Rechercher des projets européens

Long-term performance of Engineered Barrier Systems (EBS) (PEBS)
Date du début: 1 mars 2010, Date de fin: 28 févr. 2014 PROJET  TERMINÉ 

The main aim of the project PEBS (Long-term Performance of the Engineered Barrier System) is to evaluate the sealing and barrier performance of the EBS with time, through development of a comprehensive approach involving experiments, model development and consideration of the potential impacts on long-term safety functions. The experiments and models cover the full range of conditions from initial emplacement of wastes (high heat generation and EBS resaturation) through to later stage establishment of near steady-state conditions, i.e. full resaturation and thermal equilibrium with the host rock. These aspects will be integrated in a manner that will lead to a more convincing connection between the initial transient state of the EBS and its long-term state that provides the required isolation of the wastes. The work proposed within the project builds on existing knowledge and experience generated during recent years and supported by ongoing nat. and EC research programmes. The project pretends to provide a more complete description of the THM and THM-C (thermo-hydromechanical-chemical) evolution of the EBS system, a more quantitative basis for relating the evolutionary behaviour to the safety functions of the system and a further clarification of the significance of residual uncertainties for long-term performance assessment. The importance of uncertainties arising from potential disagreement between the process models and the laboratory and in situ experiments to be performed within PEBS, and their implications for extrapolation of results will be reviewed, with particular emphasis on possible impacts on safety functions. In addition to the scientific-tech. aim, the consortium will spread the essential results to the european scientific community and Canada, Japan and China, use its expertise for public information purposes, and promote knowledge and technology transfer through training. WP 5 brings together activities concerning dissemination and training.

Coordinateur

Details

  • 43.1%   2 806 333,00
  • FP7-EURATOM-FISSION
  • Projet sur CORDIS platform
Projet Website

17 Participants partenaires