Rechercher des projets européens

33 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Ensuring the Integrity of the European food chain (FOODINTEGRITY)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2018,

Food Integrity “the state of being whole, entire, or undiminished or in perfect condition”.Providing assurance to consumers and other stakeholders about the safety, authenticity and quality of European food (integrity) is of prime importance in adding value to the European Agri-food economy. The integrity of European foods is under constant threat from fraudulently labelled imitations that try to ...
Voir le projet

 64

 TERMINÉ 

Online Network TraffIc Characterization (ONTIC)

Date du début: 1 févr. 2014, Date de fin: 31 janv. 2017,

Accurate identification and categorization of network traffic is a crucial task in many network management and engineering activities, such as QoS evaluation, capacity planning and attack detection. Terabytes of data may be transferred through the core network of a typical ISP every day, and an exponential growth in traffic is expected in the short-term, with more than 50 billions of Internet-conn ...
Voir le projet

 7

 TERMINÉ 

Board and SoC Test Instrumentation for Ageing and No Failure Found (BASTION)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2016,

Today, an average family spends annually over 50 Euros on No-Failure-Found (NFF) investigations - a known problem of an unknown origin. Tomorrow, the electronic engine control system in a car will be dying after two-three years of operation due to CMOS ageing. Actions are urgently needed!A group of European experts will unite their forces in BASTION to fight against ageing and NFF issues. The proj ...
Voir le projet

 8

 TERMINÉ 

Advanced Software Protection: Integration, Research and Exploitation (ASPIRE)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2016,

Traditional security solutions based on custom hardware like smart cards, set-top boxes, and dongles, are not convenient on mobile devices like smartphones and tablets. Software protection is therefore utterly important; it can be a maker and breaker in domains like multi-screen mobile TV, software licensing, and credentials and sensitive data stored on mobile devices. However, current software pr ...
Voir le projet

 8

 TERMINÉ 

Cross-Layer Early Reliability Evaluation for the Computing cOntinuum (CLERECO)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2016,

Advanced multi-functional computing systems realized in forthcoming manufacturing technologies hold the promise of a significant increase in device integration density complemented by an increase in system performance and functionality. However, a dramatic reduction in single device quality and reliability is also expected.CLERECO research project recognizes early accurate reliability evaluation a ...
Voir le projet

 11

 TERMINÉ 

SECURity at the network EDge (SECURED)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2016,

Protection of mobile devices from Internet threats is usually achieved by installing appropriate tools (e.g. anti-virus, personal firewall, parental control) on each device. However, this poses several issues: it requires privileged access on the device, appropriate protection tools may not exist on all the platforms or their capabilities may vary greatly across the different devices, and tools ma ...
Voir le projet

 8

 TERMINÉ 

District Information Modeling and Management for Energy Reduction (DIMMER)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2016,

ICT is recognized as being a key player against climate change: pervasive sensors and actuators can efficiently control the whole energy chain (Smart Thermal/Electricity Grid). On the other side, advances on 3D modeling, visualization and interaction technologies enable user profiling and real-time feedback to promote energy efficient behaviors. To unlock the potentiality of these technologies, th ...
Voir le projet

 15

 TERMINÉ 
Description CONTREX (Design of embedded mixed-criticality CONTRol systems under consideration of EXtra-functional properties)Abstract – Up to now mission & safety critical services of Systems of Systems (SoS) have been running on dedicated and often custom designed Hardware/Software platforms. In the near future such systems will be accessib ...
Voir le projet

 15

 TERMINÉ 

The Human Brain Project (HBP)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2016,

Understanding the human brain is one of the greatest challenges facing 21st century science. If we can rise to the challenge, we can gain profound insights into what makes us human, develop new treatments for brain diseases and build revolutionary new computing technologies. Today, for the first time, modern ICT has brought these goals within sight. The goal of the Human Brain Project, part of the ...
Voir le projet

 116

 TERMINÉ 

CLoud approach for Innovation in Public Services (CLIPS)

Date du début: 1 févr. 2014, Date de fin: 31 juil. 2016,

The CLIPS project aims at introducing a new approach to deliver innovative public services, through the cloud-computing approach involving the community in the process (PPPP public-private-people-partnership). The main idea of CLIPS is to provide to the community a methodology and a toolkit which allow civil servants and other external stakeholders (both citizens and businesses) to co-operate in ...
Voir le projet

 13

 TERMINÉ 

Open Access Policy Alignment STrategies for European Union Research (PASTEUR4OA)

Date du début: 1 févr. 2014, Date de fin: 31 juil. 2016,

PASTEUR4OA will support the aim of encouraging the development of matching policies on open access and open data in the European Union according to the European Commission’s recent Recommendation on“Access to and preservation of scientific information” (July 2012) and in view of maximizing alignment with the Horizon 2020 policy on access to the research funded by the Commission. The project will h ...
Voir le projet

