Rechercher des projets européens

Coordinated activities for management of of the river Isonzo/ Soča (CAMIS)
Date du début: 31 juil. 2012, Date de fin: 30 janv. 2015 PROJET  TERMINÉ 

The catchment area of ​​the River Soca is a cross-border nature and therefore requires consultation and coordination, which is formally defined in bilateral agreements. In substance, the project was divided into the analytical part of the research of river morphology and hydraulics (1 2D hydrodynamic model), the second part is devoted to the analysis of water quality, updating databases on the river. Expected Results: Analytical part: geodetic measurements, measurement sections, the analysis of hardened river banks, study particle size analysis of morphological changes, debris transport and withdrawal

Coordinateur

Details

  • 85%   1 216 570,11
  • 2007 - 2013 Italy - Slovenia (IT-SI)
  • Projet sur KEEP platform
Projet Website

10 Participants partenaires