Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Readiness of ICOS for Necessities of integrated Global Observations (RINGO)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2020,

The proposed project “Readiness of ICOS for Necessities of integrated Global Observations” (RINGO) aims to further development of ICOS RI and ICOS ERIC and foster its sustainability. The challenges are to further develop the readiness of ICOS RI along five principal objectives: 1. Scientific readiness. To support the further consolidation of the observational networks and enhance their quality. Th...
Voir le projet

 26

 TERMINÉ 

HOLIstic optimisation of SHIP design and operation for life cycle (HOLISHIP)

Date du début: 1 sept. 2016, Date de fin: 31 août 2020,

Most maritime products are typically associated with large investments and are seldom built in large series. Where other modes of transport benefit from the economy of series production, this is not the case for maritime products which are typically designed to refined customer requirements increasingly determined by the need for high efficiency, flexibility and low environmental impact at a compe...
Voir le projet

 39

 TERMINÉ 

Smart Automation of Rail Transport (SMART)

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2019,

SMART main goal is to increase the quality of rail freight, as well as its effectiveness and capacity, through the contribution to automation of railway cargo haul at European railways.In order to achieve the main goal, SMART will deliver the following measurable objectives:• complete, safe and reliable prototype solution for obstacle detection and initiation of long distance forward-looking braki...
Voir le projet

 5

 TERMINÉ 
ENVRIPLUS is a cluster of research infrastructures (RIs) for Environmental and Earth System sciences, built around ESFRI roadmap and associating leading e-infrastructures and Integrating Activities together with technical specialist partners. ENVRIPLUS is driven by 3 overarching goals: 1) favoring cross-fertilization between infrastructures, 2) implementing innovative concepts and devices across R...
Voir le projet

 37

 TERMINÉ 
StratoClim will produce more reliable projections of climate change and stratospheric ozone by a better understanding and improved representation of key processes in the Upper Troposphere and Stratosphere (UTS). This will be achieved by an integrated approach bridging observations from dedicated field activities, process modelling on all scales, and global modelling with a suite of chemistry clima...
Voir le projet

 30

 TERMINÉ 

European Clearing House for Open Robotics Development Plus Plus (ECHORD Plus Plus)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2018,

Description ECHORD++ will create new opportunities for European robotics researchers to work directly with SME/start-ups and new users/customers to create innovative products. ECHORD++ will continue ECHORD’s two pillars, “experiments” and “structured dialogue”, taking advantage of experience and investment in the infrastructure. In addition,...
Voir le projet

 68

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2016, Date de fin: 31 mai 2018,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2016, Date de fin: 31 mai 2018,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 

Electrification of public transport in cities (ELIPTIC)

Date du début: 1 juin 2015, Date de fin: 31 mai 2018,

The overall aim of ELIPTIC is to develop new use concepts and business cases to optimise existing electric infrastructure and rolling stock, saving both money and energy. ELIPTIC will advocate electric public transport sector at the political level and help develop political support for the electrification of public transport across Europe. ELIPTIC looks at three thematic pillars:• Safe integratio...
Voir le projet

 34

 TERMINÉ 

THE PEOPLE’S SMART SCULPTURE

Date du début: 1 oct. 2014, Date de fin: 30 avr. 2018,

“The People’s Smart Sculpture" – Social Art in European Spaces fosters participative art and collaborative urban art&culture processes in Europe´s cross-cultural city spaces. It´s constituted through 11 sub-projects in eight European countries and concomitant exhibitions and workshops. The approach is on two levels: the implementation of cultural participation projects and the evaluation of these ...
Voir le projet

 12

 TERMINÉ 
The project HERCULES-2 is targeting at a fuel-flexible large marine engine, optimally adaptive to its operating environment. The objectives of the HERCULES-2 project are associated to 4 areas of engine integrated R&D:• Improving fuel flexibility for seamless switching between different fuel types, including non-conventional fuels.• Formulating new materials to support high temperature component ap...
Voir le projet

