Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

AUTOmated driving Progressed by Internet Of Things (AUTOPILOT)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

"Automated driving is expected to increase safety, provide more comfort and create many new business opportunities for mobility services. The market size is expected to grow gradually reaching 50% of the market in 2035. The IoT is about enabling connections between objects or "things"; it’s about connecting anything, anytime, anyplace, using any service over any network. There is little doubt that ...
Voir le projet

 43

 TERMINÉ 

Q/V band earth segment LInk for Future high Throughput space systems (QV-LIFT)

Date du début: 1 nov. 2016, Date de fin: 30 avr. 2019,

The QV-LIFT project aims at building the foundation of the Ground Segment Technology for the future Q/V band Terabit SatCom systems. This ambitious task will be undertaken developing core hardware and software technologies addressing urgent physical to network level needs. QV-LIFT intends to demonstrate a TRL6 for all the technologies developed and, significantly, integrating them in a realistic s ...
Voir le projet

 9

 TERMINÉ 

Green Awareness in Action (GAIA)

Date du début: 1 févr. 2016, Date de fin: 31 janv. 2019,

The GAIA project focuses on the educational community; faculty, staff, students and parents at all levels of education: primary/secondary/high schools and universities. Targeting Energy Efficiency in the context of the educational community is clearly very important due to a number of reasons since raising awareness among young people and changing their behaviour and habits concerning energy usage ...
Voir le projet

 9

 TERMINÉ 

Symbiosis of smart objects across IoT environments (symbIoTe)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2018,

Connected smart objects have invaded our everyday life across multiple domains, e.g. home withautomation solutions, assisted living with sensors and wearables to monitor personal activities, smart transportation and environmental monitoring. IoT is evolving around a plethora of vertically isolated platforms, each specifically suited to given scenarios and often adopting non-standard, sometimes ful ...
Voir le projet

 14

 TERMINÉ 

FIber-Wireless Integrated Networks for 5th Generation delivery. (FIWIN5G)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2018,

This European Training Network aims to produce the next generation of early stage researchers who will enable Europe to take a leading role in the development of future devices, systems and networks supporting the 5G high-speed wireless internet. To do this, researchers must be able to work in interdisciplinary teams, integrate their activities, share expertise, and promote a vision of a converged ...
Voir le projet

 10

 TERMINÉ 

High density scalable optically interconnected Tb/s Board (Teraboard)

Date du début: 1 déc. 2015, Date de fin: 30 nov. 2018,

Optical communications are becoming always more relevant because of the continuous growth of the requiested bandwidth. In the last decade we assisted a continuous growing of transport and metro netwotks, presently the bottleneck is in the processing of the huge amount of data constituted by the growing number of users, the capacity of the content that is exchanged and the convergence of Telecom an ...
Voir le projet

 10

 TERMINÉ 
ReCRED’s ultimate goal is to promote the user’s personal mobile device to the role of a unified authentication and authorization proxy towards the digital world. ReCRED adopts an incrementally deployable strategy in two complementary directions: extensibility in the type and nature of supported stakeholders and services (from local access control to online service access), as well as flexibility a ...
Voir le projet

 12

 TERMINÉ 

Graphene-based disruptive technologies (GrapheneCore1)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Voir le projet

 158

 TERMINÉ 
The overall objective of the ROAM project is to investigate and demonstrate the use of the orbital angular momentum (OAM) modes of light for communications and networking. Two are the primary objectives.The firs objective is to exploit the use of OAM modes in optical fibres as a disruptive means of increasing optical fibre transmission capacity for short-reach high data density applications. A tra ...
Voir le projet

 7

 TERMINÉ 

Security In trusted SCADA and smart-grids (SCISSOR)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2017,

In traditional industrial control systems and critical infrastructures, security was implicitly assumed by the reliance on proprietary technologies (security by obscurity), physical access protection and disconnection from the Internet. The massive move, in the last decade, towards open standards and IP connectivity, the growing integration of Internet of Things technologies, and the disruptivenes ...
Voir le projet

 9

 TERMINÉ 

In-Network Programmability for next-generation personal cloUd service supporT (INPUT)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2017,

The INPUT Project aims at designing a novel infrastructure and paradigm to support Future Internet personal cloud services in a more scalable and sustainable way and with innovative added-value capabilities. The INPUT technologies will enable next-generation cloud applications to go beyond classical service models, and even to replace physical Smart Devices, usually placed in users’ homes (e.g., s ...
Voir le projet

