Rechercher des projets européens

25 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

REnaissance of Places with Innovative Citizenship and TEchnolgy (REPLICATE)

Date du début: 1 févr. 2016, Date de fin: 31 janv. 2021,

The objective of REPLICATE is to demonstrate Smart City technologies in energy, transport and ICT in districts in San Sebastia, Florence and Bristol addressing urban complexity and generate replication plans in other districts and in follower cities of Essen,Nilufer and Lausanne.Main challenges for cities are to increase the overall energy efficiency, to exploit better local resources in terms of ...
Voir le projet

 37

 TERMINÉ 
RESCCUE aims to deliver a framework enabling city resilience assessment, planning and management by integrating into software tools new knowledge related to the detailed water-centred modelling of strategic urban services performance into a comprehensive resilience platform. These tools will assess urban resilience from a multisectorial approach, for current and future climate change scenarios and ...
Voir le projet

 18

 TERMINÉ 

GrowSmarter

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2019,

GrowSmarter aims to:• Improve the quality of life for European citizens by better mobility, housing and the quality of urban infrastructure while improving the citizens economy by lower energy costs and creating as much as 1500 new jobs (on the demonstration level).• Reduce the environmental impact by lower energy needs by 60 % and increased use of renewable energy thus reducing GHG emissions eve ...
Voir le projet

 41

 TERMINÉ 
MATChING goal is the reduction of cooling water demand in the energy sector through innovative technological solutions, to be demonstrated in thermal and geothermal power plants. The project targets include an overall saving of water withdrawal of 30% in thermal power generation, and a decrease of evaporative losses up to 15% in geothermal sector. The use of advanced and nano-technology based mate ...
Voir le projet

 17

 TERMINÉ 
Four major Distribution System Operators (in Italy, France, Spain and Sweden) with smart metering infrastructure in place, associated with electricity retailers, aggregators, software providers, research organizations and one large consumer, propose five large-scale demonstrations to show that the deployment of novel services in the electricity retail markets (ranging from advanced monitoring to l ...
Voir le projet

 21

 TERMINÉ 
The project SmartNet aims at providing architectures for optimized interaction between TSOs and DSOs in managing the exchange of information for monitoring and for the acquisition of ancillary services (reserve and balancing, voltage regulation, congestion management) both at national level and in a cross-border context. Local needs for ancillary services in distribution systems are supposed to co ...
Voir le projet

 22

 TERMINÉ 

Peer to Peer Smart Energy Distribution Networks (P2P-SmartTest) (P2P-SmarTest)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2017,

P2P-SmartTest project investigates and demonstrates a smarter electricity distribution system integrated with advanced ICT, regional markets and innovative business models. It will employ Peer-to-Peer (P2P) approaches to ensure the integration of demand side flexibility and the optimum operation of DER and other resources within the network while maintaining second-to-second power balance and the ...
Voir le projet

 9

 TERMINÉ 

Zero Emission bUs Systems (ZEEUS)

Date du début: 1 nov. 2013, Date de fin: 30 avr. 2017,

Electrification of the public transport is a raising trend in Europe, and electric buses are soon expected to enter markets as one of the most interesting options for matching urban environmental targets. Electrification is driven by both economics and politics. However, although technology is not yet fully matured and ready for wide commercialisation, a large demonstration project will facilitat ...
Voir le projet

 41

 TERMINÉ 
DAREED aims at delivering an ICT service platform (and some specific tools) to foster energy efficiency and low carbon activities at neighbourhood, city and district level. Project results will be validated via pilots in three (3) different countries and contexts, thus granting the possibility to generalise results and ensuring replicability throughout Europe and beyond.The key success factor for ...
Voir le projet

 14

 TERMINÉ 

INternet Cleantech ENablers Spark (INCENSe)

Date du début: 1 sept. 2014, Date de fin: 31 août 2016,

...CCELERACE), which have decided to share their knowledge to rapidly connect to existing communities of innovative SMEs and WEs. This knowledge is complemented with the industrial vision of the sector, ENDESA, the link with FI-PPP Programme assured by ENEL participation in the FINSENY project, and the FUNDINGBOX's experience in public funding procurement and on-line social tools. The complementary s ...
Voir le projet

 5

 TERMINÉ 

Optimization of Oxygen-based CFBC Technology with CO2 capture (O2GEN)

Date du début: 18 oct. 2012, Date de fin: 17 oct. 2015,

... caused by CCS. The project is going to deals with this challenge.The project technical leaders are Foster Wheeler Energia Oy and Air Liquide, the demonstration facility is CIUDEN and the utility is Endesa Generación.
Voir le projet

 12

 TERMINÉ 
The intelligent and cost effective use of CCS technologies requires new strategies to increase the net efficiency of coal fired power plants. Among them, the most promising are summarised as below:- Increase working steam temperature and pressure in new USC power plants (350-370 bar, 700/720°C minimum), and hence increase the severity of fireside operating conditions,- Promote clean coal technolog ...
Voir le projet

 26

 TERMINÉ 

Wireless charging for Electic Vehicles (UNPLUGGED)

