Rechercher des projets européens

CONSTRUCTION OF A NEW BRIDGE OVER THE DANUBE RIVER AT VIDIN – CALAFAT
Date du début: 31 déc. 2006, Date de fin: 30 déc. 2012 PROJET  TERMINