Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

MEthane goes MObile - MEasurements and MOdelling (MEMO2)

Date du début: 1 mars 2017, Date de fin: 28 févr. 2021,

Mitigation of climate change is a key scientific and societal challenge and also a headline target of the EU2020 strategy. Strong reductions in greenhouse gas emissions are necessary to reach the global warming target agreed on at the 2015 United Nations Convention of Parties in Paris. Such emission reductions can only be achieved if sources are properly quantified and mitigation efforts are verif ...
Voir le projet

 9

 TERMINÉ 
The typical lifetime of an industrial process plant is between 30 and 50 years. Technologies to enhance the operation and optimization of process plants can both guide the development of new state-of-the-art process plants and, perhaps more pertinently, can ensure that the large installed base of existing plants operates efficiently. The PRONTO Consortium partners are strongly convinced that for E ...
Voir le projet

 11

 TERMINÉ 

EPOS Implementation Phase (EPOS IP)

Date du début: 1 oct. 2015, Date de fin: 30 sept. 2019,

The nations of Europe are distributed around some of the most complex and dynamic geological systems on the planet and understanding these is essential to the security of livelihoods and economic power of Europeans. Many of the solutions to the grand challenges in the geosciences have been led by European scientists – the understanding of stratigraphy (the timing and distribution of layers of sedi ...
Voir le projet

 48

 TERMINÉ 
"A scientific and technological paradigm change is taking place, concerning the way that very high performance time and frequency reference signals are distributed, moving from radio signal broadcasting to signal transport over optical fibre networks. The latter technology demonstrates performance improvements by orders of magnitude, over distances up to continental scale. Research infrastructures ...
Voir le projet

 16

 TERMINÉ 

Authentication and Authorisation For Research and Collaboration (AARC2)

Date du début: 1 mai 2017, Date de fin: 30 avr. 2019,

The goal of AARC2 is to design an AAI framework to develop interoperable AAI, to enable researchers to access the whole research and infrastructure service portfolio with one login. AARC2's objectives are:1. enable federated access in research communities participating in AARC22. assist research communities to map their requirements to concrete service offerings3. support research (e-)infrastructu ...
Voir le projet

 26

 TERMINÉ 

Advanced European Infrastructures for Detectors at Accelerators (AIDA-2020)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2019,

Particle physics is at the forefront of the ERA, attracting a global community of more than 10,000 scientists. With the upgrade of the LHC and the preparation of new experiments, the community will have to overcome unprecedented challenges in order to answer fundamental questions concerning the Higgs boson, neutrinos, and physics beyond the Standard Model. Major developments in detector technology ...
Voir le projet

 38

 TERMINÉ 
The future energy system is challenged by the intermittent nature of renewables and requires therefore several flexibility options. Still, the interaction between different options, the optimal portfolio and the impact on environment and society are unknown. It is thus the core objective of REFLEX to analyse and evaluate the development towards a low-carbon energy system with focus on flexibility ...
Voir le projet

 10

 TERMINÉ 

Personalised Decision Support for Heart Valve Disease (EurValve)

Date du début: 1 févr. 2016, Date de fin: 31 janv. 2019,

Valvular Heart Disease currently affects 2.5% of the population, but is overwhelmingly a disease of the elderly and consequently on the rise. It is dominated by two conditions, Aortic Stenosis and Mitral Regurgitation, both of which are associated with significant morbidity and mortality, yet which pose a truly demanding challenge for treatment optimisation. By combining multiple complex modelling ...
Voir le projet

 14

 TERMINÉ 

GameHub: University-enterprises cooperation in game industry in Ukraine

Date du début: 15 oct. 2015, Date de fin: 14 oct. 2018,

The wider objective of the GameHub project is to ensure employability and self-sustainability of HEI graduates, unemployed engineers as well as veterans of Anti-Terror Operation (ATO) in Ukraine by equipping them with knowledge and skills demanded by digital game industry (GI) - a highly networked global impact economy. GI strongly based on online work approach allows one to develop a highly techn ...
Voir le projet