 9

 TERMINÉ 
Wireless testbeds have become an essential tool to develop and validate innovative wireless solutions. However, due to the increasing diversity of wireless solutions and competing radio technologies, along with the ever more stringent requirements on the reliability of test results, wireless test facilities have evolved to very complex systems with steep learning curves for innovators. To speed up ...
Voir le projet

 8

 TERMINÉ 
Given the inability of Highly-Distributed-Application-Developers to foresee the changes as well as the heterogeneity on the underlying infrastructure, it is considerable crucial the design and development of novel software paradigms that facilitate application developers to take advantage of the emerging programmability of the underlying infrastructure and therefore develop Reconfigurable-by-Desig ...
Voir le projet

 9

 TERMINÉ 

Superfluidity: a super-fluid, cloud-native, converged edge system (SUPERFLUIDITY)

Date du début: 1 juil. 2015, Date de fin: 31 déc. 2017,

Superfluidity is “a state in which matter behaves like a fluid with zero viscosity”. Our project aims at achieving superfluidity in the network: the ability to instantiate services on-the-fly, run them anywhere in the network (core, aggregation, edge) and shift them transparently to different locations.The SUPERFLUIDITY project tackles crucial shortcomings in today’s networks: long provisioning ti ...
Voir le projet

 18

 TERMINÉ 

Multitech SeCurity system for intercOnnected space control groUnd staTions (SCOUT)

Date du début: 1 nov. 2014, Date de fin: 31 oct. 2017,

"The goal of the project is to study, design and analyze on a risk-based approach a security system relying on multiple technologies for the protection of space control ground stations (SCGSs) against physical and cyber attacks and for intelligent reconfiguration of the ground station network in the case that one or more nodes fail.The SCOUT system is composed of three subsystems:1) A distributed ...
Voir le projet

 9

 TERMINÉ 

Access CenTer for PHotonics innovAtion Solutions and Technology support (ACTPHAST)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2017,

ACTPHAST is a unique "one-stop-shop" European access centre for photonics innovation solutions and technology support (Access CenTre for PHotonics innovAtion Solutions and Technology support). ACTPHAST will support and accelerate the innovation capacity of European SMEs by providing them with direct access to the expertise and state-of-the-art facilities of Europe's leading photonics research cent ...
Voir le projet

 29

 TERMINÉ 
The SUNNY project aims to contribute to EUROSUR by defining a new tool for collecting real-time information in operational scenarios.SUNNY represents a step beyond existing research projects due to the following main features:•A two-tier intelligent heterogeneous UAV sensor network will be considered in order to provide both large field and focused surveillance capabilities, where the first-tier ...
Voir le projet

 20

 TERMINÉ 
The overall objective of Flex5Gware is to deliver highly reconfigurable hardware (HW) platforms together with HW-agnostic software (SW) platforms targeting both network elements and devices and taking into account increased capacity, reduced energy footprint, as well as scalability and modularity, to enable a smooth transition from 4G mobile wireless systems to 5G.As it will be argued in the propo ...
Voir le projet

 19

 TERMINÉ 

Coordinating European Research on Molecular Communications (CIRCLE)

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

In recent years, several research groups have been created in the emerging research area of molecular communications. This is seen as a fundamental enabler for nano-scale networked devices. The heterogeneity of the biological environments that can host nano-scale communications has produced different proposals (e.g. neuronal networks, molecular diffusion, flow-based carrier mobility) analyzed by m ...
Voir le projet

 11

 TERMINÉ 

Behavioral Based Forwarding (BEBA)

Date du début: 1 janv. 2015, Date de fin: 31 mars 2017,

BEBA challenges a very ambitious goal: can we deploy wire-speed-reactive control/processing tasks inside the network switches, while retaining i) centralized control of their specification/operation, ii) high performance and scalability, and - crucial for real world adoption - iii) platform independency, i.e., consistency with the vendors’ need for closed platforms? BEBA’s answer revolves around t ...
Voir le projet

 7

 TERMINÉ 

Integrated Reconfigurable silicon photonic based optical Switch (IRIS)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2016,

