Rechercher des projets européens

22 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Lubricant impregnated slippery surfaces (LubISS)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2020,

LubISS, Lubricant Impregnated Slippery Surfaces, is the first European Training Network with the main objectives of designing, characterizing, and modelling low adhesive easy-to-clean surfaces for anti-icing and anti-fouling. In a coordinated effort among 9 world-class academic institutions and industrial partners from 6 European countries (Finland, France, Germany, Great Britain, Netherlands, Swi ...
Voir le projet

 9

 TERMINÉ 
Effective EU support to a large external crisis requires new approaches. In response to this challenge and to identified user and market needs from previous projects, Reaching Out proposes an innovative multi-disciplinary approach that will optimize the efforts, address a wide spectrum of users and maximize market innovation success.This approach results in five main objectives: to1. Develop a Col ...
Voir le projet

 29

 TERMINÉ 
ENABLE-S3 will pave the way for accelerated application of highly automated and autonomous systems in the mobility domains automotive, aerospace, rail and maritime as well as in the health care domain. Virtual testing, verification and coverage-oriented test selection methods will enable validation with reasonable efforts. The resulting validation framework will ensure Europeans Industry competiti ...
Voir le projet

 76

 TERMINÉ 

European Space Robot Control Operating System (ESROCOS)

Date du début: 1 nov. 2016, Date de fin: 31 janv. 2019,

The ESROCOS activity is devoted to the design of a Robot Control Operating Software (RCOS) that can provide adequate features and performance with space-grade Reliability, Availability, Maintainability and Safety (RAMS) properties. The goal of the ESROCOS proposal is to provide an open source framework which can assist in the generation of flight software for space robots. By providing an open sta ...
Voir le projet

 10

 TERMINÉ 
"In a disaster situation three things contribute to a success: having the right resource available in the shortest time, with the highest relevance and at the right location.Access to necessary information, communication with other rescuers and stakeholders as well as the availability of resources are key factors in minimizing damage and loss of life.Large scale disasters and crisis situations inc ...
Voir le projet

 13

 TERMINÉ 

European Control System Security Incident Analysis Network (ECOSSIAN)

Date du début: 1 juin 2014, Date de fin: 31 mai 2017,

The protection of critical infrastructures increasingly demands solutions which support incident detection and management at the levels of individual CI, across CIs which are depending on each other, and across borders. An approach is required which really integrates functionalities across all these levels. Cooperation of privately operated CIs and public bodies (governments and EU) is difficult b ...
Voir le projet

 22

 TERMINÉ 

Process Line Implementation for Applied Surface Nanotechnologies (PLIANT)

Date du début: 1 févr. 2013, Date de fin: 31 janv. 2017,

In this proposed integrating project we will develop innovative in-line high throughput manufacturing technologies which are all based on atmospheric pressure (AP) vapour phase surface and on AP plasma processing technologies. Both approaches have significant potential for the precise synthesis of nano-structures with tailored properties, but their effective simultaneous combination is particularl ...
Voir le projet

 24

 TERMINÉ 

Inter System Interoperability for Tetra-TetraPol Networks (ISITEP)

Date du début: 1 sept. 2013, Date de fin: 31 déc. 2016,

A European network where forces share communications, processes and a legal framework would greatly enforce response to disaster recovery and security against crime. Until now, uncertainty on costs, timescale and functionalities has slowed down integration of national Public Protection & Disaster Relief (PPDR) networks. The lack of interoperable communication systems has impeded the cooperation of ...
Voir le projet

 19

 TERMINÉ 

Initiative Towards sustAinable Kerosene for Aviation (ITAKA)

Date du début: 1 nov. 2012, Date de fin: 31 oct. 2016,

ITAKA project is expected to support the development of aviation biofuels in an economically, socially, and environmentally sustainable manner, improving the readiness of existing technology and infrastructures. This will be achieved through the first of its kind collaborative project in the EU, that will develop a full value-chain in Europe to produce sustainable drop-in Hydroprocessed Esters and ...
Voir le projet

 16

 TERMINÉ 
Landmines and the cluster munitions still kill or maim civilians every day in an indiscriminate manner even long after conflicts are over. At the current rate of clearance of about 500,000 mines per year and assuming no additional mines are laid from now on, it could still take hundreds of years to find and clear all the landmines around the world.D-BOX will tackle the burning issue of anti-person ...
Voir le projet

 24

 TERMINÉ 

Environmental Sensors for Energy Efficiency (ESEE)

Date du début: 1 avr. 2013, Date de fin: 31 mars 2016,

ESEE – Environment Sensors for Energy Efficiency targets the markets, were with highly reliable information regarding environmental conditions measures can be deducted, which safe the use of energy. The research will be performed on several different sensor technoglogy approaches and finally validated in a test environment, e.g. under the environmental conditions of an aircraft. In addition an app ...
Voir le projet

 27

 TERMINÉ 

AIRBorne information for Emergency situation Awareness and Monitoring (AIRBEAM)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2015,

