Rechercher des projets européens

20 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
...l. space data), free software & data processing tools, to develop new applications.FabSpace 2.0 will provide a new free-access service and place dedicated to collaborative data-driven innovation in 6 European universities (13 at the end of the project). Through online support, entrepreneurship & innovation leadership trainings for students and researchers, the human capital among FabSpace users wi ...
Voir le projet

 16

 TERMINÉ 
... basin, which are characterized by highly variable river flows and the occurrence of low flows. This has resulted in increases in frequency and magnitude of extreme flow events. Furthermore, in other European regions such as eastern Germany, western Poland and England, water demand exceeds water availability and water scarcity has become an important management issue. Water scarcity is most common ...
Voir le projet

 27

 TERMINÉ 

The European Open Science Cloud for Research Pilot Project. (EOSCpilot)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2018,

The EOSCpilot project will support the first phase in the development of the European Open Science Cloud (EOSC) as described in the EC Communication on European Cloud Initiatives [2016]. • It will establish the governance framework for the EOSC and contribute to the development of European open science policy and best practice; • It will develop a number of pilots that integrate service ...
Voir le projet

 39

 TERMINÉ 
Today’s driver assistance systems offer comfort and safety in sound environmental conditions. However, in harsh environment conditions – when needed most – systems stop working due to reduced sensor information quality. Targeting to the area of highly automated driving the improvement of perception, decision and planning under adverse conditions is one of the main challenges to be addressed. Robus ...
Voir le projet

 15

 TERMINÉ 

5G Exchange (5GEx)

Date du début: 1 oct. 2015, Date de fin: 31 mars 2018,

...tructure services will provide a crucial role in making 5G happen as they provide the foundation of all cloud and networking services. 5GEx aims to enable, through operator collaboration, a unified European infrastructure service market integrating multiple operators and technologies, where service provisioning is fast and automated and which results in stronger economy via economies of scale.
Voir le projet

 20

 TERMINÉ 
The exponential growth of mobile traffic, drastically increasing of network complexity, and the strong need for inter-network coordination of wireless network resources call for breakthroughs in control, coordination and flexible spectrum management in 5G heterogeneous radio access networks. The COHERENT project aims to address these problems by researching, developing and validating a novel cont ...
Voir le projet

 14

 TERMINÉ 

Automated Driving Applications and Technologies for Intelligent Vehicles (AdaptIVe)

Date du début: 1 janv. 2014, Date de fin: 30 juin 2017,

...xamine the need for corresponding changes in regulation.By demonstrating these results, AdaptIVe will significantly improve the knowledge base for automated driving and strengthen the position of European industries in the area of Intelligent Vehicles and road safety.
Voir le projet

 32

 TERMINÉ 

Computational Cloud Services and Workflows for Agile Engineering (CloudFlow)

Date du début: 1 juil. 2013, Date de fin: 31 déc. 2016,

Traditionally, the European manufacturing industry is characterized by innovative technology, quality processes and robust products which have leveraged Europe's industrialization. However, globalization has exposed Europe's industry to new emerging and industrialized manufacturing markets and the current economic challenges have decelerated the internal boost and investment, respectively. Hence, ...
Voir le projet

 29

 TERMINÉ 

Tomorrow's Elastic, Adaptive Mobility (TEAM)

Date du début: 1 nov. 2012, Date de fin: 31 oct. 2016,

...emonstration: The success of the project will be demonstrated via innovative leading-edge cooperative applications and a Europe-wide mobility experiment to illustrate the systems' benefits in a pan-European setting.
Voir le projet

 27

 TERMINÉ 

FEderated Test-beds for Large-scale Infrastructure eXperiments (FELIX-EU)

Date du début: 1 avr. 2013, Date de fin: 30 juin 2016,

...ough high capacity NSI-enabled networks (e.g. JGN-X, GéANT, GLIF or NRENs), offering the creation of the experimental landscape in a dynamic and seamless way in order to satisfy demanding needs of European and Japanese research communities. The on-demand setup of OpenFlow-based network slices, including compute and storage resources, will be realized through an extended-NSI, the OGF standard for p ...
Voir le projet

 6

 TERMINÉ 

Unifying Cloud and Carrier Networks (UNIFY)

