Rechercher des projets européens

Ipoly-híd újjáépítése Pösténypuszta-Pető között / Výstavba mostu cez rieku Ipeľ medzi Pösténypuszta Peťov (Pető) (Pösténypuszta-Pető Ipoly-híd / Most Pösténypuszta - Peťov cez rieku Ipeľ)
Date du début: 31 juil. 2009, Date de fin: 30 juil. 2011 PROJET  TERMINÉ 

The main basic of the economical growth is the suitable quality of the traffic infrastructure. The project aim is to reduce differences between the developed and underdeveloped areas in the following fields: living and, economical conditions, education, culture, health-care, social-care and infrastructure.The project is building bridge between Pösténypuszta Petov villages. Achievements: The project offered an opportunity to develop the settlements alongside the border area. Within the frame of the project a 75.1 m long bridge was constructed between Pösténypuszta (HU) and Peťov (SK) that helps to ease the cooperation of the Hungarian and Slovak employers and SMEs by significantly reduced travel time between the two settlements. In Slovakia 900 m of road was reconstructed, while in Hungary a 1258 m long road leading to the bridge was newly constructed.

Details

  • 83.4%   3 071 751,31
  • 2007 - 2013 Hungary - Slovak Republic (HU-SK)
  • Projet sur KEEP platform
Projet Website