Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Deep sub-micron microprocessor for spAce rad-Hard appLIcation Asic (DAHLIA)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

...ng cost and mass and boosting competitiveness of future European space equipments.With the highest cumulative number of European satellites and electronics equipments successfully operating in orbit, Airbus and TAS represent together the indisputable best positioned companies in Europe to ensure the maximum relevance of the DAHLIA SoC for its future use by the whole European Space community. Beyon ...
Voir le projet

 7

 TERMINÉ 

Validation of European high capacity rad-hard FPGA and software tools (VEGAS)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2018,

VEGAS proposes to address the key challenge of European non-dependence and competitivness regarding rad-hard FPGA for space applications. VEGAS will evaluate (following ESCC rules) and validate the first rad-hard FPGA in 65nm to directly compete with the US offering and reach TRL 7. The VEGAS project sets clear and measurable main objectives to reach a TRL 7 from TRL 5 (end of BRAVE project) as fo ...
Voir le projet

 11

 TERMINÉ 

AErial RObotic System for In-Depth Bridge Inspection by Contact (AEROBI)

Date du début: 1 déc. 2015, Date de fin: 30 nov. 2018,

The latest developments in low flying unmanned robots with arms and the associated fields of intelligent control, computer vision and sensors open the floor for robotic solutions, exploitable in the near term, in the field of inspection of difficult-toaccess areas of the civil infrastructure in general and bridges in particular. The latter infrastructure is ageing requiring inspection and assessme ...
Voir le projet

 11

 TERMINÉ 

Speaker Identification Integrated Project (SIIP)

Date du début: 1 mai 2014, Date de fin: 30 avr. 2018,

SIIP is a break-through Suspect Identification solution based on a novel Speaker-Identification (SID) engine fusing multiple speech analytic algorithms (e.g. voiceprints recognition, Gender/Age/Language/Accent ID, Keyword/ Taxonomy spotting and Voice cloning detection). This Fused Speaker Identification will result in significantly higher true-positive speaker identification, reduced False-Positiv ...
Voir le projet

 20

 TERMINÉ 

SATELLITE-BASED ADS-B FOR LOWER SEPARATION-MINIMA APPLICATION (SALSA) (SALSA)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2018,

SALSA is an exploratory research project relating to multi-source ADS-B system.A multi-source ADS-B system that combines the benefit of all possible type of relays (space, maritime, air or ground based) of ADS-B messages could provide a global surveillance system to overcome the prevailing continuous surveillance constraints in the non-radar airspace (NRA). By bringing Space based ADS-B with othe ...
Voir le projet

 6

 TERMINÉ 

Snapshot spEctral imagEr for cost effective IR Surveillance (SEERS)

Date du début: 1 févr. 2015, Date de fin: 31 janv. 2018,

SEERS proposes a breakthrough approach to multispectral imaging in a broad band of the infrared domain (0.7-14 µm wavelength). Video surveillance for safety and security is targeted for demonstration.Firstly, a snapshot multispectral imager in the IR domain will be developed. Secondly, an embedded approach will be adopted for image reconstruction, cognitive image fusion, video pre-processing and ...
Voir le projet

 9

 TERMINÉ 

Hybrid Propulsion Module for transfer to GEO orbit (HYPROGEO)

Date du début: 1 févr. 2015, Date de fin: 31 janv. 2018,

Independent access to space is a key component of the European Space Policy. The competition is increasing in this area both for the full launching systems and the key subsystems. Cost-effectiveness becomes the main driving factor.HYPROGEO ambition is to study a propulsion module based on Hybrid chemical propulsion. Hybrid propulsion is not a new technology but its application to a transfer module ...
Voir le projet

 15

 TERMINÉ 

THINGS2DO (THINGS2D0)

Date du début: 1 janv. 2014, Date de fin: 1 janv. 2018,

Develop the FDSOI ecosystem in Europe, beyond the PLACES2BE Pilot Line, in order to increase the impact of this European technology. At the time of set up of the first KET pilot line the proof of FDSOI was mainly technological. In between then and now, the first realization of a complex silicon chip in FDSOI has shown to the worldwide microelectronics community the capabilities of this technology. ...
Voir le projet

 44

 TERMINÉ 

A Low Cost Active Debris Removal Demonstration Mission (REMOVEDEBRIS)

Date du début: 11 nov. 2013, Date de fin: 11 nov. 2017,

A huge amount of debris has progressively been generated since the beginning of the space era. Most of the objects launched into space are still orbiting the Earth and today these object and their by-products represent a threat both in space and on Earth. In Space, debris lead to collisions and therefore to damages to operational satellites. For both issues, a credible solution has emerged over th ...
Voir le projet

