Rechercher des projets européens

26 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Analysis System for Gathered Raw Data (ASGARD)

Date du début: 1 sept. 2016, Date de fin: 29 févr. 2020,

ASGARD has a singular goal, contribute to Law Enforcement Agencies Technological Autonomy and effective use of technology. Technologies will be transferred to end users under an open source scheme focusing on Forensics, Intelligence and Foresight (Intelligence led prevention and anticipation). ASGARD will drive progress in the processing of seized data, availability of massive amounts of data and ...
Voir le projet

 34

 TERMINÉ 

Advanced Low Flying Aircrafts Detection and Tracking (ALFA)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

The last decades witnessed the ever growing effectiveness of Europe-subsidized border protection projects like SIVE and SIVICC. As maritime smuggling from Morocco towards the European borders of Portugal and Spain was combatted more effectively, the criminal modus operandi changed drastically, approaching air routes with cheap and small planes. New drone technology opens opportunity to both manned ...
Voir le projet

 9

 TERMINÉ 

Remotely Operated CBRNe Scene Assessment Forensic Examination (ROCSAFE)

Date du début: 1 juil. 2016, Date de fin: 30 juin 2019,

The overall goal of ROCSAFE is to fundamentally change how CBRNe events are assessed, in order to and ensure the safety of crime scene investigators by reducing the need for them to enter high-risk scenes when they have to determine the nature of threats and gather forensics. For this, ROCSAFE will make use of cost-effective modern remotely-controlled robotic air and ground vehicles (RAVs/RGVs) th ...
Voir le projet

 14

 TERMINÉ 
Starting from previous research experiences and tangible outcomes, STORM proposes a set of novel predictive models and improved non-invasive and non-destructive methods of survey and diagnosis, for effective prediction of environmental changes and for revealing threats and conditions that could damage cultural heritage sites. Moreover, STORM will determine how different vulnerable materials, struc ...
Voir le projet

 20

 TERMINÉ 

TRusted, CItizen - LEA coILaboratIon over sOcial Networks (TRILLION)

Date du début: 1 sept. 2015, Date de fin: 31 août 2018,

Community policing promotes the implementation of bi-directional collaboration channels between citizens and Law Enforcement Agencies (LEAs). By enhancing the discovery of relevant and up to date information, it speeds up the detection of risks, eases their prevention and builds a continuum of collaboration which motivates citizens and LEAs to work together.Over 36 months, TRILLION - TRusted, CIti ...
Voir le projet

 13

 TERMINÉ 
Large scale crises are affecting critical infrastructures with a growing frequency. This is a result of both basic exposure and dependencies between infrastructures. Because of prohibitive costs, the paradigm of protection against extreme events is expanding and now also encompasses the paradigm of resilience. In addition to strengthening and securing systems; system design objectives are now bein ...
Voir le projet

 12

 TERMINÉ 

Speaker Identification Integrated Project (SIIP)

Date du début: 1 mai 2014, Date de fin: 30 avr. 2018,

SIIP is a break-through Suspect Identification solution based on a novel Speaker-Identification (SID) engine fusing multiple speech analytic algorithms (e.g. voiceprints recognition, Gender/Age/Language/Accent ID, Keyword/ Taxonomy spotting and Voice cloning detection). This Fused Speaker Identification will result in significantly higher true-positive speaker identification, reduced False-Positiv ...
Voir le projet

 20

 TERMINÉ 

European Conferences on Networks and Communications (EuCNC) (EuConNeCts 2)

Date du début: 1 mars 2015, Date de fin: 31 août 2017,

It is the purpose of EuConNeCts 2, a Supporting Action, to organise the following 2 editions, 2016 and 2017, of the EC sponsored conference in the area of communication networks and systems (EuCNC - European Conference on Networks and Communications). EuCNC will serve as a technical and scientific conference for researchers, namely European ones, to show their work in the area of Telecommunicatio ...
Voir le projet

 4

 TERMINÉ 
Energy efficiency becomes crucial for rational consumption of the available resources and reduction of the CO2 production. But the reduction of energy consumption as the only remedy is only a partial solution. Similar, applying more environment-neutral or renewable energy sources without smart management systems may even cause failures in the energy grid or at least cause the energy to be wasted. ...
Voir le projet