 15

 TERMINÉ 

Shared Standards for Open Data and Public Sector Information (Share-PSI 2.0)

Date du début: 1 févr. 2014, Date de fin: 31 juil. 2016,

Share-PSI 2.0 brings together a critical mass of government agencies and organisations responsible for implementing the new PSI Directive. Lead by the W3C, the consortium includes the Open Group and Open Geospatial Consortium as fellow standards bodies plus the PSI Alliance, Open Knowledge Foundation, Open Data Institute and PwC as the primary contractor in the ISA Programme's work on interoperabi ...
Voir le projet

 42

 TERMINÉ 
The current maintenance policies, including e.g. RCM (Reliability Centred Maintenance) and TPM (Total Productive Maintenance), can be generally useful in answering questions such as “how much maintenance should be done on this machine?” “How frequently should this part be replaced?” “How many spare parts should be kept in stock?” “How should the shutdown be scheduled?” It is generally accepted tha ...
Voir le projet

 14

 TERMINÉ 

Unifying Cloud and Carrier Networks (UNIFY)

Date du début: 1 nov. 2013, Date de fin: 30 avr. 2016,

Telecom providers struggle with low service flexibility, increasing complexity and related costs. Although cloud computing and networking have been two very active fields of research, there is currently little integration between the vast networking assets and data centres of telecom providers. UNIFY addresses this by considering the entire network, from home networks up to data centre, as a "unif ...
Voir le projet

 16

 TERMINÉ 

Low-energy and Reliable reconfigurable processing systems (LORELEI)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2015,

This proposal deals with electronic embedded systems, i.e., with electronic systems which have been designed to perform a dedicated task.These systems must match specific constraints demanded by the targeted application, and may include cost, performance, real-time capabilities, volume, weight, and power. The last parameter emerged as a crucial one in the last decade, not only because of the incre ...
Voir le projet

 2

 TERMINÉ 

Openly Accessible Services and Interacting Society (OASIS)

Date du début: 1 févr. 2012, Date de fin: 31 oct. 2015,

In many regions of Europe, citizens and businesses are faced with the difficulty or impossibility of finding information and services provided by local public authorities on the internet. Any such information currently available is often segmented and isolated in a non-user friendly manner. The current project will facilitate access to information, public services and economic promotion by groupin ...
Voir le projet

 15

 TERMINÉ 

Secure idenTity acrOss boRders linKed 2.0 (STORK 2.0)

Date du début: 1 avr. 2012, Date de fin: 30 sept. 2015,

"Secure idenTity acrOss boRders linKed 2.0" builds on the success and results of STORK by taking further steps to decisively push the lines for wider uptake of eID in Europe, aiming at realising a single European electronic identification & authentication area. Its highly innovative focus lies on the convergence of private and public sectors in an operational framework and infrastructure encompass ...
Voir le projet

 65

 TERMINÉ 
READY4SmartCities operates in a European context where other initiatives are currently running in order to create a common approach on Smart Cities, Such initiatives, even if of fundamental importance for the EU, have some relevant gaps not allowing them to fully cover fundamental aspects for Smart Cities, i.e. to define a common data framework allowing full interoperability among different city s ...
Voir le projet

 11

 TERMINÉ 

Verification and Testing to Support Functional Safety Standards (VeTeSS)

Date du début: 1 mai 2012, Date de fin: 30 avr. 2015,

New safety standards, such as ISO 26262, present a challenge for companies producing safety-relevant embedded systems. Safety verification today is often ad-hoc and manual; it is done differently for digital and analogue, hardware and software.The VeTeSS project will develop standardized tools and methods for verification of the robustness of safety-relevant systems, particularly against transient ...
Voir le projet

 26

 TERMINÉ 

SMArt systems Co-design (SMAC)

Date du début: 1 oct. 2011, Date de fin: 31 mars 2015,

Smart systems consist of heterogeneous subsystems and components providing different functionalities; they are normally implemented as "Multi-Package on a Board". To fully exploit the potential of current nanoelectronics technologies, as well as to enable the integration of existing/new IPs and "More than Moore" devices, smart system miniaturization and "Multi-Chip in a Package" implementation are ...
Voir le projet

 18

 TERMINÉ 
The existing building stock in European countries accounts for over 40% of final energy consumption in the European Union (EU) member states, of which residential use represents 63% of total energy consumption in the buildings sector. In this scenario, the EcoThermo proposal will address specific needs and will pursue challenges in order to introduce breakthrough technologies into the market.The E ...
Voir le projet

 10

 TERMINÉ 

FI-WARE: Future Internet Core Platform (FI-WARE)

Date du début: 1 mai 2011, Date de fin: 31 déc. 2014,

The goal of the FI-WARE project is to advance the global competitiveness of the EU economy by introducing an innovative infrastructure for cost-effective creation and delivery of services, providing high QoS and security guarantees. FI-WARE is designed to meet the demands of key market stakeholders across many different sectors, e.g., healthcare, telecommunications, and environmental services. FI- ...
Voir le projet