 11

 TERMINÉ 
The QB50 Project will demonstrate the possibility of launching a network of 50 CubeSats built by CubeSat teams from all over the world to perform first-class science and in-orbit demonstration in the largely unexplored middle and lower thermosphere. Space agencies are currently not pursuing a multi-spacecraft network for in-situ measurements in the middle and lower thermosphere because the cost of ...
Voir le projet

 17

 TERMINÉ 

Science and Technology for Near-Earth Object Impact Prevention (NEOShield-2)

Date du début: 1 mars 2015, Date de fin: 30 sept. 2017,

Impacts of near-Earth objects (NEOs) have contributed to mass extinctions and evolution, and it is a proven fact that NEOs will continue to hit the Earth at irregular intervals in the future, with the potential for catastrophic damage to life and property. With the experience and results gained from the NEOShield project we are now very well equipped to address all aspects of this call, including ...
Voir le projet

 12

 TERMINÉ 

Global ATM security management (GAMMA)

Date du début: 1 sept. 2013, Date de fin: 31 août 2017,

The GAMMA project stems from the recognition that while the SESAR initiative is effectively addressing some security issues in the new global ATM scenarios, there is a need to extend this scope to ensure a comprehensive assessment of the full set of security threats and vulnerabilities affecting ATM, considered as a system of systems and covering operational as well as technological aspects. In ad ...
Voir le projet

 23

 TERMINÉ 
"In a disaster situation three things contribute to a success: having the right resource available in the shortest time, with the highest relevance and at the right location.Access to necessary information, communication with other rescuers and stakeholders as well as the availability of resources are key factors in minimizing damage and loss of life.Large scale disasters and crisis situations inc ...
Voir le projet

 13

 TERMINÉ 
SecInCoRe will design a Secure Dynamic Cloud based concept for Information, Communication and Resource Interoperability including information exchange and access to a ‘common information space’. This will be based on a pan-European disaster inventory focusing on specific artefacts of response to regional, national as well as cross European emergencies and disasters. SecInCoRe develops models for s ...
Voir le projet

 8

 TERMINÉ 

Dependable Embedded Wireless Infrastructure (DEWI)

Date du début: 1 mars 2014, Date de fin: 28 févr. 2017,

DEWI (dependable embedded wireless infrastructure) envisions to significantly foster Europe’s leading position in embedded wireless systems and smart (mobile) environments such as vehicles, railway cars, airplanes and buildings. These environments comprise wireless sensor networks and wireless applications for citizens and professional users. Therefore the consortium introduces the concept of a “s ...
Voir le projet

 61

 TERMINÉ 

Inter System Interoperability for Tetra-TetraPol Networks (ISITEP)

Date du début: 1 sept. 2013, Date de fin: 31 déc. 2016,

A European network where forces share communications, processes and a legal framework would greatly enforce response to disaster recovery and security against crime. Until now, uncertainty on costs, timescale and functionalities has slowed down integration of national Public Protection & Disaster Relief (PPDR) networks. The lack of interoperable communication systems has impeded the cooperation of ...
Voir le projet

 19

 TERMINÉ 
...udy the portability to European latest and highest performance hardened semiconductor technology (STM65nm)This is achieved by the collaboration of the most experienced companies in this field, namely Airbus Defence and Space (G, F) for specific heritage on high reliable and radiation hardened systems, ARM (UK) providing its excellence in processor core IPs and know-how in this field of development ...
Voir le projet

 6

 TERMINÉ 
The latest developments in robotics and the associated fields of computer vision and sensors open the floor for automated robotic solutions, exploitable in the near to medium term in the field of inspection of the civil infrastructure in general and transportation tunnel infrastructure in particular. The latter infrastructure is ageing urgently requiring inspection and assessment. Presently, inspe ...
Voir le projet

 11

 TERMINÉ 
HoliDes addresses development and qualification of Adaptive Cooperative Human-Machine Sys-tems (AdCoS) where many humans and many machines act together, cooperatively, in a highly adaptive way. They adapt to each other and to the context to guarantee fluent and cooperative task achievement. Such systems with higher levels of automation are urgently needed to enhance safety and to increase the conf ...
Voir le projet

 32

 TERMINÉ 
"Public Protection and Disaster Relief (PPDR) agencies in EC member states are relying on digital Private Mobile Radio (PMR) networks for mission-critical voice and data communication. These networks are highly resilient and properly dimensioned to cope with crisis and emergency handling, and are well protected against monitoring and intrusion by means of encryption, authentication and integrity. ...
Voir le projet