 12

 TERMINÉ 

EUropean CERamic MATerials

Date du début: 1 sept. 2015, Date de fin: 31 août 2018,

The aim the European Ceramic Materials (EUCERMAT) project is to significantly contribute to changing the general opinion about ceramics materials in Europe. As a matter of fact, ceramic materials are too often simply associated to great diffusion materials mainly employed as building materials (covering plates factories, glasses for windows... etc.). This narrow and negative image is the main reas ...
Voir le projet

 13

 TERMINÉ 

Reservoir Computing with Real-time Data for future IT (RECORD-IT)

Date du début: 1 sept. 2015, Date de fin: 31 août 2018,

The aim of this proposal is to develop an intelligent biocompatible sensing device which detects complex behavioural changes in ion concentrations. The sensor will use wet NOMFETs, coated Si nanowires, self-conjugated polymers, arrays of photocells, flow of lipids. The level of ions will be measured by monitoring changes in the response function of the system. The high sensitivity of the device wi ...
Voir le projet

 9

 TERMINÉ 
This is a project for higher education student and staff mobility between Programme Countries and Partner Countries. Please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2016, Date de fin: 31 mai 2018,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 

Predictable Flexible Molten Salts Solar Power Plant (PreFlexMS)

Date du début: 1 juin 2015, Date de fin: 31 mai 2018,

Predictability and flexibility are key enablers to increase CSP penetration in the energy mix by a) increasing dispatchability b) making CSP less/not reliant on subsidies c) supporting stable grid operation d) enabling operators to access new revenue streams (electricity trading, ancillary services). Today CSP plants with molten salt storage only partly achieve these objectives. Key enabling techn ...
Voir le projet

 16

 TERMINÉ 

My Lifelong Knowledge management

Date du début: 1 sept. 2015, Date de fin: 28 févr. 2018,

Lifelong learning can take place in a variety of environments, both inside and outside formal education and training systems. Lifelong learning implies investing in people and knowledge; promoting the acquisition of basic skills, including digital literacy and broadening opportunities for innovative, more flexible forms of learning. The aim is to provide people of all ages with equal and open acce ...
Voir le projet

 6

 TERMINÉ 
BioMOre describes a “New Mining Concept for Extracting Metals from Deep Ore Deposits using Biotechnology”. The concept is to use hydrofracturing for stimulation and bioleaching for winning of ores. The final process will consist of a so-called doublet, which is two deviated and parallel wells.In order to avoid high costs for drilling from the surface, the BioMOre approach is divided into two phase ...
Voir le projet

 25

 TERMINÉ 

Security In trusted SCADA and smart-grids (SCISSOR)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2017,

In traditional industrial control systems and critical infrastructures, security was implicitly assumed by the reliance on proprietary technologies (security by obscurity), physical access protection and disconnection from the Internet. The massive move, in the last decade, towards open standards and IP connectivity, the growing integration of Internet of Things technologies, and the disruptivenes ...
Voir le projet

 9

 TERMINÉ 
The INDIGO-DataCloud project (INDIGO for short) aims at developing a data/computing platform targeted at scientific communities, deployable on multiple hardware, and provisioned over hybrid (private or public) e-infrastructures. This platform will be built by leading European developers, resource providers, e-infrastructures and scientific communities in order to ensure its successful exploitation ...
Voir le projet

 27

 TERMINÉ 

Engaging the EGI Community towards an Open Science Commons (EGI-Engage)

Date du début: 1 mars 2015, Date de fin: 31 août 2017,

Over the last decade, the European Grid Infrastructure (EGI) has built a distributed computing and data infrastructure to support over 21,000 researchers from many disciplines with unprecedented data analysis capabilities. EGI builds on the European and national investments and relies on the expertise of EGI.eu - a not-for-profit foundation that provides coordination to the EGI Community, includin ...
Voir le projet