 12

 TERMINÉ 

European Control System Security Incident Analysis Network (ECOSSIAN)

Date du début: 1 juin 2014, Date de fin: 31 mai 2017,

The protection of critical infrastructures increasingly demands solutions which support incident detection and management at the levels of individual CI, across CIs which are depending on each other, and across borders. An approach is required which really integrates functionalities across all these levels. Cooperation of privately operated CIs and public bodies (governments and EU) is difficult b ...
Voir le projet

 22

 TERMINÉ 

Development of the CYBER crime and CYBER terrorism reseach ROADmap (CYBERROAD)

Date du début: 1 juin 2014, Date de fin: 31 mai 2016,

This project will identify current and future issues in the fight against Cyber crime and cyber terrorism in order to draw a roadmap for cyber security research. A detailed snapshot of the technological, social, economic, political, and legal scenario on which cyber crime and cyber terrorism do develop will be first provided. Then, cyber crime and cyber terrorism will be studied, in order to inde ...
Voir le projet

 22

 TERMINÉ 

HANDHold - HANDHeld OLfactory Detector (HANDHOLD)

Date du début: 1 avr. 2012, Date de fin: 31 mars 2016,

"While the dog will remain a central part of the detection process at border crossing and airports, sensor technology and low power embedded system computing are improving to the extent that the time is right to develop substantially improved mobile detection devices that can complement the role played by dogs. Moreover, these detection devices can be networked together to provide enhanced detecti ...
Voir le projet

 9

 TERMINÉ 

AIRBorne information for Emergency situation Awareness and Monitoring (AIRBEAM)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2015,

The AIRBEAM project proposes a situation awareness toolbox for the management of crisis over wide area taking benefit of an optimised set of aerial (unmanned) platforms, including satellites.The number of unmanned air- and space-borne platform available and their associated sensors present a new set of challenges to end users involved in the effective management of emergencies and actions of law e ...
Voir le projet

 24

 TERMINÉ 

Network of Excellence in Wireless COMmunications # (NEWCOM#)

Date du début: 1 nov. 2012, Date de fin: 31 oct. 2015,

NEWCOM# is a Network of Excellence (NoE) proposal submitted in response to challenge FP7-ICT-2011-8 1.1, "Future Networks". A group of 14 partners in 14 different countries (12 of which come from the former FP7 NoE NEWCOM++) decided to capitalize on the high degree of integration in research they already at-tained to build an NoE with the following objectives: i) to produce medium to long term res ...
Voir le projet

 18

 TERMINÉ 

European Conferences on Networks and Communications (EuCNC) (EuConNeCts)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2015,

It is the purpose of EuConNeCts, a Supporting Action, to organise the following 2 editions, 2014 and 2015, of the EC sponsored conference in the area of communication networks and systems. The conference will be named EuCNC - European Conference on Networks and Communications. EuCNC will serve as a technical and scientific conference for researchers, namely European ones, to show their work in t ...
Voir le projet

 5

 TERMINÉ 
PERSEUS contributes to Europe’s efforts to monitor illegal migration and combat related crime and goods smuggling by proposing a large scale demonstration of a EU Maritime surveillance System of Systems, on the basis of existing national systems and platforms, enhancing them with innovative capabilities and moving beyond EUROSUR’s 2013 expectations, addressing key challenges: supporting the netwo ...
Voir le projet

 35

 TERMINÉ 

Secured Urban Transportation - European Demonstration (SECUR-ED)

Date du début: 1 avr. 2011, Date de fin: 30 sept. 2014,

"SECUR-ED Project federates, with a delegated management and in a balanced manner, major operators and top industrial integrators to enhance the security of urban public transportation in medium and large cities, through live demonstrations.Based on the best practices, in a very diverse societal and legacy environment, SECUR-ED will aggregate a consistent and interoperable mix of technologies and ...
Voir le projet

 44

 TERMINÉ 

Total Airport Security System (TASS)