 18

 TERMINÉ 
Description Dem@Care aspires to contribute to the timely diagnosis, assessment, maintenance and promotion of self-independence of people with dementia, by deepening the understanding of how the disease affects their everyday life and behaviourIt implements a multi-parametric closed-loop remote management solution that affords adaptive feedba ...
Voir le projet

 13

 TERMINÉ 

Secure idenTity acrOss boRders linKed 2.0 (STORK 2.0)

Date du début: 1 avr. 2012, Date de fin: 30 sept. 2015,

"Secure idenTity acrOss boRders linKed 2.0" builds on the success and results of STORK by taking further steps to decisively push the lines for wider uptake of eID in Europe, aiming at realising a single European electronic identification & authentication area. Its highly innovative focus lies on the convergence of private and public sectors in an operational framework and infrastructure encompass ...
Voir le projet

 65

 TERMINÉ 

Holistic Approaches for Integrity of ICT-Systems (HINT)

Date du début: 1 oct. 2012, Date de fin: 30 sept. 2015,

The security of modern ICT (Information and Communication Technologies) systems relies fundamentally on the integrity of hardware components. This is the case for user identification and authentication as in smartcards, e-Id, e-Passports, e-health devices or for the integrity checking of computers and mobile systems as in trusted computing and TPMs. But it is also the case for telecommunication i ...
Voir le projet

 9

 TERMINÉ 
"European Space industry demand for lighter and cheaper launcher transport systems. The proposed project DESICOS contributes to these aims by a new design approach for imperfection sensitive composite launcher structures, exploiting the worst imperfection idea efficiently: the Single Perturbation Load Approach. Currently, imperfection sensitive shell structures prone to buckling are designed accor ...
Voir le projet

 13

 TERMINÉ 
PERSEUS contributes to Europe’s efforts to monitor illegal migration and combat related crime and goods smuggling by proposing a large scale demonstration of a EU Maritime surveillance System of Systems, on the basis of existing national systems and platforms, enhancing them with innovative capabilities and moving beyond EUROSUR’s 2013 expectations, addressing key challenges: supporting the netwo ...
Voir le projet

 35

 TERMINÉ 

A Global Approach to Near-Earth Object Impact Threat Mitigation (NEOSHIELD)

Date du début: 1 janv. 2012, Date de fin: 31 mai 2015,

Collisions of asteroids and comets with the Earth have taken place frequently over geological history and have altered the evolutionary course of life; there is no reason why they should not continue to hit the Earth at irregular and unpredictable intervals in the future. Thousands of near-Earth objects (NEOs), mainly asteroids, have been discovered over the past 20 years and the reality of the im ...
Voir le projet

 13

 TERMINÉ 

European CYber Security Protection Alliance (CYSPA)

Date du début: 1 oct. 2012, Date de fin: 31 mars 2015,

The goal of CYSPA is to address trustworthy ICT through a European strategy to protect cyberspace, with target audiences ranging from research communities and industry to public authorities and infrastructure operators.This goal builds on the analysis that the entire cyberspace which embodies our connected society has been created by technology but evolving towards trustworthy ICT requires taking ...
Voir le projet

 21

 TERMINÉ 

AXES - Access to Audiovisual Archives (AXES)

Date du début: 1 janv. 2011, Date de fin: 31 mars 2015,

The goal of AXES is to develop tools that provide various types of users with new engaging ways to interact with audiovisual libraries, helping them discover, browse, navigate, search and enrich archives. In particular, apart from a search-oriented scheme, we will explore how suggestions for audiovisual content exploration can be generated via a myriad of information trails crossing the archive. T ...
Voir le projet

 13

 TERMINÉ 
The EMPhAtiC objective is to develop, evaluate and demonstrate the capability of enhanced multicarrier techniques to make better use of the existing radio frequency bands in providing broadband data services in coexistence with narrowband legacy services. The project will address the Professional Mobile Radio (PMR) application, especially the evolution of the Public Protection & Disaster Relief (P ...
Voir le projet

 13

 TERMINÉ 
The aim of this proposal is the development of TPS for their use in space applications with extreme oxidative environments and high temperature resistance, such as hot parts of space vehicles for orbital entry (ARV), planetary probes and NEO exploration. Previous studies on ARV vehicle have shown that TPS hybrid systems based on ablators integrated with thermo-structural materials are good candida ...
Voir le projet

 12

 TERMINÉ 

Deployable SAR Integrated Chain with Unmanned Systems (DARIUS)

