Rechercher des projets européens

19 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
Background Responsibility for infrastructure is devolved to the regional or local level in many parts of the EU. However, many small and medium-sized authorities lack the knowledge and capacity to address the challenges posed by the need for climate change adaptation (CCA). LIFE LOCAL ADAPT has been designed to identify specific threats at local level and ...
Voir le projet

 7

 TERMINÉ 

Mur experience - Alpine river management Upper Mur (Murerleben)

Date du début: 1 févr. 2010, Date de fin: 1 févr. 2017,

Background The Natura 2000 site, 'Ober- und Mittellauf der Mur mit Puxer Auwald, Puxer Wand and Gulsen', covers an area of 1 309 ha. Long stretches of the Upper Mur river originally had a furcating riverbed. River engineering measures successively narrowed the original riverbed to its present shape with an average width of around 20 m. However, the entire ...
Voir le projet

 3

 TERMINÉ 

LIFE+ River landscape development Enns (Flusslandschaft Enns)

Date du début: 10 janv. 2011, Date de fin: 31 déc. 2015,

Background The project area around the river Enns (district of Liezen, Styria, Austria) covers a total area of 4 177 ha and consists of three Natura 2000 sites featuring a number of important habitats and species. The Enns meanders from one side of the river valley to the other, which has led to the development of valley bogs and alluvial forests along ...
Voir le projet

 4

 TERMINÉ 
Migration appears as one of the biggest challenges for the European societies and political systems. A common growth and wealth with social integration is only possible if it could be achieved to use the potentials of migrations and approach the challenges attached to it. Besides its positive function for personal health and fitness as well as its economic power, sports could have a core role of s ...
Voir le projet

 5

 TERMINÉ 

REGIONAL COOPERATION MANAGEMENT HU - AT (RECOM HU-AT 2014)

Date du début: 31 déc. 2011, Date de fin: 30 déc. 2014,

Aufgaben werden im Rahmen des Projektes verwirklicht:•Entwicklung einer grenzüberschreitenden Regionalentwicklungsstrategie•Unterstützung bei der Entwicklung von grenzüberschreitenden Projektideen•Auf- und Ausbau eines Wissensmanagements zwischen Österreich und Ungarn•Innovationspreisverleihung zur Prämierung von grenzüberschreitenden Projekten•Kleinprojektefonds für bilaterale Kooperationen von V ...
Voir le projet

 4

 TERMINÉ 
Der Zweck des Projektes PMinter ist wesentliche Verbesserung der Luftqualität in Klagenfurt - Unterkärnten in Österreich, Untersteiermark in Österreich und in Maribor - Nordslowenien und Verminderung des direkten Risikos wegen Aussetzung der Einwohner von einbezogenen Regionen an die verschmutzte Luft. Im Rahmen des Projektes will die Projektpartnerschaft das Wissen über Beitrag einzelner Quellen ...
Voir le projet

 7

 TERMINÉ 
to increase protection of people and environment against natural disasters and improve the quality of the living environment for people, flora and fauna. Programme area includes environment along the rivers Drava and Mura.
Voir le projet

 7

 TERMINÉ 

Energie Strategie Pannonien (ESPAN)

Date du début: 31 mars 2008, Date de fin: 30 déc. 2012,

Die Hauptmotivation für ESPAN ist die Verfolgung von Klimaschutzzielen und die bestmögliche Nutzung lokal und regional vorhandener Ressourcen zur Energieerzeugung. Langfristig wird das Ziel der vollständigen Unabhängigkeit von, zumeist fossilen, Energieimporten angestrebt.ESPAN will den Sektor nachhaltige Energieentwicklung auf bilateraler, regionaler, kommunaler und privater Ebene nachhaltig auf ...
Voir le projet

 9

 TERMINÉ 

Regional Cooperation Management HU-AT (Recom)

Date du début: 30 nov. 2007, Date de fin: 30 janv. 2012,

...len und der nationalen bzw. grenzüberschreitenden Ebene. Sie unterstützen und begleiten bestehende ETZ-Projekte, stellen Synergien her und steigern somit die Qualität der Projekte und des Gesamtprogramms. In den Bereichen Tourismus, Arbeitsmarkt und Bildung, Energie und Umwelt, Mobilität und Verkehr sowie Wirtschaft, Forschung und Innovation werden grenzüberschreitende Netzwerke aufgebaut. Die ebe ...
Voir le projet