 33

 TERMINÉ 

Graphene-based disruptive technologies (GrapheneCore1)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS...
Voir le projet

 158

 TERMINÉ 
This project will establish a demonstration fleet of small passenger vehicles that builds on and expands existing hydrogen refuelling infrastructure. Three European regions will be participating in this effort: the UK (the Midlands and Plymouth), the Brussels area and Wallonia, and the Weser-Ems region in NorthWest Germany. Each of these regions will deploy a new hydrogen refuelling site to close ...
Voir le projet

 18

 TERMINÉ 

THE MUSIC IS THE KEY: IMPROVING YOUTH EMPLOYABILITY

Date du début: 6 juin 2016, Date de fin: 5 déc. 2017,

Employment is not only the key to get the necessary resources to live, but a basic mechanism for the socialization of young people and also for inclusion in the case of young people with learning difficulties (early school dropout) or even those with special needs.However, achieving this first job to gain experience, build networks of friendship and start the process to create your own family is n...
Voir le projet

 5

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 

Focus on Automatic Institutional Recognition

Date du début: 1 janv. 2015, Date de fin: 30 avr. 2017,

The objective of the Focus on Automatic Institutional Recognition (FAIR) project is to improve European recognition as practiced by higher education institutions by implementing elements of automatic recognition.Experimentation measureThe measure to be tested is the introduction of automatic recognition in institutional recognition procedures. Automatic recognition is a fairly new concept that is ...
Voir le projet

 35

 TERMINÉ 

SUSTAINABLE NANOTECHNOLOGIES (SUN)

Date du début: 1 oct. 2013, Date de fin: 31 mars 2017,

SUN (Sustainable Nanotechnologies) is the first project addressing the entire lifecycle of nanotechnologies to ensure holistic nanosafety evaluation and incorporate the results into tools and guidelines for sustainable manufacturing, easily accessible by industries, regulators and other stakeholders. The project will incorporate scientific findings from over 30 European projects, national and inte...
Voir le projet

 38

 TERMINÉ 

Multipurpose hemp for industrial bioproducts and biomass (MULTIHEMP)

Date du début: 1 sept. 2012, Date de fin: 28 févr. 2017,

Hemp is a sustainable high yielding crop well adapted to most European conditions, with advantageous environmental and agronomical characteristics. Traditionally cultivated for the fibres, seeds and psychoactive substances, it is now considered an ideal crop to produce innovative biomaterials. Once a key industrial crop for fibre, hemp production declined in the last century and was displaced by c...
Voir le projet

 25

 TERMINÉ 
The FLOURplus proposal was initiated by concerned SMEs and industrial associations that have realized the fluctuations in wheat quantity and quality due to the progressing climate change. Their aim is to finally tackle the core problem of the increasingly varying, non-detectable and thus incontrollable flour quality – being aware that this requires a European-wide sector-solution supported through...
Voir le projet

 9

 TERMINÉ 
Learning Layers develops a set of modular and flexible technological layers for supporting workplace practices in SMEs that unlock peer production and scaffold learning in networks of SMEs, thereby bridging the gap between scaling and adaptation to personal needs. By building on recent advances in contextualized learning, these layers provide a meaningful learning context when people interact with...
Voir le projet

 20

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2014, Date de fin: 31 mai 2016,

Seit über 25 Jahren prägt Internationalität entscheidend das Profil der Hochschule Bremen (HSB). Nach langjähriger erfolgreicher Teilnahme an den vorherigen Programmlinien von ERASMUS nimmt die HSB auch an dem neuen ERASMUS+ Programm (Laufzeit 2014-2020) teil. Bei diesem Programm handelt es sich an die HSB um das wichtigste und hochschulweit bekanntesten Drittmittel-Mobilitätsprogramm, sowohl bezo...
Voir le projet

 1

 TERMINÉ 

GReener Aeronautics International Networking-2 (GRAIN 2)