The AIRBEAM project proposes a situation awareness toolbox for the management of crisis over wide area taking benefit of an optimised set of aerial (unmanned) platforms, including satellites.The number of unmanned air- and space-borne platform available and their associated sensors present a new set of challenges to end users involved in the effective management of emergencies and actions of law e ...
Voir le projet

 24

 TERMINÉ 
"Comfort plays an increasingly important role in the interior design of airplanes. Comfort comprises many aspects including temperature and lighting in the cabin. In this context, the overall objective of the IN-LIGHT project is to contribute to the improvement of the passengers comfort through the development of a new concept of bifunctional aircraft window combining two technologies: Electrochro ...
Voir le projet

 12

 TERMINÉ 

Modular CMOS Photonic Integrated Micro-Gyroscope (MERMIG)

Date du début: 1 nov. 2012, Date de fin: 31 oct. 2015,

Space system vendors seek for solutions to deliver small size and cost-effective sensor systems to “de-congest” satellite payloads, drastically reduce the equipment cost and open the possibility for new generation of micro-payload systems. MERMIG aims to provide this technology replacing current expensive, bulky, heavy and power-consuming fiber optic gyroscopes (FOGs). To address these key challen ...
Voir le projet

 8

 TERMINÉ 

Modelling crisis management for improved action and preparedness (CRISMA)

Date du début: 1 mars 2012, Date de fin: 31 août 2015,

"The CRISMA project shall develop a simulation-based decision support system (Integrated Crisis Management System - ICMS), for modelling crisis management, improved action and preparedness. The ICMS shall facilitate simulation and modelling of realistic crisis scenarios, possible response actions, and the impacts of crisis depending on both the external factors driving the crisis development and t ...
Voir le projet

 19

 TERMINÉ 
PERSEUS contributes to Europe’s efforts to monitor illegal migration and combat related crime and goods smuggling by proposing a large scale demonstration of a EU Maritime surveillance System of Systems, on the basis of existing national systems and platforms, enhancing them with innovative capabilities and moving beyond EUROSUR’s 2013 expectations, addressing key challenges: supporting the netwo ...
Voir le projet

 35

 TERMINÉ 

Developing Novel Fire-Resistant High Performance Composites (FIRE-RESIST)

Date du début: 1 févr. 2011, Date de fin: 31 janv. 2015,

The greater use of polymer matrix composite materials would be highly desirable. Their low weight, along with their inherent resistance to corrosion and fatigue, enables more fuel efficient and sustainable transport structures. However, for many applications, the biggest factor currently preventing the more widespread use of light high-performance polymer matrix composites is their poor fire perfo ...
Voir le projet

 20

 TERMINÉ 

OPtimisation for low Environmental Noise impact AIRcraft (OPENAIR)

Date du début: 1 avr. 2009, Date de fin: 30 sept. 2014,

Reducing noise from aircraft operations perceived by airport neighbouring communities is a major challenge facing the aircraft manufacturing industry, social society and the air transport business. By adopting a whole aircraft approach based on the latest developments in active / adaptive technologies, flow control techniques and advances in computational aero-acoustics applied to the major causes ...
Voir le projet

 51

 TERMINÉ 

Flash Optical Sensor for Terrain Relative Robotic Navigation (FOSTERNAV)

Date du début: 1 janv. 2011, Date de fin: 31 mai 2014,

"The general goal of the project is to develop an innovative solution for spacecrafts' Guidance Navigation and Control (GNC) sensor for relative navigation. It is a contribution to the strengthening of the European position for space exploration. It targets the improvement of the accuracy and robustness of spacecraft position and attitude control to, for example, land softly and precisely sensitiv ...
Voir le projet

 6

 TERMINÉ 

Reduced Certification Costs for Trusted Multi-core Platforms (RECOMP)

Date du début: 1 avr. 2010, Date de fin: 31 mars 2013,

"The proposed RECOMP (Reduced certification cost for trusted multi-core platforms) research project will establish methods, tools and platforms for enabling cost-efficient certification and re-certification of safety-critical systems and mixed-criticality systems, i.e. systems containing safety-critical and non-safety-critical components.RECOMP recognizes the fact that the increasing processing po ...
Voir le projet

 40

 TERMINÉ 

Cost Efficient Advanced Leading Edge Structure 2 (COALESCE2)

Date du début: 1 avr. 2009, Date de fin: 31 mai 2012,

"The objective is to develop new integrated technology and design concepts for fixed leading edge structure to achieve greater than 30% reduction in recurring manufacturing and assembly cost compared to to-day’s highly fabricated structure. The Project will explore material and processing technology options for both metallic and composite structural solutions that will result in preferred concepts ...
Voir le projet

 9

 TERMINÉ 

EUropean software defined radio for WireLEss in joint secuRity operations (EULER)

Date du début: 1 mars 2009, Date de fin: 30 avr. 2012,

The EULER project proposal gathers major players in Europe in the field of wireless systems communication integration and software defined radio (SDR), is supported by a strong group of end-users, and aims to define and actually demonstrate how the benefits of SDR can be leveraged in order to drastically enhance interoperability and fast deployment in case of crisis needed to be jointly resolved. ...
Voir le projet

 19