 43

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 
This is a project for higher education student and staff mobility between Programme Countries and Partner Countries. Please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 
Current communication standards and systems are not optimally prepared for their application in unpredictable environments which occur for example in serious disaster scenarios such as earthquakes or tsunamis. Cellular communications systems are planned using accurate/strict link budget allocation mechanisms, in order to keep the probability of outage in an acceptable range. The whole communicatio ...
Voir le projet

 10

 TERMINÉ 

Ultra Conductive Copper-Carbon Nanotube Wire (UltraWire)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2016,

The most common traditional materials used in electrical energy distribution systems are copper and copper alloys. Modern applications show an increasing demand for better heat and electric current carrying capacity at the level beyond copper base materials. Nanocarbon materials, such as carbon nanotubes and graphene have attracted attention due to their high electrical, thermal conductivity and e ...
Voir le projet

 14

 TERMINÉ 

Enabling Science and Technology through European Electron Microscopy (ESTEEM 2)

Date du début: 1 oct. 2012, Date de fin: 30 sept. 2016,

ESTEEM2 is an integrated infrastructure of electron microscopy facilities providing access for the academic and industrial research community in the physical sciences to some of the most powerful characterization techniques available at the nanoscale. Transnational access to ESTEEM2 centres is obtained through a transparent, simple peer review process based on merit and scientific priorities. Serv ...
Voir le projet

 18

 TERMINÉ 

PRACE - Third Implementation Phase Project (PRACE-3IP)

Date du début: 1 juil. 2012, Date de fin: 30 juin 2016,

PRACE-3IP supports the accelerated implementation of the pan-European HPC Research Infrastructure (RI) created in April 2010. It continues, complements, and extends the work of the PRACE-1IP and -2IP projects.PRACE-3IP addresses the computational and simulation needs of European scientific communities and of industry to keep them at the forefront of discovery. Our vision is the formation of an int ...
Voir le projet

 48

 TERMINÉ 
"The core concept of Accelerated Metallurgy is to deliver an integrated pilot-scale facility for the combinatorial synthesis and testing of many thousands of unexplored alloy formulations. This facility would be the first of its kind in the world and would represent a significant advance for metallurgy. The novel technology that enables this HTT facility is based on automated, direct laser deposit ...
Voir le projet

 34

 TERMINÉ 

Fast Reactor Experiments for hYbrid Applications (FREYA)

Date du début: 1 mars 2011, Date de fin: 29 févr. 2016,

"Building up on the former activities accomplished in the previous FPs, namely MUSE in FP5 and EUROTRANS in FP6, it is proposed in the FREYA project to extend the investigations of the subcritical configurations for validation of the methodology for on-line reactivity monitoring of ADS systems. The investigations will be related to the different subcriticality levels for the nominal operation mode ...
Voir le projet

 17

 TERMINÉ 

Integrated non-CO2 Greenhouse gas Observing System (INGOS)

Date du début: 1 oct. 2011, Date de fin: 31 déc. 2015,

InGOS will support and integrate the observing capacity of Europe for non-CO2 greenhouse gases (NCGHG: CH4, N2O, SF6, H2 and halocarbons). The emissions of these gases are very uncertain and it is unknown how future climate change will feedback into the land use coupled emissions of CH4 and N2O. The NCGHG atmospheric abundances will increase further in the future and the emissions of these gases a ...
Voir le projet

 39

 TERMINÉ 

Malopolska Researchers' Night 2014-2015 (Power2Nights)

Date du début: 1 mai 2014, Date de fin: 31 déc. 2015,

The project Malopolska Researchers' Night will be implemented in the years 2014 and 2015 respectively for the eighth and ninth time. The event has already permanently inscribed in the calendar of Malopolska scientific events, enjoying growing from year to year popular among participants and becoming one of the biggest Nights in Europe. In 2013, this event was attended by over 55 thousand people, w ...
Voir le projet

 13

 TERMINÉ 

Nanotechnology Education for Industry and Society (NANOEIS)

