Rechercher des projets européens

14 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

MARINE environmental in situ Assessment and monitoring tool BOX (MARIABOX)

Date du début: 1 févr. 2014, Date de fin: 31 janv. 2018,

"MariaBox will develop a wireless marine environment analysis device for monitoring chemical and biological pollutants while installed into a buoy, a maritime means of transport or a mooring. The device, based on novel biosensors, will be of high-sensitivity, portable and capable of repeating measurements over a long time, allowing permanent deployment at sea. The word “MARIA” is the plural of the ...
Voir le projet

 13

 TERMINÉ 
The goal of AUDITOR is the implementation of novel precise-positioning techniques based on augmentation data in custom GNSS receivers to improve the performance of current augmentation services and reducing costs. These techniques are already patented by the consortium and proven to offer better accuracy with faster convergence times than solutions commercially available. More sophisticated atmosp ...
Voir le projet

 7

 TERMINÉ 

GNSS/INS Low-cost Attitude Determination and navigation system - Phase 2 (GLAD-2)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2017,

...el to the regulation harmonisation in Europe, thus fostering this niche market, mainly in the civilian professional sector, for precision accuracy and/or magnetic interference sensitive applications. ACORDE expects to reach the 5% European market share, offering this product to autopilot/sensor developers, UAS integrators and UAS manufacturers, what will imply a cumulative turnover of 8.5M€ and cu ...
Voir le projet

 1

 TERMINÉ 

Trusted Vessel Information from Trusted On-board Instrumentation (TRITON)

Date du début: 1 déc. 2013, Date de fin: 31 mars 2016,

A new consciousness has arisen in the scenario of civilian and commercial maritime control: surveillance and safety systems may be under the attack of intentional or unintentional or malevolent players, whose aim (or effect) is to bypass or mystify the control system to obtain economic gain. The advances of mass-price technology, easily sold over the Internet, make this kind of potential events a ...
Voir le projet

 6

 TERMINÉ 

GNSS/INS Low-Cost Attitude Determination System (GLAD)

Date du début: 1 oct. 2014, Date de fin: 31 mars 2015,

The objective of GLAD Phase 1 is the study of the commercial feasibility of a low-cost attitude determination and navigation system based on non-dedicated mass market GNSS receivers and antennas aided by MEMS sensors.The fusion of GNSS and inertial data takes advantage of the complementarity of these two technologies to achieve accurate and reliable navigation: inertial sensors provide excellent d ...
Voir le projet

 1

 TERMINÉ 

New embedded Systems arcHItecturE for multi-Layer Dependable solutions (nSHIELD)

Date du début: 1 sept. 2011, Date de fin: 31 déc. 2014,

The nSHIELD project is, at the same time, a complement and an improvement of “pSHIELD”, a pilot project funded in ARTEMIS Call 2009 as the first investigation to build the SHIELD Architectural Framework for SPD. The roadmap proposed in this pilot project aims at addressing Security, Privacy and Dependability (SPD) in the context of Embedded Systems (ESs) as “built in” rather than as “add-on” funct ...
Voir le projet

 24

 TERMINÉ 

"Bottom Up selection, collection and management of URBAn waste" (BURBA)

Date du début: 1 janv. 2011, Date de fin: 31 déc. 2013,

"The aim of the BURBA project is to develop an automatic system to be used for intelligent waste management. The system consists of intelligent waste containers and an IT tool for waste collection and transport management, including RFID’s (Radio Frequency Identification) ability to reliably identify individual receptacles, users, single marked items or waste categories, and cell-phone-based LBS’ ...
Voir le projet

 10

 TERMINÉ 

Wireless Hybrid Enhanced Mobile Radio Estimators - Phase 2 (WHERE2)

Date du début: 1 juil. 2010, Date de fin: 31 oct. 2013,

The availability of position information plays an increasing role in wireless communications networks already today and will be an integral part of future systems. They inherently can offer the ability for stand-alone positioning especially in situations where conventional satellite based positioning systems such as GPS fail (e.g., indoor). In this framework, positioning information is an importan ...
Voir le projet

 17

 TERMINÉ 

Cooperative Hybrid Objects in SEnsor Networks (CHOSEN)

Date du début: 1 juin 2008, Date de fin: 30 nov. 2011,

CHOSeN will develop appropriate technology, including advanced configurable RF and digital baseband transceiver hardware, networking protocols with scalable Quality of Service in respect of transmission speed, robustness, security, and low-power support, and a generic collaboration middleware that abstracts from the diversity and heterogeneity provided by the layers below, and it will thereby impr ...
Voir le projet

 11

 TERMINÉ 
-
Voir le projet

 17

 TERMINÉ 
Description EUWB – Coexisting Short Range Radio by Advanced Ultra-Wideband Radio TechnologyMain ObjectivesEUWB is an industry-led initiative of 21 major industrial and excellent academic organisations all around Europe and Israel. Its key objective is to explore the enormous economic potential of innovative and disruptive radio technology ...
Voir le projet

 28

 TERMINÉ 

Galileo Ready Advanced Mass MArket Receiver (GRAMMAR)

Date du début: 1 févr. 2009, Date de fin: 31 juil. 2011,

"Building on the success of FP6 projects, in particular the GREAT project, GRAMMAR seeks to address the mass market receiver by extending the current state-of-the-art technologies for the mass market segment.Specifically, we are addressing the following gaps identified as obstacles for producing high-quality mass market receivers:• No economic solutions for accurate dual-frequency RF and baseband ...
Voir le projet

 3

 TERMINÉ 
Current two big trends in wireless communications are the development of new broadband component and the integration of heterogeneous wireless networks, to achieve the vision f the so-called 4G network.The FUTON project addresses both issues by proposing the development of a hybrid fiber-radio infrastructure transparently connecting remote antenna units to a central unit where a joint processing c ...
Voir le projet

 17

 TERMINÉ 

Wireless Hybrid Enhanced Mobile Radio Estimators (WHERE)

Date du début: 1 janv. 2008, Date de fin: 30 juin 2010,

To increase ubiquitous and mobile network access and data rates, scientific and technological development is more and more focussing on the integration of radio access networks (RANs). For an efficient usage of RANs, knowledge of the position of mobile terminals (MTs) is valuable information in order to allocate resources or predict the allocation within a heterogeneous RAN infrastructure.The main ...
Voir le projet

 16