Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
To handle the unprecedented demand for mobile data traffic, different vendors, operators and research programmes have aimed to develop radio access technologies (RATs) that boost physical-layer link capacity, utilize millimeter wave radio, or further densify network topology. Notable steps have also been made towards shifting baseband processing from the (currently) ultra dense network edge to a c ...
Voir le projet

 10

 TERMINÉ 
The continuously growing need for higher data-rates and, therefore, more signal bandwidth in wireless communications, requires the use of multi-antenna base stations employing the recently introduced massive Multiple-Input-Multiple-Output (MIMO) concept and operating at millimeter-wave frequencies, e.g. 30 GHz. However, the implementation of such complex antenna systems into highly-integrated, ene ...
Voir le projet

 6

 TERMINÉ 
The main objective of the ANASTACIA is to address the constant discovery of vulnerabilities in ICT components providing assurance that ICT systems are secure and trustworthy by design. To this end, ANASTACIA will research and develop a holistic security framework, which will address all the phases of the ICT Systems Development Lifecycle and will be able to take autonomous decisions using new netw ...
Voir le projet

 14

 TERMINÉ 

Renewables in a Stable Electric Grid (RE-SERVE)

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2019,

Future energy systems will use renewable energy sources to minimise CO2 emissions. Currently large generators powered by fossil fuel turbines maintain the stability and quality of energy supplies through their inertia. The inertia of these generator-turbine groups gives providers a significant time window in which to react to network events. We urgently need to find ways to stabilise energy sys ...
Voir le projet

 11

 TERMINÉ 

Complex and Open Innovation for Networked Society (COINS)

Date du début: 1 oct. 2015, Date de fin: 30 sept. 2019,

...ble of finding solutions for some of the greatest challenges facing our planet. The COINS objectives will be achieved by establishing a long-term partnership between the University of Leeds and Ericsson AB. They are joined by technology start-up Diamentech.
Voir le projet

 2

 TERMINÉ 
Information access on the Internet is exploding. Usage is shifting to multimedia applications, social networking and IoE. Cellular networks are moving to the next generation. Networking technology is shifting towards virtualization, with SDN and NFV likely to change the infrastructure landscape. The cloud concept is transforming the Internet to a network of data centers, with a communication model ...
Voir le projet

 7

 TERMINÉ 

A network slice for every service (5GPagoda)

Date du début: 1 juil. 2016, Date de fin: 30 juin 2019,

5G!Pagoda represents the next evolution step in softwarized networks as supported by NFV, SDN and aimed at by the 5G network evolution. The top objectives of 5G!Pagoda are i) the development of a scalable 5G slicing architecture towards supporting specialized network slices composed on multi-vendor network functions, through the development of ii) a scalable network slice management and orchestrat ...
Voir le projet

 7

 TERMINÉ 
The fifth-generation (5G) is coming.Quo vadis 5G?What architectures, network topologies and technologies will define it?Are methodologies to the analysis, design and optimization of current cellular networks still applicable to 5G? 5Gwireless is the first integrated and multi-disciplinary training-through-research network of ESRs and Senior Supervisors fully committed to re-architecting current ce ...
Voir le projet

 10

 TERMINÉ 

High density scalable optically interconnected Tb/s Board (Teraboard)

Date du début: 1 déc. 2015, Date de fin: 30 nov. 2018,

Optical communications are becoming always more relevant because of the continuous growth of the requiested bandwidth. In the last decade we assisted a continuous growing of transport and metro netwotks, presently the bottleneck is in the processing of the huge amount of data constituted by the growing number of users, the capacity of the content that is exchanged and the convergence of Telecom an ...
Voir le projet

 10

 TERMINÉ 
Living in a safe and secure society is a fundamental human need. The security of critical infrastructures must be maintained so that supplies of power, water or other resources are secured. Modern critical infrastructures are increasingly complex and they are turning into Cyber-Physical Infrastructures because ICT is growing in importance in infrastructure management.The SUCCESS project will dev ...
Voir le projet

 19

 TERMINÉ 

5G Exchange (5GEx)

