Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Erasmus Mundus Masters in Journalism, Media and Globalisation

Date du début: 1 sept. 2016, Date de fin: 31 août 2021,

...e initiatives, anchored in three distinct bodies under the Board of Studies, will facilitate the further development and integration of research, industry links and cross-cultural teaching. Our capacity to reach these goals is verified by experiences gained from ten years of successfully dealing with the issues of developing an integrated scheme and joint degrees. A substantial part of this succes ...
Voir le projet

 9

 TERMINÉ 
The SoundCity Project MONICA aims to provide a very large scale demonstration of multiple existing and new Internet of Things technologies for Smarter Living. The solution will be deployed in 6 major cities in Europe.MONICA demonstrates a large scale IoT ecosystem that uses innovative wearable and portable IoT sensors and actuators with closed-loop back-end services integrated into an interoperab ...
Voir le projet

 28

 TERMINÉ 

Constructing an Alliance for Value-driven Cybersecurity (CANVAS)

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

The growing complexity of the digital ecosystem in combination with increasing global risks entail the danger that enforcing cybersecurity may bypass other fundamental values like equality, fairness or privacy, whereas downplaying cybersecurity would undermine citizens’ trust and confidence in the digital infrastructure. Technology developers as well as legal and philosophical scholars and empiric ...
Voir le projet

 12

 TERMINÉ 
VOX-Pol is a 60-month, €5+ million project that integrates the world’s leading researchers and research groups in Violent Online Political Extremism (VOPE), to include those researching the intersection of terrorism and the Internet (incl. violent jihadists, violent separatists, etc.), the online activities of the extreme Right, the potential for violent online radicalisation, etc., in order to:1. ...
Voir le projet

 9

 TERMINÉ 

Work Placements in Europe - Kaufmännische AZUBIs im Auslandspraktikum

Date du début: 1 juin 2016, Date de fin: 31 mai 2018,

The internationalization of vocational training has continually grown more relevant in the past few years. The improvement of interpersonal skills of “mobility trainees” and apprentices, who have worked abroad, seems to happen incidentally. The improvement of “soft skills” (analytical thinking, creativity, and sense of responsibility) as well as international competency are important for the appre ...
Voir le projet

 9

 TERMINÉ 
AFLoNext is a four year EC L2 project with the objective of proving and maturing highly promising flow control technologies for novel aircraft configurations to achieve a quantum leap in improving aircraft’s performance and thus reducing the environmental footprint. The project consortium is composed by forty European partners from fifteen countries. The work has been broken down into seven work p ...
Voir le projet

 41

 TERMINÉ 

JAEN+: Formación Profesional con Plus en Europa

Date du début: 1 oct. 2016, Date de fin: 31 déc. 2017,

... situation of the labour market in Jaén, and the analysis of the educational system, 6 are the sectors identified as necessary to boost:- Plastic- Office management- Finances- Marketing- Electricity and electronics- ICTParticipants will be selected after a selection process, being the same one in every center- the programme will consist in:- 40 hours intercultural preparation- 3 weeks language cou ...
Voir le projet

 34

 TERMINÉ 

International Working Experience for Staff and Students, 2017-2017

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

The four Social and Health Care Colleges in Region Southern Denmark have for several years cooperated about student mobility within Leonardo and Erasmus+ programmes. In this project for 2015-2017 we also work together about staff mobility (Annex 1). Firstly student and staff mobility is an important part of the colleges' initiatives to strengthen the international perspective in our educations and ...
Voir le projet

 27

 TERMINÉ 

Get ready for Europe - Learning in Vocational Training for Office Management and IT

Date du début: 1 juil. 2014, Date de fin: 30 juin 2016,

The internationalization of vocational training has continually grown more relevant in the past few years. The improvement of interpersonal skills of “mobility trainees” and apprentices, who have worked abroad, seems to happen incidentally. The improvement of “soft skills” (analytical thinking, creativity, and sense of responsibility) as well as international competency are important for the appre ...
Voir le projet

 7

 TERMINÉ 

IFA VET mobility+ 2014

Date du début: 1 juin 2014, Date de fin: 31 mai 2016,

The funding applied for within the framework of the project will be used to finance stays abroad for a total of 559 individuals and 37 accompanying persons. 321 apprentices will complete a 4 to 6 week internship specifically suited to their profession, individual level of training, knowledge and skills at a company active in their professional field. IFA will organize internships in small groups f ...
Voir le projet

 73

 TERMINÉ 

XPTO+ eXcellence in Professional Training Opportunities

Date du début: 1 sept. 2014, Date de fin: 31 mai 2016,

The XPTO + project was promoted by the "Consortium XPTO +", which was coordinated EUROYOUTH and composed by the sending schools: Agrupamento de Escolas de Santo André (AESA), Escola Profissional de Fafe (EP Fafe) and Instituto da Soldadura e Qualidade (ISQ). XPTO + The result of a convergence of ideas and wills between all partners, for, in consortium, send graduates of vocational training of nat ...
Voir le projet

