Rechercher des projets européens

22 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

REnaissance of Places with Innovative Citizenship and TEchnolgy (REPLICATE)

Date du début: 1 févr. 2016, Date de fin: 31 janv. 2021,

The objective of REPLICATE is to demonstrate Smart City technologies in energy, transport and ICT in districts in San Sebastia, Florence and Bristol addressing urban complexity and generate replication plans in other districts and in follower cities of Essen,Nilufer and Lausanne.Main challenges for cities are to increase the overall energy efficiency, to exploit better local resources in terms of ...
Voir le projet

 37

 TERMINÉ 
Four major Distribution System Operators (in Italy, France, Spain and Sweden) with smart metering infrastructure in place, associated with electricity retailers, aggregators, software providers, research organizations and one large consumer, propose five large-scale demonstrations to show that the deployment of novel services in the electricity retail markets (ranging from advanced monitoring to l ...
Voir le projet

 21

 TERMINÉ 

Silicon Carbide Power Technology for Energy Eficient Devices (SPEED)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2017,

"Highly efficient Power Electronics (PE) employed in power generation, transmission, and distribution is the prerequisite for the Europe-wide penetration of renewable energies; improves the energy efficiency; increases the power quality and enables continuous voltage regulation, reactive power compensation and automated distribution. It also facilitates the integration of distributed resources lik ...
Voir le projet

 17

 TERMINÉ 
With the growing relevance of distributed renewable energy sources (DRES) in the generation mix and the increasingly pro-active demand for electricity, power systems and their mode of operation need to evolve. evolvDSO will define future roles of distribution system operators (DSOs) on the basis of scenarios which will be driven by different DRES penetration levels, various degrees of technologica ...
Voir le projet

 16

 TERMINÉ 

People Centric easy to implement e-mobility (FREE-MOBY)

Date du début: 1 sept. 2013, Date de fin: 31 août 2016,

The FREE-MOBY project is focused to the implementation of easy to deploy micro fully electrical vehicles (450-650kg and speeds up to 90+ km/h)) and city EVs (650-1000kg).By an extra cost of only 15% solar installations in roof houses can be integrated with robust battery packs that can smooth peak powers up to 30%. Solar parking and integrated photovoltaic-battery installations are becoming more a ...
Voir le projet

 14

 TERMINÉ 
INGRID introduces and demonstrates the usage of safe, high-density solid-state hydrogen storage systems as an effective energy vector to balance the grid also by powering off-grid applications, thus enabling a smart balance between variable green energy sources supply and the grid demand. To reach its ambitions objective, the INGRID project will focus on:• The usage of new hydrogen solid-state sto ...
Voir le projet

 7

 TERMINÉ 

IntegratinG Renewables in the EuropEaN Electricity Grid (IGREENGRID)

Date du début: 1 janv. 2013, Date de fin: 31 mars 2016,

IGREENGrid focuses on increasing the hosting capacity for Distributed Renewable Energy Sources (DRES) in power distribution grids without compromising the reliability or jeopardizing the quality of supply. Based on the experience of six world class DRES integration Demo Projects in low & medium voltage grids (led by some of EEGI members; Distribution System operators –DSOs-) and other EU initiativ ...
Voir le projet

 12

 TERMINÉ 
The anticipated mass roll-out of electric vehicles (EVs) in Europe and the continuously increasing number of distributed energy resources (DER) are posing major challenges to Europe’s Distribution System Operators (DSOs) with regard to ensuring a secure and reliable energy supply and network operation. Despite ongoing research and demonstration activities in this field, particularly the developmen ...
Voir le projet

 12

 TERMINÉ 
Grid4EU project is an innovative SmartGrid project proposed by a group of Distribution System Operators (from Czech Republic, France, Germany, Italy, Spain and Sweden), in close partnership with a set of electricity retailers, manufacturers and research organizations.Adopting a systemic approach and organized around large-scale demonstrations networks located in six different countries, its struct ...
Voir le projet

 28

 TERMINÉ 

SMART MOBILITY IN SMART CITY (MOBINCITY)

Date du début: 1 juil. 2012, Date de fin: 30 juin 2015,

Urban transport is responsible for about a quarter of CO2 emissions from transport. The gradual phasing out of 'conventionally-fuelled' vehicles from the urban environment is a major contribution to significant reduction of oil dependence, greenhouse gas emissions and local air and noise pollution. Fully Electric Vehicles (FEV), for public and private transport, can contribute significantly to the ...
Voir le projet

 13

 TERMINÉ 

TRANSFORMation Agenda for Low Carbon Cities (TRANSFORM)

Date du début: 1 janv. 2013, Date de fin: 30 juin 2015,

Urban areas are responsible for three quarters of the global energy demand. Most decisions on implementing energy innovations are made in cities. TRANSFORM supports cities to meet the 20-20-20 targets by the integration of energy in urban management. In interactive Smart Urban Labs, stakeholders will be able to turn ambitions into tangible Implementation Plans.TRANSFORM’s integrative approach brin ...
Voir le projet

