Rechercher des projets européens

Muraside Bridge Fair (Murabridge)
Date du début: 30 juin 2011, Date de fin: 28 févr. 2012 PROJET  TERMINÉ 

The project is working on minimizing the effects of the construction of M7 highway on the local businesses of the cross-border area. Aiming at re-establishing the connections between the two border communities, the project will include a two-day Bridge Fair on the site of the old border crossing, exhibitions and fairs of local craftsmen, local producers and processors; relationship building workshops promoting sustainability; data collection for the database of local producers and products and diverse supporting programmes on both sides such as: hiking-tour, fishing-competition, exhibition of Mura fish foods etc. Achievements: The revitalisation of the old border crossing at the Mura bridge was the main idea behind this project that connected the two communities previously in constant contact thanks to the crossing. To bring life back to the Old Bridge, the partners organised a two-day fair with the participation of local craftsmen and performances of local dance and singing groups. The fair was not only an opportunity for local inhabitants to come together and interact through the joint performances, but also for the local artisans to present their original products.

Coordinateur

Details

  • 85%   95 332,19
  • 2007 - 2013 Hungary - Croatia (HU-HR)
  • Projet sur KEEP platform
Projet Website

1 Participants partenaires