 45

 TERMINÉ 
Primære målsætninger At skabe grundlag for elevernes mulighed for at opnå viden om internationale forhold og at fremme elevernes internationale, faglige og personlige kompetencer ved et praktikophold i udlandet med henblik på at fremme deres sproglige kundskaber, personlige udvikling, beskæftigelsesegnethed og deltagelse i det europæiske arbejdsmarked. At skabe grundlag for, at skolerne kan leve ...
Voir le projet

 23

 TERMINÉ 

Stimulating Enterprising Environments for Development and Sustainability (SEEDS)

Date du début: 31 déc. 2011, Date de fin: 29 juin 2015,

...ilot June 2013Groningen NL Pilot June 2013Assen NL Pilot June 2013UdN DE Pilot June 2013Empty Shops DE Pilot MkII June 2013Empty Shops DE Pilot MkI June 2013Cultural Warehouse DE Pilot June 2013River City SE June 2013Linnestaden SE Pilot June 2013Gamlestaden SE Pilot June 2013Boiler Building DK Pilot June 2013Valby DK Pilot June 2013St Kjeld DK Pilot June 2013Smedetoften DK Pilot June 2013Dudzeels ...
Voir le projet

 21

 TERMINÉ 

Smart Energy Logistics in harbours (e-harbours movement)

Date du début: 6 janv. 2014, Date de fin: 29 juin 2015,

Harbours are a microcosm of the challenges that Europe as a whole will have to face in its energy future. The shift towards renewables puts a strain on the existing electricity system, where demand and supply need to be in balance at all times.To avoid loss or spill of large amounts of valuable green energy in times of high production, the power and heat sectors can be combined in various ways. Th ...
Voir le projet

 3

 TERMINÉ 

Climate Adaptation Mainstreaming through Innovation (CAMINO)

Date du début: 8 févr. 2013, Date de fin: 2 janv. 2015,

CAMINO reconciles economic growth (Europe2020) and climate adaptation. It delivers innovative governance approaches and business cases that support mainstreaming climate adaptation in local investment projects and product/service development. CAMINO builds upon results of MARE, SKINT, SAWA (NSR), FRC (NWE) & BaltCica (BSR) and enriches its 5 regional Partnerships with industry and (inter)national ...
Voir le projet

 7

 TERMINÉ 

Climate Neutral Urban Districts in Europe (CLUE)

Date du début: 31 déc. 2011, Date de fin: 30 déc. 2014,

The project idea Climate Neutral Urban Districts in Europe (CLUE) was formulated by a team of experts at the City of Stockholm and KTH Royal Institute of Technology in Stockholm. The project idea was first presented during the EU Interregional Cooperation Forum, 20/21 September 2007, Lisbon. The objective of the CLUE regional development project is increased regional capacity in policy development ...
Voir le projet

 12

 TERMINÉ 

IMAGINE Low Energy Cities (IMAGINE)

Date du début: 31 déc. 2011, Date de fin: 30 déc. 2014,

...MAGINE aims at contributing tothe understanding of local governance, while focusing on local stakeholder dialogue and the local co-construction process of a long-term vision of the energy future of a city. The outputs of this participative process will then be integrated in the LAs policies and action plans. It is intended to capitalise on existing local activities in order to evaluate and exchang ...
Voir le projet

 10

 TERMINÉ 

Urban-rural partnerships in metropolitan areas (URMA)

Date du début: 31 déc. 2011, Date de fin: 30 déc. 2014,

...improvement of regional policies. The consortium is homogenous and diverse at the same time, comprisingdifferently shaped urban-rural regions, from strong interconnected metropolitan areas to smaller city regions. The mix of larger and smaller, well experienced and less experienced PP will open up new possibilities of learning and knowledge transfer and creates an added value for all regions. URMA ...
Voir le projet

 9

 TERMINÉ 

North Sea Region Electric Mobility Network (E-Mobility NSR) (E-Mobility NSR)

Date du début: 31 mars 2011, Date de fin: 29 sept. 2014,

The project North Sea Region Electric Mobility Network (E-Mobility NSR) provides state of the art information which may help policy development in e-mobility in the NSR. It also provides insight into the gaps and needs in respect of infrastructure, logistics and preliminary standards for multi charging techniques. Ultimately, the project will deliver a long-term basis upon which regional and local ...
Voir le projet

 17

 TERMINÉ 
...nd inside the region. The objectives of the project are to market the whole region and its different parts by developing joint promotional services and to test them in practice; to make positive publicity of the BSR lifestyles and to encourage the we-feeling of the Baltic Sea Region.ONE BSR project is implemented by 17 partners from around the entire BSR. ONE BSR partnership is built on expert org ...
Voir le projet

