Rechercher des projets européens

13 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Flexible FE/BE Sensor Pilot Line for the Internet of Everything (IoSense)

Date du début: 1 mai 2016, Date de fin: 30 avr. 2019,

The EU has set the stage to empower semiconductor manufacturing in Europe being one of the key drivers for innovation and employment and creator for answers to the challenges of the modern society. Aim of IoSense is to boost the European competitiveness of ECS industries by increasing the pilot production capacity and improving Time-to-Market for innovative microelectronics, accomplished by establ ...
Voir le projet

 33

 TERMINÉ 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Voir le projet

 101

 TERMINÉ 

Arrowhead (ARROWHEAD)

Date du début: 1 mars 2013, Date de fin: 28 févr. 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Voir le projet

 87

 TERMINÉ 

Dependable Embedded Wireless Infrastructure (DEWI)

Date du début: 1 mars 2014, Date de fin: 28 févr. 2017,

DEWI (dependable embedded wireless infrastructure) envisions to significantly foster Europe’s leading position in embedded wireless systems and smart (mobile) environments such as vehicles, railway cars, airplanes and buildings. These environments comprise wireless sensor networks and wireless applications for citizens and professional users. Therefore the consortium introduces the concept of a “s ...
Voir le projet

 61

 TERMINÉ 
HoliDes addresses development and qualification of Adaptive Cooperative Human-Machine Sys-tems (AdCoS) where many humans and many machines act together, cooperatively, in a highly adaptive way. They adapt to each other and to the context to guarantee fluent and cooperative task achievement. Such systems with higher levels of automation are urgently needed to enhance safety and to increase the conf ...
Voir le projet

 32

 TERMINÉ 

ETCS Advanced Testing and Smart Train Positioning System (EATS)

Date du début: 1 oct. 2012, Date de fin: 31 mars 2016,

Currently European Train Control System (ETCS) rollout is a major concern for the railway sector. Equipment for ETCS level 1 and 2 typically follows a long process before being put into service due to interpretation variations in the specification and certification procedures requiring long and expensive field-testing. On the other hand, migration from ETCS level 2 to 3 has not been yet foreseen d ...
Voir le projet

 9

 TERMINÉ 

Community Based Comprehensive Recovery (COBACORE)

Date du début: 1 avr. 2013, Date de fin: 31 mars 2016,

The Community Based Comprehensive Recovery (COBACORE) project aims to support common needs assessment and recovery planning efforts in complex multi-sectorial, multi-stakeholder crisis environments by building upon the community as an important source of information and capabilities. COBACORE aims to help bridge the so-called collaboration gap: failure of collaboration through insufficient informa ...
Voir le projet

 9

 TERMINÉ 

Integrated Components for Assisted Rescue and Unmanned Search operations (ICARUS)

Date du début: 1 févr. 2012, Date de fin: 31 janv. 2016,

"Recent dramatic events such as the earthquakes in Haiti and L’Aquila or the flooding in Pakistan have shown that local civil authorities and emergency services have difficulties with adequately managing crises. The result is that these crises lead to major disruption of the whole local society. The goal of ICARUS is to decrease the total cost (both in human lives and in €) of a major crisis. In o ...
Voir le projet

 29

 TERMINÉ 
"ICT-based service and product innovation is curtailed by the growing vertical chain of dependence on poorly interoperable proprietary technologies in Europe. This issue was identified to have high impact on European innovation productivity by the Report of the Independent Expert Group on R&D and Innovation, commonly known as the Aho-report. The report demanded incentives for the convergence of sh ...
Voir le projet

 28

 TERMINÉ 
Large scale societal challenges require large scale monitoring and control solutions. Technological developments will make it possible to design and build these large systems. A major obstacle in realizing these systems is the lack of a versatile methodology to design and implement adaptive monitoring and control systems taking into account intrinsic properties of system of systems (decentralizati ...
Voir le projet

 26

 TERMINÉ 

Pro-active decision support for data-intensive environments (ASTUTE)

Date du début: 1 mars 2011, Date de fin: 31 mai 2014,

"ASTUTE aims at defining reference architecture for the development of HMIs, targeting proactive information retrieval and delivery based on situational context, as well influenced by information content and services, and user state information. This architecture will support the user intentions, optimizing the choices available to the user, while keeping the user in control of the situation. Veri ...
Voir le projet

 22

 TERMINÉ 

Wireless Smart Distributed end System for Aircraft (WILDCRAFT)

Date du début: 1 oct. 2012, Date de fin: 31 mai 2014,

"WILDCRAFT proposes the design, development and testing of a proof-of-concept demonstrator of a Wireless Sensor Network (WSN) aimed at applications in the aerospace industry. The continuous pressure on aircraft manufacturers to produce better and more secure aircrafts has led to increasing costs in maintenance and monitoring procedures that are being performed at given time intervals to assess the ...
Voir le projet

 3

 TERMINÉ 

Reduced Certification Costs for Trusted Multi-core Platforms (RECOMP)

Date du début: 1 avr. 2010, Date de fin: 31 mars 2013,

"The proposed RECOMP (Reduced certification cost for trusted multi-core platforms) research project will establish methods, tools and platforms for enabling cost-efficient certification and re-certification of safety-critical systems and mixed-criticality systems, i.e. systems containing safety-critical and non-safety-critical components.RECOMP recognizes the fact that the increasing processing po ...
Voir le projet

 40