Rechercher des projets européens

25 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

HOLIstic optimisation of SHIP design and operation for life cycle (HOLISHIP)

Date du début: 1 sept. 2016, Date de fin: 31 août 2020,

Most maritime products are typically associated with large investments and are seldom built in large series. Where other modes of transport benefit from the economy of series production, this is not the case for maritime products which are typically designed to refined customer requirements increasingly determined by the need for high efficiency, flexibility and low environmental impact at a compe ...
Voir le projet

 39

 TERMINÉ 
A key EU policy aims to reduce the Union dependency on raw materials imports, in particular (candidate) Critical Raw Materials that are vital for the EU innovative technologies. Topic SC5-11c-2015 scope focuses on “developing new highly-automated technological sustainable solutions for deep mining … in the sea bed combined with in-situ processing of minerals”. An existing but challenging raw mater ...
Voir le projet

 14

 TERMINÉ 

Synchro-modal Supply Chain Eco-Net (SYNCHRO-NET)

Date du début: 1 mai 2015, Date de fin: 31 oct. 2018,

SYNCHRO-NET will demonstrate how a powerful and innovative SYNCHRO-modal supply chain eco-NET can catalyse the uptake of the slow steaming concept and synchro-modality, guaranteeing cost-effective robust solutions that de-stress the supply chain to reduce emissions and costs for logistics operations while simultaneously increasing reliability and service levels for logistics users.The core of the ...
Voir le projet

 19

 TERMINÉ 
"TRUST aims at conducting CO2 injection experiments at scales large enough so that the output can be extrapolated at industrial scales. It relies on four sites: the heavily instrumented sites of Heletz (Israel, main site) and Hontomin (Spain), access Miranga (Brazil) and the emerging site in the Baltic Sea region. The objectives are to: carry out CO2 injection with different strategies, displaying ...
Voir le projet

 18

 TERMINÉ 

Joint Operation for Ultra Low Emission Shipping (JOULES)

Date du début: 1 juin 2013, Date de fin: 31 mai 2017,

Reducing emissions from shipping has increasingly become a challenge over the last years, both as a counter measure against global climate change and to protect local environments and population from waste, gas emissions and noise.This challenge has been documented both in policy papers, like the Europe 2020 initiative or the Transport White Paper, and in rules and regulations issued by IMO as wel ...
Voir le projet

 44

 TERMINÉ 

Inspection Capabilities for Enhanced Ship Safety (INCASS)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2016,

In the day-to-day ship operations, structural and machinery failures may lead to major accidents, endangering crew and passengers lives onboard, posing a threat to the environment, damaging the ship itself and having a great impact in terms of business losses. Moreover, with the introduction and building of a big number of new ships, their monitoring and inspection from both regulatory bodies and ...
Voir le projet

 12

 TERMINÉ 

MESA - Maritime Europe Strategy Action - FOSTER Waterborne (MESA)

Date du début: 1 sept. 2013, Date de fin: 31 août 2016,

Maritime Europe Strategy Action (MESA – FOSTER WATERBORNE), main strategic objective (in line with WATERBORNE-TP) is to strengthen the effectiveness of the research and innovation capacities of the European maritime industry, by:- Optimization of the European maritime RDI strategies- Improvement of the stakeholders network, of the dissemination, of the use of the research results, and increasing t ...
Voir le projet

 32

 TERMINÉ 

Crew-centered Design and Operations of ships and ship systems (CYCLADES)

Date du début: 1 oct. 2012, Date de fin: 30 sept. 2015,

The CyClaDes project is designed to promote the increased impact of the human element in shipping across the design and operational lifecycle. The project brings together a multi-disciplinary team to focus on all the key steps in the lifecycle; the stakeholders; where the barriers to human element integration occur; and how to best locate, produce, disseminate, and apply human element knowledge wi ...
Voir le projet

 14

 TERMINÉ 

Achieve QUieter Oceans by shipping noise footprint reduction (AQUO)

Date du début: 1 oct. 2012, Date de fin: 30 sept. 2015,

Recent directives outline the need to mitigate underwater noise footprint due to shipping, to prevent negative consequences to marine life. In that context, the final goal of AQUO project is to provide to policy makers practical guidelines, acceptable by shipyards and ship owners. The list of solutions will be split into solutions regarding ship design (including propeller and cavitation noise), a ...
Voir le projet

 13

 TERMINÉ 

High Power, high Reliability offshore wind technology (HIPRWIND)

Date du début: 1 nov. 2010, Date de fin: 30 juin 2015,

The aim of the HiPRwind project is to develop and test new solutions for very large offshore wind turbines at an industrial scale. The project addresses critical issues of offshore WT technology such as extreme reliability, remote maintenance and grid integration with particular emphasis on floating wind turbines, where weight and size limitations of onshore designs can be overcome.HiPRWind will t ...
Voir le projet

 22

 TERMINÉ 

Green Retrofitting through Improved Propulsion (GRIP)

Date du début: 1 nov. 2011, Date de fin: 31 mars 2015,

"The aim of the GRIP project is to reduce fuel consumption in shipping by 5% (with individual ships up to 10%) and thus reduce exhaust gas emissions. Its first objective is to give a sound basis for the choice of energy-saving devices (ESD) for ship owners. The second is to give insight into the detailed requirements on the device design by performing an analysis of the interaction between hull a ...
Voir le projet

 11

 TERMINÉ 
The key objective of the TROPOS project is the development of a floating modular multi-use platform system for use in deep waters, with an initial geographic focus on the Mediterranean, Tropical and Sub-Tropical regions but designed to be flexible enough not to be limited in geographic scope.The TROPOS approach is centered on the modular development where different types of modules can be combined ...
Voir le projet