Date du début: 1 oct. 2015, Date de fin: 31 mars 2018,

The goal of the 5G Exchange (5GEx) project is to enable cross-domain orchestration of services over multiple administrations or over multi-domain single administrations. This will allow end-to-end network and service elements to mix in multi-vendor, heterogeneous technology and resource environments. Market fragmentation has resulted in a multitude of network operators each focused on different co ...
Voir le projet

 20

 TERMINÉ 

Graphene-based disruptive technologies (GrapheneCore1)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Voir le projet

 158

 TERMINÉ 
...d internet access to mobile communication devices in urban environment. The key technology end-user driving the primary prototype development and demonstration of a complete THz communication link is Ericsson. A secondary prototype developed in M3TERA is on a multi-function adaptive THz sensor platform for different millimeter-wave sensing applications in society, including food quality control an ...
Voir le projet

 8

 TERMINÉ 
SoftFIRE+ partners are aiming at Research and Innovation actions pursuing the integration of existing experimental facilities, testbeds and laboratories into FIRE+. The project focuses on new technologies like SDN and NFV in order to create a reliable, secure, interoperable and programmable experimental network infrastructure within the FIRE+ initiative. The Consortium will federate existing exper ...
Voir le projet

 8

 TERMINÉ 

THINGS2DO (THINGS2D0)

Date du début: 1 janv. 2014, Date de fin: 1 janv. 2018,

Develop the FDSOI ecosystem in Europe, beyond the PLACES2BE Pilot Line, in order to increase the impact of this European technology. At the time of set up of the first KET pilot line the proof of FDSOI was mainly technological. In between then and now, the first realization of a complex silicon chip in FDSOI has shown to the worldwide microelectronics community the capabilities of this technology. ...
Voir le projet

 44

 TERMINÉ 

5G-Crosshaul: The 5G Integrated fronthaul/backhaul (5G-Crosshaul)

Date du début: 1 juil. 2015, Date de fin: 31 déc. 2017,

Mobile data traffic is forecasted to increase 11-fold between 2013 and 2018. 5G networks serving this mobile data tsunami will require fronthaul and backhaul solutions between the RAN and the packet core capable of dealing with this increased traffic load while fulfilling new stringent 5G service requirements in a cost-efficient manner.The 5G-Crosshaul project aims at developing a 5G integrated ba ...
Voir le projet

 21

 TERMINÉ 

Large-scale RINA benchmark on FIRE (ARCFIRE)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2017,

ARCFIRE will bring RINA from labs into the real-world. RINA, the Recursive InterNetwork Architecture, is an innovative “back-to-basics” network architecture that solves current limitations and facilitates full integration between distributed computing and networking. RINA addresses the challenges that drive the communications industry in moving from dedicated hardware to almost completely virtuali ...
Voir le projet

 8

 TERMINÉ 

In-Network Programmability for next-generation personal cloUd service supporT (INPUT)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2017,

The INPUT Project aims at designing a novel infrastructure and paradigm to support Future Internet personal cloud services in a more scalable and sustainable way and with innovative added-value capabilities. The INPUT technologies will enable next-generation cloud applications to go beyond classical service models, and even to replace physical Smart Devices, usually placed in users’ homes (e.g., s ...
Voir le projet

 9

 TERMINÉ 

5G Enablers for Network and System Security and Resilience (5G-ENSURE)

Date du début: 1 nov. 2015, Date de fin: 31 oct. 2017,

5G-ENSURE will define and deliver a 5G Security Architecture, shared and agreed by the various 5G stakeholders. It will specify, develop and release an initial set of useful and usable security enablers for 5G. These enablers will be selected for their relevance in addressing some of the foremost security concerns in order to generate the trust and confidence necessary for 5G to be widely adopted ...
Voir le projet

 16

 TERMINÉ 

Training network on tRAcking in compleX sensor systems (TRAX)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2017,

...mplex Sensor Systems, covering interdisciplinary and intersectoral aspects in this newly emerging supra-disciplinary field. The TRAX consortium comprises two large companies (Thales Nederland B.V., Ericsson A.B.); two SMEs (Rinicom Limited, Xsens Technologies B.V.); a research institute ( Fraunhofer) and three universities (University of Lancaster, Linköping University and University of Twente); a ...
Voir le projet