Date du début: 1 mars 2012, Date de fin: 28 févr. 2015,

Unmanned systems through military programs and numerous R&D projects are now becoming operationally mature. Their use in Search and Rescue operations can now be envisaged to enhance first responder capabilities and intervene in hazardous areas. For cost and procedural reasons however, the market is still very fragmented and business models are unclear.The DARIUS project will leverage previous R&D ...
Voir le projet

 14

 TERMINÉ 

An early stage training network in enabling technologies for GREEN radio (GREENET)

Date du début: 1 janv. 2011, Date de fin: 31 déc. 2014,

Current 4G vision envisages higher data rates and multi standard radio interfaces to provide all users with a continuous seamless connection. The large number of foreseen devices coupled with the surge in power requirements for future emerging handsets raises significant challenges in terms of: i) reducing the energy consumption; and ii) reducing the amount of electromagnetic radiations.GREENET ta ...
Voir le projet

 10

 TERMINÉ 
The objective of PRACTICE project is to improve the preparedness and resilience of the EU member states and associated countries to an attack from a terrorist group using non conventional weapons such as CBRN (Chemical, Biological, Radiological and/or Nuclear agents) materials. The existing situation is characterized by a fragmented structure as regards technology, procedures, methods and organiza ...
Voir le projet

 28

 TERMINÉ 

Sea Border Surveillance (SeaBILLA)

Date du début: 1 juin 2010, Date de fin: 28 févr. 2014,

The SeaBILLA proposal aims to 1) define the architecture for cost-effective European Sea Border Surveillance systems, integrating space, land, sea and air assets, including legacy systems; 2) apply advanced technological solutions to increase performances of surveillance functions; 3) develop and demonstrate significant improvements in detection, tracking, identification and automated behaviour an ...
Voir le projet

 29

 TERMINÉ 

Reducing the Vulnerability of Space Systems (ReVuS)

Date du début: 1 mars 2011, Date de fin: 31 déc. 2013,

It is accepted that space debris will increase in the nextdecades despite any considerable effort made to limit their generation.Debris of more than 10cm can be avoided by the satellites and also thevery small particles of less than 0.1cm are taken into account in thecurrent designs. The debris from 0.1 to 10cm is however not predictable,not taken into account today and could severely damage a spa ...
Voir le projet

 11

 TERMINÉ 

Long-Term Advanced Propulsion Concepts and Technologies II (LAPCAT-II)

Date du début: 1 oct. 2008, Date de fin: 31 déc. 2013,

"Lacpat II is a logical follow-up of the previous EC-project which has as objective to reduce antipodal flights to less than 2 to 4 hours. Among the several studied vehicles, only two novel aircraft for a Mach 5 and 8 flight are retained in the present proposal. Starting from the available Mach 5 vehicle and its related precooled turboramjet, assumed performance figures of different components ...
Voir le projet

 16

 TERMINÉ 
"VIRTUOSO projects aims at providing European Security stakeholders with a toolkit based on an open-source-software framework and a set of advanced information processing tools. This toolkit will allow building end-user oriented applications: - Ranging from open source collection to decision support - Providing at each step actionable, rated, validated information - Integrated in an open framework ...
Voir le projet

 19

 TERMINÉ 
"The main problem of First Responders (FR) (fire fighters, police, etc...) in case of crisis at critical infrastructures are the loss of communication and location and the lack of information about the environment (temperature, hazardous gases,etc.). Therefore, during the intervention, there is a gap between the First responders' situation (positioning, health,etc) and the overall view of at their ...
Voir le projet

 11

 TERMINÉ 

Aftermath Crisis Management System-of-systems Demonstration (ACRIMAS)

Date du début: 1 févr. 2011, Date de fin: 31 mai 2012,

"Crisis management (CM) is a core capability of modern societies, but a highly diversified and heterogeneous area. Current CM in the EU can be regarded as a “system-of-systems” integrating diverse organisations and components with different cultures, policies and assets, and various stakeholders and procurement schemes. ACRIMAS understands the term “system-of-systems” that it incorporates technolo ...
Voir le projet

 15

 TERMINÉ 

EUropean software defined radio for WireLEss in joint secuRity operations (EULER)

Date du début: 1 mars 2009, Date de fin: 30 avr. 2012,

The EULER project proposal gathers major players in Europe in the field of wireless systems communication integration and software defined radio (SDR), is supported by a strong group of end-users, and aims to define and actually demonstrate how the benefits of SDR can be leveraged in order to drastically enhance interoperability and fast deployment in case of crisis needed to be jointly resolved. ...
Voir le projet

 19