Date du début: 1 oct. 2013, Date de fin: 31 mai 2016,

As mentioned in the Executive Summary of the Strategic Research & Innovation Agenda, Aviation has an important role to play in reducing greenhouse gas emissions as well as noise and local air quality issues. The continuous increase of air passenger transport generates an increasing use of hydrocarbon fuel with excessive emission of CO2 and NOX (greenhouse gases, pollutants and noise). It is well k...
Voir le projet

 25

 TERMINÉ 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Date du début: 1 oct. 2013, Date de fin: 31 mars 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo...
Voir le projet

 154

 TERMINÉ 
Two unconventional concepts of skin contraction are presented that could change the current paradigm of wound healing. The overall objective is to clarify the underlying processes and to develop new therapies to prevent excessive scarring, ameliorate patients lives and reduce medical health care expenses. Specific emphasis lies on the role of Matrix metalloproteinases (MMP) and keratinocytes. Prev...
Voir le projet

 3

 TERMINÉ 
In the understanding of the initiation and development of several diseases revolutionary changes are currently taking place. Cancer and brain diseases are examples of medical fields where new technologies are finding their way into research and applications, radically altering the way the diseases are being diagnosed and treated. Especially methods that yield information on molecular and cellular ...
Voir le projet

 10

 TERMINÉ 
In 2020, mobile and wireless traffic volume is expected to increase thousand-fold over 2010 figures. Moreover, an increase in the number of wirelessly-connected devices to counts in the tens of billions will have a profound impact on society. Massive machine communication, forming the basis for the Internet of Things, will make our everyday life more efficient, comfortable and safer, through a wid...
Voir le projet

 24

 TERMINÉ 

Changes in carbon uptake and emissions by oceans in a changing climate (CARBOCHANGE)

Date du début: 1 mars 2011, Date de fin: 28 févr. 2015,

CARBOCHANGE will provide the best possible process-based quantification of net ocean carbon uptake under changing climate conditions using past and present ocean carbon cycle changes for a better prediction of future ocean carbon uptake. We will improve the quantitative understanding of key biogeochemical and physical processes through a combination of observations and models. We will upscale new ...
Voir le projet

 30

 TERMINÉ 

Manufacturing Error-free Goods at First Time (MEGAFIT)

Date du début: 1 déc. 2011, Date de fin: 30 nov. 2014,

Today, Europe’s leading position in manufacturing of high-precision metal parts is being threatened by developed non-EU countries that catch up quickly on product quality at low cost. If no further action is taken, loss of jobs and GDP are at risk.To face global competition, a breakthrough is needed in tackling the following 4 challenges:1) High number of defects2) Many costly, energy consuming fi...
Voir le projet

 17

 TERMINÉ 

A Geospatial Knowledge World (GEOCROWD)

Date du début: 1 déc. 2010, Date de fin: 30 nov. 2014,

GeoWeb 2.0 is the geographic embodiment of the Web 2.0 moniker for the next generation Web, i.e., the next generation of geographic information publishing, discovery and use. With the proliferation of the Internet as the primary medium for data publishing and information exchange, we have seen an explosion in the amount of online content available on the Web. In addition to professionally-produced...
Voir le projet

 7

 TERMINÉ 

uBiquitous, secUre inTernet-of-things with Location and contExt-awaReness (BUTLER)

Date du début: 1 oct. 2011, Date de fin: 31 oct. 2014,

Recent ICT advances are bringing to reality a world where sensors, actuators and smart portable devices are interconnected into an Internet-of-Things (IoT) ecosystem reaching 50 Billion devices by 2015.The IoT major challenges are, from a systemic viewpoint, smart resource management and digital security; and from a user/service perspective, the pervasiveness (uniformity of performance anytime an...
Voir le projet

 23

 TERMINÉ 
"The Community’s maritime sector must sustain and improve its competitive advantage, with the groundwork for future international competitiveness resting with high quality and innovative education and training. Employees in the maritime transport sector need innovative educational opportunities that focus on their special working conditions. The KNow-ME project addresses this need by engendering a...
Voir le projet