 17

 TERMINÉ 
...astics). It is worth noting the successful collection of rigid plastic at one recycling station in Copenhagen. This is now being permanently implemented in all recycling stations in the city, with 90% of the apartment buildings in the city having rigid plastic collection bins; this will soon be expanded to family houses. With regards to waste prevention, the project estimated that if all demonstra ...
Voir le projet

 8

 TERMINÉ 

Collaborative research on flood resilience in urban areas (CORFU)

Date du début: 1 avr. 2010, Date de fin: 30 juin 2014,

Collaborative research on flood resilience in urban areas (CORFU) is an interdisciplinary international project that will look at advanced and novel strategies and provide adequate measures for improved flood management in cities. The differences in urban flooding problems in Asia and in Europe range from levels of economic development, infrastructure age, social systems and decision making proces ...
Voir le projet

 17

 TERMINÉ 

Climate Change, Cultural Heritage & Energy Efficient Monuments (Co2olBricks)

Date du début: 16 sept. 2010, Date de fin: 15 déc. 2013,

...tners from Denmark, Sweden, Finland, Estonia, Latvia, Lithuania, Poland, Belarus and Germany, combining know how from heritage preservation departments, departments for protection of the environment, city administrations, universities, training institutions, representatives of housing societies, monument protection societies and energy agencies.The main objectives and expected results of the proje ...
Voir le projet

 18

 TERMINÉ 
CNSS will focus on emission and greenhouse gas reduction from ships, using studies to reveal the status of air quality in ports and surrounding areas. The partnership of CNSS (ports, business, regions, public authorities, NGOs, research institutes) will change this by creating transparency on cost-efficient technology solutions and develop and improve the introduction of successful air quality pro ...
Voir le projet

 19

 TERMINÉ 
Cruise Gateway will increase the maritime accessibility by developing the NSR as a cruise destination of its own and promoting it as a "lighthouse" for sustainable cruise. Main outputs are the creation of a brand for cruise in the NSR, the improvement of service quality in ports and environmentally friendly economic growth. Within the work packages, the brand will be jointly designed and best prac ...
Voir le projet

 14

 TERMINÉ 

CLEAN BALTIC SEA SHIPPING (CleanShip)

Date du début: 9 juin 2010, Date de fin: 9 sept. 2013,

...gion for clean shipping. It promotes measures to reduce emissions from ships to the atmosphere and elaborates ways to promote infrastructure for bunkering of LNG and increased use of shoreside electricity. It also elaborates future solutions to stop all sewage releases from ships into the Baltic Sea. The project shall result in a web-based Pan-Baltic Best Practice Manual and a strategy for Clean S ...
Voir le projet

 21

 TERMINÉ 

E-Logistics in NSR Harbour Cities (E-Harbours)

Date du début: 31 août 2010, Date de fin: 30 août 2013,

E-Harbours aims to create a lasting change towards sustainable energy logistics for NSR harbour cities. It will set innovative energy standards to create a transformation of the energy network in harbour areas. Show cases will provide examples for the NSR, guided by a European expert platform. By this the project will implement EU energy policies, develop innovative solutions and allow economic gr ...
Voir le projet

 8

 TERMINÉ 

RICHE – a platform and inventory for child health research in Europe (RICHE)

Date du début: 1 févr. 2010, Date de fin: 31 juil. 2013,

...will develop formal processes for finding gaps in research, and for making roadmaps. We will use these to find current gaps, and make roadmaps for the future, including for the necessary research capacity. We will promote our work and our results in a series of meetings open to researchers and other stakeholders. Our consortium is a multi-disciplinary team, with great experience in doing innovativ ...
Voir le projet

 27

 TERMINÉ 

Build with CaRe - Mainstreaming Energy efficiency in the built environment (BwC)

Date du début: 31 juil. 2008, Date de fin: 30 mars 2013,

The aim of the Build with Care project is to mainstream energy-efficient building design by raising the awareness and increasing the knowledge of the potential of energy savings. In collaboration with the building sector, a transnational strategy for increasing energy efficiency in buildings will be developed. Within the project, an education and information programme will be carried out to change ...
Voir le projet

 18

 TERMINÉ 

Tidal River Development (TIDE)

Date du début: 31 déc. 2009, Date de fin: 30 déc. 2012,

TIDE considers tidally influenced NSR estuaries with large sediment transportation, which are used as shipping channels to large harbours. The ecosystem services of intertidal and shallow estuarine habitats are threatened and need to be considered to ensure economic benefits and the maintenance of ecologically important areas. At the same time decision-makers at these estuaries are faced with an i ...
Voir le projet