 8

 TERMINÉ 
SATORI is a 45-month project, comprising 17 partners from 13 countries, including an intergovernmental organisation, the aim of which is to improve respect of ethics principles and laws in research and innovation, and to make sure that they are adequately adapted to the evolution of technologies and societal concerns. The partners will develop an ethics assessment framework based on thorough analy ...
Voir le projet

 19

 TERMINÉ 
...ty for 13 ESRs and one ER in a network comprising seven partners and nine associate partners. The METRICS network comprises four strong academic partners (Aalto, UC3M, UCAM, UCL), three vendors (NEC, Ericsson, Narus), four ISPs (BT, TID, IIJ, Elisa), two operators of global measurement infrastructures (SamKnows, RIPE), and three partners for business education (EOI, IE, Principae). It thus offers ...
Voir le projet

 7

 TERMINÉ 
Key objectives of METIS-II are to develop the overall 5G radio access network design and to provide the technical enablers needed for an efficient integration and use of the various 5G technologies and components currently developed. The innovation pillars that will allow METIS-II to achieve this goal are • a holistic spectrum management architecture addressing the spectrum crunch, • an air interf ...
Voir le projet

 24

 TERMINÉ 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Voir le projet

 101

 TERMINÉ 
...bile broadband services for mobile users, supporting UHD/3D streaming, immersive applications and ultra-responsive cloud services.The consortium brings together major infrastructure vendors (Samsung, Ericsson, Alcatel-Lucent, Huawei, Intel, Nokia), major European operators (Orange, Telefonica), leading research institutes and universities (Fraunhofer HHI Institute, CEA-LETI, IMDEA Networks, Univer ...
Voir le projet

 19

 TERMINÉ 
The overall objective of Flex5Gware is to deliver highly reconfigurable hardware (HW) platforms together with HW-agnostic software (SW) platforms targeting both network elements and devices and taking into account increased capacity, reduced energy footprint, as well as scalability and modularity, to enable a smooth transition from 4G mobile wireless systems to 5G.As it will be argued in the propo ...
Voir le projet

 19

 TERMINÉ 
...seen. The thermal energy (waste heat) of the system can be applied for heating purposes as well as for cooling applying, e.g. an absorption cooling system. The system demonstration will take place at Ericsson as a real TLC site
Voir le projet

 8

 TERMINÉ 

Multi-level integration for patients with complex needs (CAREWELL)

Date du début: 1 févr. 2014, Date de fin: 31 janv. 2017,

Description CareWell will enable the delivery of integrated healthcare to frail elderly patients in a pilot setting through comprehensive multidisciplinary integrated care programmes where the role of ICTs can foster the coordination and patient centered delivery care. Carewell will focus in particular complex, multi-morbid elderly patients, ...
Voir le projet

 14

 TERMINÉ 

Online Network TraffIc Characterization (ONTIC)

Date du début: 1 févr. 2014, Date de fin: 31 janv. 2017,

Accurate identification and categorization of network traffic is a crucial task in many network management and engineering activities, such as QoS evaluation, capacity planning and attack detection. Terabytes of data may be transferred through the core network of a typical ISP every day, and an exponential growth in traffic is expected in the short-term, with more than 50 billions of Internet-conn ...
Voir le projet

 7

 TERMINÉ 

Integrated Reconfigurable silicon photonic based optical Switch (IRIS)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2016,

...$) and overall device volume a factor of 60 smaller (only a few cubic centimetres). IRIS is strongly oriented toward industrialization as it is led by a major European telecom equipment manufacturer (Ericsson) and participated by a major European Silicon manufacturing company (STMicroelectronics), already committed to the industrialization of Silicon Photonics.
Voir le projet

 8

 TERMINÉ 

Virtual Registry of the (under – on – above) GrOund Infrastructures (VIRGO)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2016,