 20

 TERMINÉ 

Wireless charging for Electic Vehicles (UNPLUGGED)

Date du début: 1 oct. 2012, Date de fin: 31 mars 2015,

UNPLUGGED project aims to investigate how the use of inductive charging of Electric Vehicles (EV) in urban environments improves the convenience and sustainability of car-based mobility. In particular, it will be investigated how smart inductive charging infrastructure can facilitate full EV integration in the urban road systems while improving customer acceptance and perceived practicality. UNPLU ...
Voir le projet

 17

 TERMINÉ 
Green eMotion aims at enabling mass deployment of electromobility in Europe. To achieve this, major players from industry, the energy sector, municipalities as well as universities and research institutions have joined forces to develop and demonstrate a commonly accepted and user-friendly framework consisting of interoperable and scalable technical solutions in connection with a sustainable busin ...
Voir le projet

 44

 TERMINÉ 
Background Bats and raptors are two of the most threatened animal groups in Europe. Bats have been a protected species since 1939 and are included in the annexes of Bern Convention and the Habitat Directive. Out of the 34 species listed for Italy, 25 species have been recorded in Tuscany. The other targeted species of the project, the red kite (Milvus mil ...
Voir le projet

 3

 TERMINÉ 

Active Demand Value ANd Consumers Experiences Discovery (ADVANCED)

Date du début: 1 déc. 2012, Date de fin: 30 nov. 2014,

...ign will be derived taking privacy and security into account. The consortium of key European DSOs, scientific institutions, an energy consultancy, a market research company and a DR aggregator led by Enel is an ideal starting point for the 24-months project both in terms of the expertise and the data access. It will be supported by a Stakeholder Advisory Board composed of the main AD target groups ...
Voir le projet

 10

 TERMINÉ 

Internet of Energy for Electric Mobility (IoE)

Date du début: 1 mai 2011, Date de fin: 31 oct. 2014,

The objective of Internet of Energy (IoE) is to develop hardware, software and middleware for seamless, secure connectivity and interoperability achieved by connecting the Internet with the energy grids. The application of the IoE will be the infrastructure for the electric mobility. The underlying architecture is of distributed Embedded Systems (ESs), combining power electronics, integrated circu ...
Voir le projet

 43

 TERMINÉ 

Energy Efficient and Intelligent Lighting Systems (ENLIGHT)

Date du début: 1 avr. 2011, Date de fin: 1 mars 2014,

The lighting industry is currently going through a radical transformation, driven by both the rapid progress of Solid State Lighting (SSL) and semiconductors technologies, and the changing societal needs like sustainability, energy efficiency and CO2 reduction.Therefore, we have to adapt rapidly by collaborating in a supportive open-innovation eco-system, which can drive research and development t ...
Voir le projet

 30

 TERMINÉ 
"ADDRESS will research, develop and deploy technologies and processes to increase usage of Distributed Generation and Renewable Energy Resources thereby engaging in a new relationship between customers, generators and network operators. ADDRESS aims to develop new innovative architectures for Active Distribution Networks (ADN) able to balance in real time power generation and demand allowing netwo ...
Voir le projet

 27

 TERMINÉ 
"Electric and plug-in hybrid vehicles (EV, PHEV) have the potential to contribute significantly to solving contemporary and future environmental and economic challenges of mobility. Various projects in different EU member states are currently addressing the subject in an isolated manner. The G4V consortium consisting of major European electric utilities and distinguished academic institutions are ...
Voir le projet

 14

 TERMINÉ 

Open Public Extended Network metering (OPEN meter)

Date du début: 1 janv. 2009, Date de fin: 30 juin 2011,

...ortium comprises world-wide leading electricity, water, gas and heat meter manufacturing industry, alongside with some of the largest multi-utilities in Europe, and the official standardization body CENELEC, so the support of the majority of the relevant stakeholders in the area is ensured.
Voir le projet

 20

 TERMINÉ 

Supporting Energy Efficiency in Smart Generation Grids through ICT (SEESGEN-ICT)

Date du début: 1 juin 2009, Date de fin: 31 mai 2011,

Designing ICT for managing the smart grids with integrated microgrids is a challenge that cannot be won by a single utility, industry or country. It requires collaboration of all Stakeholders, in an interdisciplinary approach that brings together experiences from the different countries with their different situations and from different viewpoints, in order to contribute to a scalable system that ...
Voir le projet

 24

 TERMINÉ 
...stributed in large numbers via the Park tourist centres and during dissemination events. Much of the project’s success has been attributed to the commitment of the local electricity company, Enel and their approach has been highlighted as a model of good practice that offers good demonstration value for other areas suffering similar issues from overhead power lines related to wildlife mortality ...
Voir le projet

 2