive Mobility (TEAM)

Date du début: 1 nov. 2012, Date de fin: 31 oct. 2016,

TEAM aims at developing systems for participants in transportation networks, which help them to behave better – by explicitly taking into account the needs and constraints of other participants and the network itself. Focus will be placed upon decision-making in a time interval, above what is commonly associated with reactive safety (typically less than 5 seconds) and below long-term planning appl ...
Voir le projet

 27

 TERMINÉ 

Millimetre-wave Evolution for Backhaul and Access (MiWEBA)

Date du début: 1 juin 2013, Date de fin: 31 mai 2016,

Due to the popularization of smart phones and tablets in recent years, the traffic of data on conventional networks are predicted to be increased by 1000 times in the next 10 years. To face the severe issue of system capacity shortage due to the increasing data traffic in cellular networks, standardization on heterogeneous networks with overlay deployment of low-power base stations in the service ...
Voir le projet

 5

 TERMINÉ 

FI-WARE: Future Internet Core Platform (FI-WARE)

Date du début: 1 mai 2011, Date de fin: 31 déc. 2014,

The goal of the FI-WARE project is to advance the global competitiveness of the EU economy by introducing an innovative infrastructure for cost-effective creation and delivery of services, providing high QoS and security guarantees. FI-WARE is designed to meet the demands of key market stakeholders across many different sectors, e.g., healthcare, telecommunications, and environmental services. FI- ...
Voir le projet

 92

 TERMINÉ 

Reduced Certification Costs for Trusted Multi-core Platforms (RECOMP)

Date du début: 1 avr. 2010, Date de fin: 31 mars 2013,

"The proposed RECOMP (Reduced certification cost for trusted multi-core platforms) research project will establish methods, tools and platforms for enabling cost-efficient certification and re-certification of safety-critical systems and mixed-criticality systems, i.e. systems containing safety-critical and non-safety-critical components.RECOMP recognizes the fact that the increasing processing po ...
Voir le projet

 40

 TERMINÉ 
The MADNESS project aims at the definition of innovative system-level design methodologies for embedded systems, able to drive the optimal composition of an heterogeneous MPSoC architecture, according to the requirements and the features of a given target application field.The proposed methodologies will extend the classic concept of design space exploration, to cope with high heterogeneity, techn ...
Voir le projet

 9

 TERMINÉ 
Due to the need of supporting diversified services with vastly expanded use of wireless access, the Future Internet will set the networks under stress for resources. This motivates the quest for efficiency, through technologies that achieve: (i) higher utilization of resources; (ii) lower transmission powers and energy consumption (decisions with "green" footprint); (iii) reductions in the total c ...
Voir le projet

 12

 TERMINÉ 

Nanoscale Silicon-Aware Network-on-Chip Design Platform (NaNoC)

Date du début: 1 janv. 2010, Date de fin: 31 déc. 2012,

Description The objective of this project is to develop an innovative network-on-chip oriented design platform constituting a toolkit for the construction of NoC-based multi-core systems in nanoscale technologies The NaNoC project aims at developing an innovative design platform for future Network ...
Voir le projet

 8

 TERMINÉ 

COmpact MOdelling Network (COMON) (COMON)

Date du début: 1 déc. 2008, Date de fin: 30 nov. 2012,

"The goal of our Network is to address the full development chain of Compact Modeling (CM) of advanced CMOS and III-V technologies, from the technology level to the system level. Our mission is driven by the need to enhance scientific knowledge, transfer scientific and technological knowledge from academia to industry, to strengthen the European integrated circuit (IC) industry with powerful desi ...
Voir le projet

 16