 5

 TERMINÉ 

gnosemodell Raab (ProRaab(a))

Date du début: 31 mars 2008, Date de fin: 30 déc. 2011,

...insame Vorgehensweise beschlossen, um dieses Problem zu lösen.Ziel ist die Erstellung eines Hochwasser-Prognosemodells Raab, das analog zum internationalen Modell für die Mur (einheitliches Gesamtsystem) erfolgen soll. Das Kernstück stellt ein internationaler (zentraler) Prognose-Rechner in Graz mit lokalen Systemen in jeder Partnerregion dar. Damit hätten die Partner – Wasserwirtschaft Steiermark ...
Voir le projet

 4

 TERMINÉ 
Background Efforts to preserve the Nationalpark Gesäuse date back to the beginning of the 20th century. The area is now classified as a category II national park, in line with the criteria of the IUCN. The project area focussed on 10 300 ha, encompassing two Natura 2000 sites, and home to an impressive 25 habitats of European importance. Seven of the 25 ...
Voir le projet

 3

 TERMINÉ 
Background Air pollution from high levels of particulate matter (PM) is a major environmental and health problem in many European cities. Raised levels of these tiny, solid particles in the air are linked to health hazards such as heart disease, breathing problems and lung cancer. The European Commission estimates that the problem causes 300 000 early d ...
Voir le projet

 9

 TERMINÉ 

River management of the central (inner) river Mur (MUR)

Date du début: 1 août 2003, Date de fin: 31 juil. 2007,

Background Located in the Alpine part of the Mur river valley, the LIFE project area covers typical river floodplain habitats, such as running and standing water, inland marshes, wet grassland and floodplain forests. Around 75% of the river flowing through the project area can be classified as ‘typical riverine landscape’ and holds strong ecological v ...
Voir le projet

 7

 TERMINÉ 

River Basin Agenda Alpine Space (River Basin Agenda)

Date du début: 30 avr. 2003, Date de fin: 27 févr. 2006,

The risk potential in river basins has risen sharply throughout Europe due to the enormous pressures of utilization in the narrow valleys. In order to improve safety for the valley populations, increased, sustained inter-regional and transnational commitment is required. The Alpine River Basin Agenda thereby makes innovative contributions in 10 selected river basins: - from working focussed on the ...
Voir le projet

 10

 TERMINÉ 
Hauptziel• Schutz des Menschen vor den natürlichen Gefahren der Umwelt Weitere Ziele:• Verbesserte Kenntnisse von Hochwasserereignissen und Hochwassergefahren (Risikoanalysen) und verbesserter Informationsaustausch im Hochwassermanagement • Verbesserung des grenzüberschreitenden Hochwasser Managements • Verbesserte Kenntnisse bezüglich des Sedimenttransportes von beiden Flüssen und Flussgebieten• ...
Voir le projet

 7

 TERMINÉ 
Reason: The International Classification of Functioning, Disability and Health (ICF,WHO 2002) is a classification of health and disability. The ICF-CY (Children/Youth with 1400 items) represents WHO's quality frame for assessments for children. Former "EQM-PD" introduced ICF online assessment into the field of assistance for adult persons with disability (PwD); ICF-Train transfered these online to ...
Voir le projet

 12

 TERMINÉ 
Putting the disabled on an equal footing : The project has produced a training curriculum together with an assessment tool aimed at both professionals working with the disabled and the beneficiaries themselves. It will contribute to improved standards of care for the disabled. This project started in 2003 and lasted 36 months.
Voir le projet

 18

 TERMINÉ 
The European Commission has on September 6, 2010 proposed that 2012 be designated as the “European Year for Active Ageing”. We want to contribute to this event with our “Age on Stage” project by promoting later and intergenerational learning in nowadays society and its relevance for a positive development in Europe. For many years now, later learning is on the agenda of many EU and national educat ...
Voir le projet

 2

 TERMINÉ 
The network “European Regions Enhancing Internationalisation in Vocational Education and Training“(EREIVET) has the objective to enhance quantity and quality of learning mobility in vocational education and training. Mobility, recognition of vocational degrees, transparency in vocational education and training, the cooperation between different partners in vocational education and training are mai ...
Voir le projet

 15