 21

 TERMINÉ 
PANACEA aims at developing methods and tools for improved prediction and validation of the long-term behavior of sequestered CO2. The objectives are to: 1) Identify and quantify the factors responsible for the long-term stability of the stored CO2, thus requiring a clear understanding of the dynamics of the injected CO2, chemical interactions with the host rock, and the evolution in time of its pa ...
Voir le projet

 12

 TERMINÉ 

Ultra Slow Ships (ULYSSES)

Date du début: 1 janv. 2011, Date de fin: 31 déc. 2013,

"With climate change coming to the forefront of society’s perception, there is increasing pressure on all industries to CO2 emissions through increased efficiency and the maritime industry is no exception. The objective of ULYSSES is to demonstrate, through a combination of ultra slow speeds and complementary technologies, that the efficiency of the world fleet can be increased to a point where th ...
Voir le projet

 14

 TERMINÉ 
"The basic concept of the present work is the definition of an effective repair method for large steel structures with defects. Two basic steel structural types will be dealt with in this work, namely marine structures and steel civil engineering structures. The objective of this project is to demonstrate that composite patch repairs can be environmentally stable and therefore, that they can be us ...
Voir le projet

 15

 TERMINÉ 
"The primary objective of the RISPECT project is to use ship structural inspection results (coating condition, corrosion, cracks and deformation) along with the calculated expected results to guide future inspections required to achieve a minimum structural reliability.This “probabilistic inspection planning” is not new but this project takes the method a stage further to use data from large numbe ...
Voir le projet

 11

 TERMINÉ 

Breakthrough in European Ship and Shipbuilding Technologies (BESST)

Date du début: 1 sept. 2009, Date de fin: 28 févr. 2013,

"Initiated by EUROYARDS, BESST aims to achieve a breakthrough in competitiveness, environmentally friendliness and safety of EU built ships. Focusing on passenger ships, ferries and mega-yachts, the results will to a large extend be applicable also to other ships. A holistic life cycle performance assessment on ship level will guide the technical developments on system level, clustered in System G ...
Voir le projet

 70

 TERMINÉ 

Surfacing System for Ship Recovery (SuSy)

Date du début: 1 sept. 2009, Date de fin: 28 févr. 2013,

The propagation of spillages is one of the biggest environmental problems after a ship disaster. Instead of cleaning the dirty areas the SUSY system will avoid the spillages by stabilizing vessels immediately after an accident. The main goal of the project is the development of well known submarine rescue technology into systems usable for merchant ships in emergency situations. The systems for su ...
Voir le projet

 9

 TERMINÉ 
"The electric ship concept offers many benefits; among other aspects if offers flexibility of control and effectiveness of power transmission. But predominantly it enables higher energy conversion efficiency by ensuring that prime movers are effectively loaded at all times and across all operating conditions. This dominating advantage cannot be matched by mechanical transmission systems because ge ...
Voir le projet

 34

 TERMINÉ 

Ships oriented Innovative soLutions to rEduce Noise & Vibrations (SILENV)

Date du début: 1 oct. 2009, Date de fin: 30 nov. 2012,

"Transports are well known to be major contributors to noise pollution. Noise and vibrations (N&V) abatement naturally appears as an important objective for in the greening of surface transports.The SILENV project is a response to this requirement for the maritime domain.The consequences of N&V emissions from the ships are multiple. N&V emissions constitute a disturbance for both passengers and ha ...
Voir le projet

 15

 TERMINÉ 

Ship Evacuation Data and Scenarios (SAFEGUARD)

Date du début: 1 avr. 2009, Date de fin: 30 nov. 2012,

"The collection of human performance data in full-scale ship trials is vital for the calibration and validation of ship based evacuation models. The IMO Fire Protection Sub-Committee in their modification of MSC circ 1033 at the FP51 meeting in February 2007 invited member governments to provide, “…further information on additional scenarios for evacuation analysis and full scale data to be used ...
Voir le projet

 9

 TERMINÉ 

Tools for Ultra Large Container Ships (TULCS)

Date du début: 1 juin 2009, Date de fin: 30 nov. 2012,

"The increase in world trade has largely contributed to the explosion in sea traffic. As a result, the market demand is leading to Ultra Large Container Ships (ULCS), which have a capacity up to 14,000 TEU with length up to 400 m, without changes of the operational requirements (speed around 27 knots). The particular structural design of the container ships, leads to open midship sections, resulti ...
Voir le projet

 14

 TERMINÉ 

Probabilistic Framework for Onboard Fire-Safety (FIREPROOF)

Date du début: 1 juin 2009, Date de fin: 31 oct. 2012,

"The traditional fire safety regulations that apply to ship design have been widely described as inadequate in two ways. Firstly they do impose unnecessary and inapplicable constraints on novel designs. Secondly novel designs can have features that do not satisfy the premise of existing rules, thereby setting them free from fire safety rules by default, often leading to unsafe designs. In or ...
Voir le projet

 13

 TERMINÉ 
"The size of new passenger ships is continuously increasing. Bigger size offers bigger opportunities and economics of scale, but when a bigger ship accommodates more passengers there may be a higher risk, if evacuation is needed. Thus, new approaches have to be used and further developed in order to have the flooding under control if the watertight integrity of the ship is lost. In the worst case ...
Voir le projet

 17

 TERMINÉ 
"The project will define and undertake scientific methods for measurement of fatigue in various realistic seagoing scenarios using bridge, engine-room and cargo simulators; will assess the impact of fatigue on decision-making performance and will determine optimal settings for minimising those risks to both ship and seafarer. Three simulator-equipped institutes will collaborate in ensuring that en ...
Voir le projet

 11