Rechercher des projets européens

Improvement of water quality in small sttlements Vircava (LV) and Sauginiai (LT). (Water quality)
Date du début: 31 janv. 2009, Date de fin: 30 juil. 2011 PROJET  TERMINÉ 

Since 1999, the municipalities of the Siauliai District in Lithuania and Jelgava District in Latvia have been cooperating in preparation and implementation of joint projects. These municipalities share a common border, which includes the Lielupe river basin. Both project partners are currently faced with the problem of polluted rivers in the Lielupe river basin due to poor waste water treatment that leads to sewage flowing into surface and groundwater. Poor waste water treatment is a barrier for greater biodiversity and the development of water tourism in both districts. Moreover, it adversely affects the inhabitants of the towns of Sauginiai and Vircava. The water supply and sewage treatment systems are being reconstructed in order to bring cleaner water to inhabitants and also make it more cost-effective. This project is a continuation of a previous project entitled Improvement of water supply services in small settlements of Siauliai, Joniskis and Jelgava districts, which was partly financed by the Baltic Sea Region INTERREG III B Neighbourhood programme INTERREG IIIA Priority South. Documentation and feasibility studies done for the previous project were used in the implementation of this project. Inhabitants will be provided with services that comply with European Union, Latvian and Lithuanian regulations. Municipality officials in charge of waterworks in both Siauliai and Jelgava will also be able to enrich their knowledge in order to more effectively carry out their duties and work for the good of the local inhabitants and the environment. Achievements: Created means for performing joint public services (a number of services and infrastructure/%) - 2; Conferences - 3; TV and radio broadcasting - 2;Within the Project:• On Latvia side – Vircava settlement - reconstructed 3150 m of water system, 2030 m of waste water system, reconstructed building of water treatment plant, constructed new sewage treatment plant with the pump station, 20 new drain tanks made. • On Lithuanian side – settlement Sauginiai - reconstructed 3987 m of water system; reconstructed 4120 m of waste water system.

Coordinateur

Details

  • 85.1%   1 056 223,60
  • 2007 - 2013 Latvia-Lithuania (LV-LT)
  • Projet sur KEEP platform
Projet Website

1 Participants partenaires