 92

 TERMINÉ 

Legal Aspects of Public Sector Information 2.0 (LAPSI 2.0)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2014,

The objective of the LAPSI 2.0 thematic network is to identify the remaining legal barriers and obstacles to access and re-use of public sector information (PSI) on the European content market, and to provide measures and tools to overcome or reduce these barriers and to stimulate the progress of the European market towards open data. LAPSI 2.0 brings together academic experts with stakeholders f ...
Voir le projet

 22

 TERMINÉ 

Led-based intelligent street lighting for energy saving (LITES)

Date du début: 1 déc. 2009, Date de fin: 30 nov. 2014,

The main objective of the LITES project is to demonstrate in real life experimentation that intelligent street lighting using solid-state lights LED drastically reduces energy consumption. The lighting service delivered is compliant with road classes CE2-CE5, S- and A- according to the standard of EN13201. That means that our device can be installed in secondary street, commercial access, allotmen ...
Voir le projet

 6

 TERMINÉ 

Internet of Energy for Electric Mobility (IoE)

Date du début: 1 mai 2011, Date de fin: 31 oct. 2014,

The objective of Internet of Energy (IoE) is to develop hardware, software and middleware for seamless, secure connectivity and interoperability achieved by connecting the Internet with the energy grids. The application of the IoE will be the infrastructure for the electric mobility. The underlying architecture is of distributed Embedded Systems (ESs), combining power electronics, integrated circu ...
Voir le projet

 43

 TERMINÉ 
Recent trends in embedded system architectures brought a rapid shift towards multicore, heterogeneous and reconfigurable platforms. This makes chip design enormously complex and imposes a large effort for the programmers to develop their applications. For this reason, new and more efficient tools for software development are needed to ensure software productivity and time to market of new applica ...
Voir le projet

 8

 TERMINÉ 

Secure Web OS Application Delivery Environment (webinos)

Date du début: 1 sept. 2010, Date de fin: 31 déc. 2013,

The webinos project will define and deliver an Open Source Platform and specific components for the Future Internet, which will enable web applications and services to be used and shared consistently and securely over a broad spectrum of converged and connected devices, including mobile, PC, home media (TV) and in-car units. Promoting a "single service for every device" vision, webinos will move t ...
Voir le projet

 23

 TERMINÉ 

Bayesian Biometrics For Forensics (BBfor2)

Date du début: 1 janv. 2010, Date de fin: 31 déc. 2013,

With various forms of biometric technologies becoming available, there is a growing need for scientists who are able to assess the merits of these technologies when applied to forensics. The Marie Curie ITN `Bayesian Biometrics for Forensics,' or BBfor2, will provide a training infrastructure that will educate Early Stage Researchers in the core biometric technologies of speaker, face and fingerpr ...
Voir le projet

 9

 TERMINÉ 
Protecting critical infrastructures providing communications, energy, or healthcare presents increasing ICT challenges as ICT itself has become vital to them. Internet-scale ICT infrastructures ("infrastructure clouds") promise scalable virtualised computing, network, and storage resources over the Internet. They provide scalability and cost-efficiency but pose significant new privacy and resilien ...
Voir le projet

 16

 TERMINÉ 

Virtual Campus Hub

Date du début: 1 oct. 2011, Date de fin: 30 sept. 2013,

Description Virtual Campus Hub (VCH)Higher education and industrial innovation are challenged by today's fast development in the natural sciences, engineering, technology, and economy, underpinned by the dramatic advances in information technology. Education in universities and their effort in innovation haven’t really adjusted to this trend ...
Voir le projet

 4

 TERMINÉ 
The main objective of the COMPLEX project is to increase the competitiveness of the European semiconductor, system integrator and EDA industry by addressing the problem of platform-based design space exploration under consideration of power and performance constraints early in the design process. High performance usually causes high power consumption. A main challenge in today's embedded system de ...
Voir le projet

 15

 TERMINÉ 

Thematic Network on Legal Aspects of Public Sector Information (LAPSI)

Date du début: 22 mars 2010, Date de fin: 31 août 2012,

Information generated and collected by public sector entities represents a veritable minefield; it might make a much greater contribution to EU economies and societies, if current legal barriers to access and re-user were removed. The LAPSI project will deal both with established PSI areas (geographic, land register data, etc.) as well as novel areas (cultural data from archives, libraries, scien ...
Voir le projet

 20

 TERMINÉ 
Le projet se propose de systématiser et de promouvoir l'utilisation des archives cadastrales pour la gestion des écosystemes et le développement durable des territoires transfrontaliers. Achievements: Etudes d'applicationRecherche scientifiqueGuide pratique d'interpréta ...
Voir le projet

 6