At the moment European countries are not obliged to have a (virtual) registry of infrastructures, however public administrations, private or public enterprises and citizens feel the need of knowing how the various infrastructures are placed and managed and which are the relative responsabilities and properties as the lack of a single and common registry generates conflicts of competence between op ...
Voir le projet

 12

 TERMINÉ 

MAssive MiMO for Efficient Transmission (MAMMOET)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2016,

The Internet of the future will to a large extent rely on mobile networks. Mobile data grew with 70% in 2012 and is predicted to grow 13-fold in the next 5 years. This puts very high demands on the development of mobile access technology. MAMMOET will advance the development of Massive MIMO (MaMi), a new and most promising direction in mobile access. MaMi makes a clean break with current technolog ...
Voir le projet

 8

 TERMINÉ 
Description The Challenge:The advent of cloud applications and the proliferation of mobile devices have imposed a dramatic increase of the IP traffic. The emerging ZetaByte Era forces operators to seek a cost-efficient way of upgrading their network in order to accommodate the vast amount of data without compromising QoS and wasting bandwidt ...
Voir le projet

 7

 TERMINÉ 

eWall for Active Long Living (eWALL)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2016,

Description eWALL will be an affordable, easy-to-install prefabricated wall that can be mounted on an existing wall and includes all the ICT needed to enable a number of services for the senior citizen to cover major challenges in Active and Healthy Ageing. The project will carry out high-risk and multi-disciplinary research and will have a ...
Voir le projet

 14

 TERMINÉ 

Scaffolding Scalable Software Services (S-CASE)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2016,

The goal of S-CASE is to accelerate the software development lifecycle for cloud services by introducing a new agile prototyping paradigm that automates the process of mapping user requirements to concrete software specifications and generates operational code (RESTful services). S-CASE aspires to support software developers in identifying software requirements and business processes in various fo ...
Voir le projet

 9

 TERMINÉ 

COnnected Media and Presence from European Institute of Technology (COMPEIT)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2016,

Description COMPEIT creates interactive, personalised, shared media experiences on the Internet for feeling more present when interacting remotely with other people and enjoying media together.Internet-based distribution will transform media broadcasting towards higher levels of interactivity and integration with virtual, mixed and augmen ...
Voir le projet

 7

 TERMINÉ 

A BLUEPRINT of Haematopoietic Epigenomes (BLUEPRINT)

Date du début: 1 oct. 2011, Date de fin: 30 sept. 2016,

In response to the call for a high impact initiative on the human epigenome, the BLUEPRINT Consortium has been formed with the aim of generating at least 100 reference epigenomes and studying them to advance and exploit knowledge of the underlying biological processes and mechanisms in health and disease. BLUEPRINT will focus on distinct types of haematopoietic cells from healthy individuals and o ...
Voir le projet

 45

 TERMINÉ 

COnvergence of fixed and Mobile BrOadband access/aggregation networks (COMBO)

Date du début: 1 janv. 2013, Date de fin: 30 sept. 2016,

Fixed and mobile networks have been subjects to significant technological and architectural evolutions in the past years, with e.g. deployments of 4G mobile networks and FTTH fixed networks, as well as significant increase in traffic demand and access bandwidth both in fixed and mobile access networks. All these network evolutions lead to enormous investments in independent network infrastructures ...
Voir le projet

 20

 TERMINÉ 
An increasing number of cities have started to introduce new ICT enabled services. However, the uptake of smart city applications is hindered by various issues, such as the difficulty of integrating heterogeneous data sources and the challenge of extracting up-to-date information in real-time from large-scale dynamic data. Today the challenges are often addressed by application specific solutions ...
Voir le projet

 10

 TERMINÉ 

Adressing Energy in Parallel Technologies (ADEPT)

Date du début: 1 sept. 2013, Date de fin: 31 août 2016,

The ADEPT project will address the challenge of energy-efficient use of parallel technologies. ADEPT will build on the expertise of software developers from high-performance computing (HPC) to exploit parallelism for performance, and on the expertise of Embedded systems engineers in managing energy usage. ADEPT will develop a tool that will guide software developers and help them to model and pred ...
Voir le projet

 5