Date du début: 1 nov. 2012, Date de fin: 31 oct. 2015,

Nanotechnology is an emerging area with strong implications for European society and industry. It is a challenge for the education system to integrate this interdisciplinary and transsectoral subject into curricula shaped mostly along classical disciplines. NanoEIS will evaluate how nanotechnology education has been integrated into secondary schools and universities, how cooperations between diffe ...
Voir le projet

 9

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2014, Date de fin: 30 sept. 2015,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 
The strategic objective of NC2I-R is to structure the European public and private R&D capabilities for delivering a nuclear cogeneration demonstrator fully meeting the market needs, in support of the Nuclear Cogeneration European Industrial Initiative.Following the reference EUROPAIRS project and in close collaboration with the ongoing ARCHER project, national projects (e.g. Polish HTRPL, German S ...
Voir le projet

 22

 TERMINÉ 
VPH-Share will develop the organisational fabric (the infostructure) and integrate the optimised services to (1) expose and share data and knowledge, (2) jointly develop multiscale models for the composition of new VPH workflows, (3) facilitate collaborations within the VPH community. Four flagship workflows (from @neurIST, euHeart, VPHOP, Virolab) provide existing data, tools and models, engage w ...
Voir le projet

 20

 TERMINÉ 
"The recycling of end-of-life concrete into new concrete is one of the most interesting options for reducing worldwide natural resources use and emissions associated with the building materials sector. The production of the cement used in concrete, for example, is responsible for at least 5% of worldwide CO2 emissions. On-site reuse of clean silica aggregate from old concrete saves natural resourc ...
Voir le projet

 15

 TERMINÉ 
"The main goal of PROACTIVE is to research a holistic citizen-friendly multi sensor fusion and intelligent reasoning framework enabling the prediction, detection, understanding and efficient response to terrorist interests, goals and courses of actions in an urban environment. To this end, PROACTIVE will rely on the fusion of both static knowledge (i.e. intelligence information) and dynamic inform ...
Voir le projet

 10

 TERMINÉ 

Parallel Patterns for Adaptive Heterogeneous Multicore Systems (ParaPhrase)

Date du début: 1 oct. 2011, Date de fin: 31 mars 2015,

A revolution is happening in computer hardware. After three decades during which microprocessor speeds increased almost 4000 times, we are starting to hit long-predicted physical limits on the speed of a single processor. Recent computers instead use two, four or even twelve processor cores working together ``in parallel'', giving peak performance that is equivalent to a 5GHz, 10GHz or even 30GHz ...
Voir le projet

 13

 TERMINÉ 
"This project will develop innovative in situ remediation concepts for the sustainable management of contaminated land and groundwater, as required by the WFD. The proposal has 18 academic and industry partners, with expertise in groundwater remediation issues, ranging from pore-scale processes to field-scale application, as well as technology development, water management/treatment, regulation an ...
Voir le projet

 10

 TERMINÉ 
In line with the Sustainable Nuclear Energy Technology Platform (SNETP) Strategic Research Agenda (SRA) and Deployment Strategy (DS), the ARCHER project will extend the state-of-the-art European (V)HTR technology basis with generic technical effort in support of nuclear cogeneration demonstration.The partner consortium consists of representatives of conventional and nuclear industry, utilities, Te ...
Voir le projet

 34

 TERMINÉ 

Advanced European Infrastructures for Detectors at Accelerators (AIDA)

Date du début: 1 févr. 2011, Date de fin: 31 janv. 2015,

AIDA (http://cern.ch/aida) addresses the upgrade, improvement and integration of key research infrastructures in Europe, developing advanced detector technologies for future particle accelerators, as well as transnational access to facilities that provide these research infrastructures.In line with the European Strategy for Particle Physics, AIDA targets the infrastructures needed for R&D, prototy ...
Voir le projet

 39

 TERMINÉ 
Scientific research is no longer conducted within national boundaries and is becoming increasing dependent on the large-scale analysis of data, generated from instruments or computer simulations housed in trans-national facilities, by using e Infrastructure (distributed computing and storage resources linked by high-performance networks).The 48 month EGI-InSPIRE project will continue the transitio ...
Voir le projet

 143