Date du début: 1 oct. 2012, Date de fin: 31 mars 2015,

UNPLUGGED project aims to investigate how the use of inductive charging of Electric Vehicles (EV) in urban environments improves the convenience and sustainability of car-based mobility. In particular, it will be investigated how smart inductive charging infrastructure can facilitate full EV integration in the urban road systems while improving customer acceptance and perceived practicality. UNPLU ...
Voir le projet

 17

 TERMINÉ 
Green eMotion aims at enabling mass deployment of electromobility in Europe. To achieve this, major players from industry, the energy sector, municipalities as well as universities and research institutions have joined forces to develop and demonstrate a commonly accepted and user-friendly framework consisting of interoperable and scalable technical solutions in connection with a sustainable busin ...
Voir le projet

 44

 TERMINÉ 

Electricity Demand and Supply Harmonizing for EVs (e-DASH)

Date du début: 1 sept. 2011, Date de fin: 30 nov. 2014,

The sustainable integration of the electric vehicles requires an intelligent charging system for the real-time\nexchange of charge related data between FEVs and the grid in order to allow the management of:\n• high-current fast-charging for large numbers of FEVs in a brand-independent way\n• price-adaptive charging/reverse-charging at optimum price for the customer\n• the real-time grid balancing ...
Voir le projet

 15

 TERMINÉ 
"The project aims at developing a unique device for electricity networks: A superconducting fault current limiter (SFCL) based on coated conductor YBCO tape (cc-tape) or 2nd Generation HTS tape. The general trend in Europe to a higher meshing of distribution networks and the rapid growing integration of renewable energy sources leads to an increase of the fault current level by every new installat ...
Voir le projet

 16

 TERMINÉ 
EnergyTIC is a demonstration project that will put into practice innovative ICT solutions available in two different countries, France and Spain, with a common goal: providing the end-users with an easy to understand / intuitive solution allowing him to monitor and adapt its energy and water consumptionTechnical solution: Comprehensive convergent ICT solutions will be implemented in 1700 dwellings ...
Voir le projet

 14

 TERMINÉ 
This project is aiming at the scaling-up of one of the most promising concepts for CO2 capture from coal power plants: postcombustion carbonate looping systems. This project focuses on the experimental pilot testing and scaling up of the process at scales in the 1 MW range. The 1 Mw carbonate looping pilot will be built in the Hunosa 50 Mwe CFB coal power plant of “La Pereda”, using a side stream ...
Voir le projet

 8

 TERMINÉ 
For E.V.s, the development of an interactive electric energy ICT & Service interface between the vehicle and its electricity infrastructure is of utmost importance, next to creating effective business models.The rationale of this project is to contribute significantly to neutralize the driver's "range anxiety" and encourage the customers to embark the fully electric road transport.Therefore the ob ...
Voir le projet

 12

 TERMINÉ 
This project combines the CFB’s intrinsic advantages (fuel flexibility and low emissions) with oxygen-firing for carbon capture and storage (CCS). In oxygen-firing systems the fuel is burned in a mixture of pure O2 and recirculated flue gas instead of air. The absence of air nitrogen produces a flue gas stream with a high concentration of CO2, making it much easier to separate the CO2. CFB technol ...
Voir le projet

 13

 TERMINÉ 
COMET aims at identifying and assessing the most cost effective CO2 transport and storage infrastructure able to serve the West Mediterranean area, namely Portugal, Spain and Morocco. This is achieved considering the time and spatial aspects of the development of the energy sector and other industrial activities in those countries as well as the location, capacity and availability of potential CO2 ...
Voir le projet

 18

 TERMINÉ 
"Electric and plug-in hybrid vehicles (EV, PHEV) have the potential to contribute significantly to solving contemporary and future environmental and economic challenges of mobility. Various projects in different EU member states are currently addressing the subject in an isolated manner. The G4V consortium consisting of major European electric utilities and distinguished academic institutions are ...
Voir le projet

 14

 TERMINÉ 

Open Public Extended Network metering (OPEN meter)

Date du début: 1 janv. 2009, Date de fin: 30 juin 2011,

New smart multi-metering or multi-functional Advanced Metering Infrastructure (AMI) is capable of creating value for energy consumers, network operators, metering operators and retailers. AMI will provide better services for customers in various ways: not only by more accurate metering and billing, but also by easing the supplier switching process and also by facilitating demand response to price ...
Voir le projet

 20

 TERMINÉ 
...ead electric power line network to the conservation needs of 16 SPAs in the region. The main actions would involve establishing agreements with the main electricity companies – Erz Endesa and REE (Red Eléctrica de España) and with private owners – for the introduction of corrective measures on some 350 km of power lines (994 pylons) to avoid electrocution and collision risks to threatened bi ...
Voir le projet

 3

 TERMINÉ 
Background The Egyptian vulture (Neophron percnopterus), known in the Canaries as "guirre", is suffering a decline in its European distribution range that is particularly acute in Spain, Portugal, Greece and Southern France. In Spain, the species has declined by some 70% over the past two decades. However, some 80% of the European population is still foun ...
Voir le projet

 3