 10

 TERMINÉ 
...road network is heavily loaded, resulting in traffic congestion & negative economic as well as environmental effects, sea-based transport, especially intra-European short sea shipping, shows high capacity reserves. These imbalances may only be equalized within the framework of integrated concepts for the transport chain as a whole, combining its maritime angle with the hinterland one. By realizing ...
Voir le projet

 12

 TERMINÉ 
...ndustry actors are in many cases unable to build up and expand necessary innovation due to their size and fragmented and small domestic markets. FM combines the four relevant domains INDUSTRY CAPACITY BUILDING/MARKET DEVELOPMENT (WP3); INSTITUTIONAL CAPACITY BUILDIND/POLICY DEVELOPMENT (WP4); CLUSTER/REGIONAL DEVELOPMENT (WP5); EDUCATION AND TRAINING (WP6) in one holistic project in order to start ...
Voir le projet

 11

 TERMINÉ 

Creative City Challenge (CCC)

Date du début: 31 août 2009, Date de fin: 29 nov. 2012,

CCC aims to build and implement an integrated evidence-based strategy for cities to strengthen their innovative capacity by means of a methodology of joint development and pilot testing of new tools and instruments in the fields of skills development, business cooperation and the development of urban creative clusters. CCC focuses on the catalyst role of creative industries in building and strengt ...
Voir le projet

 14

 TERMINÉ 

North Sea Skills Integration and New Technologies (SKINT)

Date du début: 30 sept. 2008, Date de fin: 30 sept. 2012,

... for online training courses, including an effective web-communication tool.DocumentsCase study HeuckenlockCase study J4M8Case study BryggenCase study Gartloch HospitalWaterTown - a computer game for city water plannersUrban green-blue grids for sustainable and dynamic citiesSKINT, from conception to resultsSKINT project posterWater Town, a simulation tool for flood managementFlyer SKINT Student S ...
Voir le projet

 10

 TERMINÉ 

Making Places Profitable - Public and Private Open Spaces (MP4)

Date du début: 31 août 2008, Date de fin: 29 sept. 2012,

...Steilshoop HamburgCase Study: Interbestuurlijk Plattelandsoverleg/Intergovernmental Rural DialogueCase Study: Highways and Green Spaces TelfordCase Study: Hailes Quarry Park EdinburghCase Study: HafenCity HamburgCase Study: Green EstateCase Study: Neighbourhood LenzsiedlungCase Study Summary: Neighbourhood LenzsiedlungCase Study: CraigmillarCase Study Summary: CraigmillarCase Study: The BID Experi ...
Voir le projet

 9

 TERMINÉ 

Sustainable Urban Fringes (SURF)

Date du début: 31 août 2009, Date de fin: 30 août 2012,

...ween various policies and programmes at local, regional & national level to make the urban fringes challenging and more attractive. The partnership brings together various partners across the NSR and city region which would not have been possible with out the support from the programme. ...
Voir le projet

 16

 TERMINÉ 

Software Services and Systems Network (S-Cube) (S-Cube)

Date du début: 1 mars 2008, Date de fin: 29 févr. 2012,

Description S-Cube, the Software Services and Systems Network, will establish an integrated, multidisciplinary, vibrant research community that will enable Europe to lead the software-services revolution...S-Cube, the Software Services and Systems Network will establish a unified, multidisciplinary, vibrant research community which will e ...
Voir le projet

 21

 TERMINÉ 
In order to make the Baltic Sea region an attractive place to invest, work & live in (strategic objective of INTERREG IV BSR), actors working on labour marked issues came to the conclusion that the already existing interregional labour market in the BSR has more potential as presently utilised. The interregional labour market is handled by national labour policy actors and stakeholders, which are ...
Voir le projet

 22

 TERMINÉ 

BaltFood - The BSR Food Cluster: Innovation and Competitiveness in Action (BaltFood)

Date du début: 31 déc. 2008, Date de fin: 23 janv. 2012,

BaltFood integrates local, regional and national food cluster organisations in six countries around the Baltic Sea into one food cluster. The cooperation focuses on enhancing the competitiveness of the BSR food industry to become the European source for valuable and affordable food products. The food industry has developed into one of the strongest business sectors in the BSR characterized by high ...
Voir le projet

 13

 TERMINÉ 

Climate Change: Impacts, Costs and Adaptation in the Baltic Sea Region (BaltCICA)

Date du début: 31 déc. 2008, Date de fin: 23 janv. 2012,

Climate change was recognized not only in terms of mitigation but also because of the need of adaptation as a major challenge that cannot be solved solely by single actors and territorial restricted actions, but asks for a coordination and support at a higher level. This is highlighted by the EU Green Paper on Adaptation to Climate Change, but also by other documents such as the EC Thematic Strate ...
Voir le projet

 24