Rechercher des projets européens

Szennyvízkezelés Panyidaróc És Szente Községekben/ Výstavba ČOV a kanalizácie v Panických Dravciach a Szente (Szennyvízkezelés Panyidaróc-Szente / ČOV a kanalizácia P.Dravce a Szente)
Date du début: 30 nov. 2010, Date de fin: 29 nov. 2012 PROJET  TERMINÉ 

Municipality Panické Dravce lies in south-west part of Lucenec fold in the right side of Ipeľ river basin. People work mainly in agriculture and services. Between weeknesses of municipality belong poor infrastructure, low level of quality life, high unemployment rate and raising migration of inhabitants. Municipality is the member of Micro-region Pri Velických jazerách. The project for sewage tank and canalization building presents the solution of improvement the infrastructure quality, quality of life and creation of new jobs. The canalization network doesn´t build in municipality Panické Dravce at the present time. Municipality hasn´t built the watter-supply, inhabitants supply with watter from manhole. In municipality was built the gas main, electric and telecommunication network, rainy canalization. Sewage tank and canalization building effective contribute to improvement of underground water quality. Sewage waters produced by individual producers are collected to cesspools. Line up of inhabitants to canalization will cause stopping cesspools utilization with bad quality of water. The water quality in municipality don´t meet requests for drinking water in the field of chemistry. Municipality is solving this problem by supply of drinking water from tank. In municipality Szente not exist the canalization network, waste watters from households are locatable and scotched by the way not environment protecting. Waste watters created in households are stored in cesspools in the area of individual properties, in many cases they are located in the closed bowls. From these places the content of communal waste overflows in the earth or underground watter, rest of waste watters from cesspools was suppled around. Because this process is not controlled, is not secured the suitable way of waste watter elimination. The waste watters were located in municipality rural zone with the way not environment protecting. Sewage tank and canalization building for both municipal. Achievements: The project aimed to protect the environment, optimize a water and waste system, improve the living standard, create new jobs and increase the attractiveness of the areas for future investors. Building water treatment plants and sewage systems for both municipalities was important and it was not possible to delay it anymore, because these investments eliminate the pollution of the environment, underground water and detrimental effects on the environment in these localities.

Coordinateur

Details

  • 85%   1 994 285,40
  • 2007 - 2013 Hungary - Slovak Republic (HU-SK)
  • Projet sur KEEP platform
Projet Website