Date du début: 1 nov. 2013, Date de fin: 30 avr. 2016,

Telecom providers struggle with low service flexibility, increasing complexity and related costs. Although cloud computing and networking have been two very active fields of research, there is currently little integration between the vast networking assets and data centres of telecom providers. UNIFY addresses this by considering the entire network, from home networks up to data centre, as a "unif ...
Voir le projet

 16

 TERMINÉ 

efficient Cooperative infrastructure for Fully Electric Vehicles (eCo-FEV)

Date du début: 1 sept. 2012, Date de fin: 31 mai 2015,

This project will be carried out within the FP7 Work Programme 2011 COOPERATION of the European Commission addressing the objective GC-ICT-2011.6.8 ICT for fully electric vehicles. In particular, the project aims at fulfilling the specific targeted outcome f): Integration of the FEV in the cooperative transport infrastructure. It proposes will develop an integrated IT platform that enables the con ...
Voir le projet

 14

 TERMINÉ 
...ilities, by using e Infrastructure (distributed computing and storage resources linked by high-performance networks).The 48 month EGI-InSPIRE project will continue the transition to a sustainable pan-European e-Infrastructure started in EGEE-III. It will sustain support for Grids of high-performance and high-throughput computing resources, while seeking to integrate new Distributed Computing Infra ...
Voir le projet

 143

 TERMINÉ 
The objective of the DRIVE C2X Integrated Project is to carry out comprehensive assessment of cooperative systems through Field Operational Tests in various places in Europe in order to verify their benefits and to pave the way for market implementation. This general objective is split into four major technical objectives:\n•Create a harmonised Europe-wide testing environment for cooperative syste ...
Voir le projet

 36

 TERMINÉ 

interactIVe

Date du début: 1 janv. 2010, Date de fin: 30 nov. 2013,

...ers, and research institutes.By demonstrating these results, interactIVe will significantly enhance the feasibility and attractiveness of next-generation safety systems, strengthening the position of European industries in the area of Intelligent Vehicles and e-Safety.
Voir le projet

 32

 TERMINÉ 

Open Flow in Europe: Linking Infrastructure and Applications (OFELIA)

Date du début: 1 sept. 2010, Date de fin: 31 oct. 2013,

The aim of the OFELIA project is to create a unique experimental facility that allows researchers to not only experiment 'on' a test network but to control the network itself precisely and dynamically. To achieve this, the OFELIA facility is based on OpenFlow, a currently emerging networking technology that allows to virtualize and control the network environment through secure and standardized in ...
Voir le projet

 18

 TERMINÉ 

Split architecture carrier class future networks (SPARC)

Date du début: 1 juil. 2010, Date de fin: 30 sept. 2012,

The project SPARC "Split architecture carrier grade networks" is aimed at the investigation and implementation of a new split in the architecture of the Future Internet and its building blocks. The design of the new architecture will focus on the split of control, forwarding and data processing elements. The objective of the Split Architecture is a modularisation of logical and physical functional ...
Voir le projet

 6

 TERMINÉ 
The Intelligent Car Initiative has identified road safety, energy efficiency, and traffic congestion as the main challenges currently being faced by European transportation. Despite their severity, these issues may be improved with the use of new in-vehicle technologies currently not available in the market. However, implementing new technologies implies a risk to manufacturers. Factors such as di ...
Voir le projet

 35

 TERMINÉ 

Pan-European Laboratory Infrastructure Implementation (PII)

Date du début: 1 juin 2008, Date de fin: 31 mars 2011,

...tners constitute a highly competent, well-balanced consortium of SMEs, associations, academic institutions as well as large manufacturers and network operators, to mobilise the critical mass at European level to achieve the project objectives.
Voir le projet

 22

 TERMINÉ 

PRE-DRIVE

Date du début: 1 juil. 2008, Date de fin: 30 sept. 2010,

Based on the overall description of a common European architecture for an inter-vehicle and vehicle-to-infrastructure communication system PRE-DRIVE C2X shall develop a detailed system specification and a working as well as functionally verified prototype. It will be robust enough to be used in future field operational trials of cooperative systems. Furthermore PRE-DRIVE C2X shall develop an integ ...
Voir le projet

 27