Up2Europe est un accélérateur d’idées pour des projets de coopération.
La plateforme Ma Région Sud fait partie de l'écosystème de Up2Europe qui permet de booster la coopération à un niveau supérieur!
Besoin d'aide ? La Région Sud vous accompagne
Laissez-vous guider par notre équipe d'experts ! Saisissez votre mail et nous reviendrons vers vous rapidement
KiWi Power Limited’s Revolutionary, Low Cost, Dema.. (KDRP)
KiWi Power Limited’s Revolutionary, Low Cost, Demand Response Platform (KDRP)
(KDRP)
Date du début: 1 mars 2015,
Date de fin: 30 juin 2015
PROJET
TERMINÉ
CHALLENGE: Demand response (DR) is central to the successful evolution of a new low carbon electricity system in order to deliver grid flexibility & stability, however it is progressing slowly in the EU due to technological barriers which prevent widespread uptake: high in cost hardware (€4.000 - €6.000); not specifically designed for DR → lack critical functionality (e.g. wireless communication, integration of renewables); & not sufficiently open for wider industry participation.PROPOSED SOLUTION: To address the need for innovations that overcome principal barriers to DR, this project seeks to advance KPLs Energy Management Platform, KEMP, from a prototype demonstrated in a relevant environment (TRL6) to complete & qualified commercial prototype (TRL8). KEMP is a low cost, automated ancillary services platform which consists of: [1] Unique hardware: multi-asset control; first platform to integrate renewable assets; wireless communication between assets → reduced installation cost; & sec. by sec. meter readings – requirement for Frequency Response programmes. [2] Innovative software: cloud based – for greater scalability; flexibility & remote monitoring, forecasting model - for integration of renewables; & optimisation engine - to max. revenues.END USERS: [1] Initial target = large scale commercial & industrial (C&I) orgs with high MW capacity (>1MW) e.g. financial, telecoms, hospitals, hotels etc. Asset types: DRUPS systems & HVAC. [2] Secondary target = SMEs with low MW capacity (50kW< capacity < 1MW) incl. Water Pump Stations, Small Data Centres, Retail Stores. Asset types: Variable Speed Motors, HVAC, UPS systems etc.STUDY OBJECTIVES: tech validation, market analysis, economic & business assessment, operational capacity analysis. Activities will be delivered within a 4 month period, & result in a comprehensive feasibility report detailing the next steps towards development & commercialisation, forming the basis of the SMEI Phase II Business Plan.
Accédez au prémier réseau pour la cooperation européenne
Se connecter
Bonjour, vous êtes sur la plateforme Région Sud Provence-Alpes-Côte d’Azur dédiée aux programmes thématiques et de coopération territoriale. Une équipe d’experts vous accompagne dans vos recherches de financements.
Contactez-nous !
Contactez la Région Sud Provence-Alpes-Côte d'Azur
Vous pouvez nous écrire en Anglais, Français et Italien