Up2Europe est un accélérateur d’idées pour des projets de coopération.
La plateforme Ma Région Sud fait partie de l'écosystème de Up2Europe qui permet de booster la coopération à un niveau supérieur!
Besoin d'aide ? La Région Sud vous accompagne
Laissez-vous guider par notre équipe d'experts ! Saisissez votre mail et nous reviendrons vers vous rapidement
I-PRIMES: an Intelligent Power Regulation using I.. (I-PRIMES)
I-PRIMES: an Intelligent Power Regulation using Innovative Modules for Energy Supervision
(I-PRIMES)
Date du début: 1 juin 2012,
Date de fin: 31 déc. 2014
PROJET
TERMINÉ
"The main objective of the proposal is the development of an hardware device able to implement an innovative power management (I-LPM) function for an aeronautical electrical network. The proposal is based on the two keypoints. First one concerns the I-LPM strategy for the specific application, that will be first derived and tested in a simulation environment. In a second phase the above strategy will be implemented, adopting semi-automatic techniques for translation of the simulation model into firmware. Second keypoint is about an EPC (Electrical Power Center) hardware extension that will be designed and realized, where a modular approach will be considered for the overall equipment implementation. Each cell will be composed by a programmable device, an interfacing stage and possibly by an innovative power device switching component. A “master” module will be able to implement the I-LPM concept and communicate with “slave” modules for correct energy management strategy implementation. Different types of “slave” modules will be considered, taking into account the necessity of I-LPM strategy implementation for both “fixed power” and “variable power” loads. A preliminary analysis phase will be conducted in order to analyze the fundamental requirements for the project objectives and derive the specifications set. After the models validation, it will be necessary to implement the derived models as real electronic components. Before integration on the ETB (Electrical Test Bench), the hardware performances will be verified towards the expected results, considering the requirements derived in the first stage as well as the obtained simulation results. Next, a complete test case set will be performed in order to evidence the expected results fulfillment. Finally, an optimization stage will consider the user's feedbacks and appropriately manage potential faults occurring on the electrical network."
Accédez au prémier réseau pour la cooperation européenne
Se connecter
Bonjour, vous êtes sur la plateforme Région Sud Provence-Alpes-Côte d’Azur dédiée aux programmes thématiques et de coopération territoriale. Une équipe d’experts vous accompagne dans vos recherches de financements.
Contactez-nous !
Contactez la Région Sud Provence-Alpes-Côte d'Azur
Vous pouvez nous écrire en Anglais, Français et Italien