IRIS aims at fabricating a highly integrated, scalable, transparent and high capacity WDM Photonic Switch used as an Transponder Aggregator (TPA),a novel function which will be added to existing ROADM nodes without disrupting their architecture while adding attributes such as colourless, directionless and contentionless. For Metro networks, this switch will provide flexibility, energy efficiency, ...
Voir le projet

 8

 TERMINÉ 
Our goal is to develop technology for fast optical communication using revolutionary concepts that challenge the mainstream approaches for photonics integration and packaging. The primary application is optical communication inside high performance computing systems, such as supercomputers and datacenters, but the technologies will also find use in many other applications.Power-efficient InP VCSEL ...
Voir le projet

 8

 TERMINÉ 

Federation for FIRE (Fed4FIRE)

Date du début: 1 oct. 2012, Date de fin: 30 sept. 2016,

A federation of experimentation facilities will significantly accelerate Future Internet research. Fed4FIRE will deliver open and easily accessible facilities to the FIRE experimentation communities, which focus on fixed and wireless infrastructures, services and applications, and combinations thereof. The project will develop a demand-driven common federation framework, based on an open architect ...
Voir le projet

 43

 TERMINÉ 

PETRA - Photonic Environment moniToring Risk Assessment (PETRA)

Date du début: 1 févr. 2015, Date de fin: 31 juil. 2016,

The goal of PETRA (Photonic Environment moniToring & Risk Assessment) is the design and the IPR transfer of a radically new precommercial photonics based prototype for noninvasive continuous remote monitoring system for geo-technical risk assessment. PETRA will step from the ERC-funded project PHODIR that successfully carried out the realization and the field trial of the first photonic based rada ...
Voir le projet

 1

 TERMINÉ 
Landmines and the cluster munitions still kill or maim civilians every day in an indiscriminate manner even long after conflicts are over. At the current rate of clearance of about 500,000 mines per year and assuming no additional mines are laid from now on, it could still take hundreds of years to find and clear all the landmines around the world.D-BOX will tackle the burning issue of anti-person ...
Voir le projet

 24

 TERMINÉ 
The MAIN OBJECTIVE of the project is to plan and run ad hoc measurements finalized to test, validate and optimize:1) The radar signal simulator CleoSIm developed in the CLEOPATRA project;2) The radar signal processing and weather classification algorithms implemented on an EFB in the KLEAN project.3) The EFB GUI interfaces for the advanced display of weather classifications and decision-making adv ...
Voir le projet

 4

 TERMINÉ 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Date du début: 1 oct. 2013, Date de fin: 31 mars 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Voir le projet

 154

 TERMINÉ 

Architecture and Applications of Green Information Centric Networking (GreenICN)

Date du début: 1 avr. 2013, Date de fin: 31 mars 2016,

Information Centric Networking (ICN) is a new paradigm where the network provides users with named content, instead of communication channels between hosts. Research on ICN is at an early stage, with many key issues still open, including naming, routing, resource control, security, privacy and a migration path from the current Internet. Also missing for efficient information dissemination is seaml ...
Voir le projet

 6

 TERMINÉ 
"The WINFC (Weather INformation Fusion and Correlation for weather and traffic situational awareness) project aim at the development of an adaptive data processing module that, once on board, will collect and process information coming from weather and traffic data providers. Such module will be designed in order to collect data, produce an awareness map (integrating weather changes and traffic ch ...
Voir le projet

 2

 TERMINÉ 

Network of Excellence in Wireless COMmunications # (NEWCOM#)

Date du début: 1 nov. 2012, Date de fin: 31 oct. 2015,

NEWCOM# is a Network of Excellence (NoE) proposal submitted in response to challenge FP7-ICT-2011-8 1.1, "Future Networks". A group of 14 partners in 14 different countries (12 of which come from the former FP7 NoE NEWCOM++) decided to capitalize on the high degree of integration in research they already at-tained to build an NoE with the following objectives: i) to produce medium to long term res ...
Voir le projet

 18

 TERMINÉ 

Cognitive Radio Experimentation World (CREW)

Date du début: 1 oct. 2010, Date de fin: 30 sept. 2015,

The main target of CREW is to establish an open federated test platform, which facilitates experimentally-driven research on advanced spectrum sensing, cognitive radio and cognitive networking strategies in view of horizontal and vertical spectrum sharing in licensed and unlicensed bands.The CREW platform incorporates 5 individual wireless testbeds (heterogeneous ISM @ iMinds-Gent, heterogeneous l ...
Voir le projet