 11

 TERMINÉ 

Biotechnology for Africa's sustainable water supply (WATERBIOTECH)

Date du début: 1 août 2011, Date de fin: 31 janv. 2014,

"More than water scarcity, diseases and civil wars, Africa is also the least wealthy continent, in terms of economic and financial resources. These combined and tightly linked problems have led to a restricted range of choices, affordable for African countries, to deal particularly with the water issue, as a major topic. Polluted water treatment before use has been their almost unique solution to ...
Voir le projet

 18

 TERMINÉ 
The aim of the project Advance-FSP will be the design and construction of a prototype industrial FSP nanoparticle production line, one order of magnitude higher than whatever is currently available, suitable to achieve at a continuous and trouble-free production level of 5kg/h the same results regarding nature and size (in the range of 10nm) of nanoparticles as obtained in the small FSP laboratory...
Voir le projet

 14

 TERMINÉ 

Development of an automatic irrigation and fertilization system (OPTIFERT)

Date du début: 1 déc. 2011, Date de fin: 30 nov. 2013,

"Due to climate related changes, longer dry periods for European farmers and without irrigation the risk of a volatile harvests will rise, that is the reason for a tendency acrossEurope to irrigate fields. The need for innovative irrigated systems is to minimize water consumption and costs. Also in times of limited water the project will be lucrative.There are more and more increasing cost pressur...
Voir le projet

 9

 TERMINÉ 

Collective Emotions in Cyberspace (CYBEREMOTIONS)

Date du début: 1 févr. 2009, Date de fin: 31 mai 2013,

The main aims of the project are:- to understand the process of collective emotions formation in e-communities as a spontaneous emergent behaviour occurring at complex techno-social networks- to create decentralized adaptive tools to amplify positive or suppress negative collective emotions in e-societies and will take into account heterogeneity of interacting humans- to create theoretical backg...
Voir le projet

 9

 TERMINÉ 

Effective redesign of oxidative enzymes for green chemistry (OXYGREEN)

Date du début: 1 mai 2008, Date de fin: 30 avr. 2013,

"Enzymes are extremely powerful natural catalysts able to perform almost any type of chemical reaction while being mild by nature and highly specific. In fact, the delicate functioning of enzymes forms the basis of every living creature. The catalytic potential of enzymes is more and more appreciated by the industry as many industrial processes rely on these sophisticated catalysts. However, the n...
Voir le projet

 14

 TERMINÉ 

PROteomics SPECification in Time and Space (PROSPECTS)

Date du début: 1 avr. 2008, Date de fin: 31 mars 2013,

"Proteomics is a major new field in biomedical research, which deals with the large-scale identification and characterization of large groups of proteins, or “proteomes”. These can either be the components of a subcellular organelle or compartment, or even the entire protein complement of whole cells and tissues. Proteomics is essential in the functional annotation of the genome and in future atte...
Voir le projet

 11

 TERMINÉ 
"In NANODETECT, the nanoreaction technology will be used to develop on-line and off-line monitoring systems (sensors) which combine the expertise of sensitive molecular biological processes with the potency of nanotechnology for application in liquid process food streams. The nanosensors will interact with information technology tools and thus contribute to improved quality control systems within ...
Voir le projet

 9

 TERMINÉ 

Developing the North Sea Offshore Wind Power Cluster (POWER cluster)

Date du début: 30 juin 2008, Date de fin: 29 juin 2011,

As a direct successor of NSR Interreg IIIBs POWER project, it is centred on the development of a strong Offshore Wind Industry (OWI) cluster in the NSR. Core activities include a strengthened stakeholder and business-to-business network, leading to knowledge transfer and bringing together complementary expertise to create more innovation in the sector, energy grid reinforcement across the NSR, dev...
Voir le projet

 18