Date du début: 1 avr. 2010, Date de fin: 31 mars 2014,

"TASS is a multi-segment, multi-level intelligence and surveillance system, aimed at creating an entire airport security monitoring solution providing real-time accurate situational awareness to airport authorities.The TASS concept is based on integrating different types of selected real time sensors & sub-systems for data collection in a variety of modes, including fixed and mobile, all suitable ...
Voir le projet

 22

 TERMINÉ 

NANO/MICRO INTEGRATION IN MICROMANUFACTURING (NANOMICRO)

Date du début: 1 janv. 2010, Date de fin: 31 déc. 2013,

The new high productive platform for 3D main objective of NANOMICRO project is to provide the manufacturing industry with an entirely nanomicromanufacturing platform, by way of a new micron scale resolution and an innovative direct parallel-deposition process. The process will be able to deliver a layer wise manufacturing approach using highly focalized powder/heat fluxes, with dimensions in the ...
Voir le projet

 12

 TERMINÉ 

Socially Aware, collaboRative, scAlable Coding mEdia distributioN (SARACEN)

Date du début: 1 janv. 2010, Date de fin: 31 mars 2013,

The rapid progress in hardware/software media technologies has changed the role of individuals from passive content consumers to active content creator/producers. It is clear that in a few years everyone will be multimedia content producer (by publishing digital pictures, video recordings, remote e-health services, home surveillance, etc.), multimedia content mediator (by storing/forwarding strea ...
Voir le projet

 10

 TERMINÉ 

Simple Procedures Online for Crossborder Services (SPOCS)

Date du début: 1 mai 2009, Date de fin: 31 déc. 2012,

Description A European project to ease the administrative burden of businessesSimple Procedures Online for Cross-border Services (SPOCS) is a pilot project launched by the European Commission which aims to remove the administrative barriers European businesses face in offering their services abroad. SPOCS is expected to further enhance th ...
Voir le projet

 33

 TERMINÉ 

Wireless Sensor Networks for the Protection of Critical Infrastructures (WSAN4CIP)

Date du début: 1 janv. 2009, Date de fin: 31 déc. 2011,

The goal of WSAN4CIP is to substantially advance the technology of Wireless Sensor and Actuator Networks (WSANs) beyond the current state of the art and to apply this technology to the Protection of Critical Infrastructures. In particular, the WSAN4CIP project will apply these advanced wireless and sensor network developments to the management of power generation and distribution infrastructure ma ...
Voir le projet

 12

 TERMINÉ 

Integrated Airport Apron Safety Fleet Management (AAS)

Date du début: 1 mai 2008, Date de fin: 30 avr. 2011,

One of the main challenges in the apron area is that due to many different companies operating on an airport apron, each company brings in the vehicles and equipment it requires to sustain operation. This causes high levels of congestion in ramp areas, which increases the accident rate and the chances of vehicles and equipment being misused. By gaining telematic data on the running times of the va ...
Voir le projet

 14

 TERMINÉ 
The main idea of My-e-Director is to research and develop a unique interactive broadcasting service enabling end-users to select focal actors and points of interest within real-time broadcasted scenes. The service will resemble an automated ambient intelligent director that will operate with minimal or even without human intervention. Contrary to state-of-the art services of similar nature that fo ...
Voir le projet

 7

 TERMINÉ 
The project aims a seamless connectivity and inter-working of embedded localisation and communication systems through a new platform – the LocON Platform. To maintain large infrastructures like airports more efficient, flexible, secure and easier is the main impact – thus LocON is targeting the following objectives:•\tto integrate a hardware/software platform including the middleware for heteroge ...
Voir le projet

 9

 TERMINÉ 

Waste Water Treatment Improvement and Efficiency in Small Communities (WWTREAT)

Date du début: 1 oct. 2004, Date de fin: 31 oct. 2007,

Background Small wastewater plants can present problems due to poor performance arising from inadequate design, treatment and control; uncontrolled discharge of pollutants into public water systems; lack of training for operators; unmanned nocturnal plant operations; plant locations in inappropriate sites; and lack of information for water consumers. How ...
Voir le projet

 6