Corridor 5 development strategy with special attention to the track section between Italy and Slovenia, and feasibility study on the new Trieste - Divača railway line in keeping with decision n. 884/2004 EC
Corridor 5 development strategy with special atten.. (CROSS V)
Corridor 5 development strategy with special attention to the track section between Italy and Slovenia, and feasibility study on the new Trieste - Divača railway line in keeping with decision n. 884/2004 EC
(CROSS V)
Date du début: 30 déc. 2006,
Date de fin: 29 juin 2008
PROJET
TERMINÉ
The project outlines the strategic initiatives to be undertaken in order to develop and consolidate organizations and infrastructures along Pan-European Corridor 5 in order to foster the establishment of connecting factors between the countries the railway line runs through. One of the most important tracks is Italian-Slovenian TEN Priority Project n. 6, that includes the Trieste-Divača section, where a feasibility study for the new railway line will be developed, in keeping with decision n. 884/2004 EC. The strategic study of Corridor 5 (financed with funds allocated through National Law no. 84/2001) will focus on the favourable and detrimental consequences produced by the whole track on territorial development, on the transport system, on the social-economic organization and on the environment, taking account of the legislative framework in force in each Country and of the relevant Community regulations. As regards the feasibility study of the railroad junction Trieste-Divača, for a total length of approximately 28 km, the following conditions need to be observed: the technical and construction parameters of the layout, as well as the safety measures, will have to be homogeneous for the whole work, the speed category will have to be as high as possible, taking account of all technical and economic requirements, whereas the maximum gradient cannot exceed 17‰.. The reduction of such gradient, if any, will also be considered by the current study, keeping in mind that this is a mixed line where freight is very important. The project sees the participation of numerous partners, consisting for the Italian side of the Ministry of Infrastructures, Region Friuli Venezia Giulia, Region Veneto, the Italian Railway Company and the Executive Secretariat of CEI; for the Slovenian side, the Directorate for Investments in Railroad Infrastructures (belonging to the Ministry of Transport) and the Ministry for the Environment and the Territory.
Accédez au prémier réseau pour la cooperation européenne
Se connecter
Bonjour, vous êtes sur la plateforme Région Sud Provence-Alpes-Côte d’Azur dédiée aux programmes thématiques et de coopération territoriale. Une équipe d’experts vous accompagne dans vos recherches de financements.
Contactez-nous !
Contactez la Région Sud Provence-Alpes-Côte d'Azur
Vous pouvez nous écrire en Anglais, Français et Italien