 17

 TERMINÉ 
"CAESARIS project aims at developing a new, integrated security and search-and-rescue airborne solution conceived to detect people, both above visible and hidden behind opaque layers (like foliage, trailer covers, boat covers) or in darkness and reduced visibility conditions. This solution will work on board of an aerial vehicle making exhaustive and intelligent use of state-of-the-art sensors: Sy ...
Voir le projet

 6

 TERMINÉ 

Community Networks Testbed for the Future Internet (CONFINE)

Date du début: 1 oct. 2011, Date de fin: 30 sept. 2015,

Community networks are an emerging and successful model for the Future Internet across Europe and far beyond. The CONFINE project complements existing FIRE infrastructure by establishing a new facility built on the federation of existing community IP networks constituted by more than 20,000 nodes and 20,000 Km of links. These community networks incorporate a large and wide variety of commodity ...
Voir le projet

 24

 TERMINÉ 

Management and Authenticity Verification of multimedia contENts (MAVEN)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2015,

The MAVEN project will focus on the development of a set of tools for multimedia data management and security. More specifically, MAVEN objectives will be centered on two key concepts, “search” and “verify”, integrated in a coherent manner; MAVEN will first search for digital contents containing “objects” of interest (e.g. a face appearing on CCTV, or a specific logo appearing in the news). Once t ...
Voir le projet

 8

 TERMINÉ 

European Conferences on Networks and Communications (EuCNC) (EuConNeCts)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2015,

It is the purpose of EuConNeCts, a Supporting Action, to organise the following 2 editions, 2014 and 2015, of the EC sponsored conference in the area of communication networks and systems. The conference will be named EuCNC - European Conference on Networks and Communications. EuCNC will serve as a technical and scientific conference for researchers, namely European ones, to show their work in t ...
Voir le projet

 5

 TERMINÉ 
This proposal details activities that will ensure the continued enhancement and ongoing operation of the leading-edge GÉANT network, supporting a range of network and added-value services, targeted at users across the GÉANT service area.In the area of multi-domain network service operation, GN3plus plans to deliver fast, efficient provisioning of advanced services, develop operational support acro ...
Voir le projet

 72

 TERMINÉ 
During the last century, significant scientific progress has more than doubled the average lifetime of developed countries inhabitants. This amazing result is the indirect consequence of X-rays discoveryin 1901, of antibiotics in the late 20s, of advances in surgery with the first heart transplant in the late 60s, to name just a few representative examples. In the new millennium, eHealth will like ...
Voir le projet

 11

 TERMINÉ 

Knowledge-based EFB for green flight trajectory decision aid (KLEAN)

Date du début: 1 juin 2012, Date de fin: 31 juil. 2014,

"The MAIN OBJECTIVE of the KLEAN project is to develop a custom knowledge-based EFB (Electronic Flight Bag) with SW packages implementing Advanced Weather Radar Post-processor (AWRP) and QAI (Quasi-Artificial Intelligence) agent algorithms, provided by Selex Galileo, for green trajectory optimization (reduction of CO2 and NOX emissions as well as noise pollution).The EFB is also customized to incl ...
Voir le projet

 1

 TERMINÉ 

OpenLab: extending FIRE testbeds and tools (OpenLab)

Date du début: 1 sept. 2011, Date de fin: 30 juin 2014,

Experimentally-driven research is key to success in exploring the possible futures of the Internet. An open, general-purpose, shared experimental facility, both large-scale and sustainable, is essential for European industry and academia to innovate today and assess the performance of their solutions. OpenLab brings together the essential ingredients for such a facility. We extend early prototypes ...
Voir le projet

 31

 TERMINÉ 

REVerse engineering of audio-VIsual coNtent Data (REWIND)

Date du début: 1 mai 2011, Date de fin: 30 avr. 2014,

With the rapid proliferation of inexpensive acquisition and storage devices multimedia objects can be easily created, stored, transmitted, modified and tampered with by anyone. During its lifetime, a digital object might go through several processing stages, including multiple analog-to-digital (A/D) and digital-to-analog (D/A) conversions, coding and decoding, transmission, editing (either aimed ...
Voir le projet

 8