Rechercher des projets européens

ELABORATION OF THE FEASIBILITY STUDIES FOR MODERNISATION OF THE ROAD NETWORK, ROAD EXPRESS LINK, OLT COUNTY LIMIT, CROSS BORDER CHECK POINT AT TURNU MAGURELE-NICOPOLE, FIRST SECTION, SEGARCEA VALE-LIŢA-TURNU MĂGURELE (INTERSECTION WITH DN 52) AND ROAD PVN (ELABORATION OF THE FEASIBILITY STUDIES II)
Date du début: 13 avr. 2011, Date de fin: 12 oct. 2012 PROJET  TERMINÉ 

General Obiective of the project is: stimulation of the durable economic development and the promotion of the economic and social cohesion through the elaboration of the feasabilitystudy for the project “Modernization of the road system, Express Road of connection, limit Olt county – Control Point and Passing of Border Turnu – Magurele – Nicopole, Point 1, Segarcea Vale – Lita – Turnu Magurele”

Details

  • 84.5%   298 322,79
  • 2007 - 2013 Romania - Bulgaria (RO-BG)
  • Projet sur KEEP platform
Projet Website

1 Participants partenaires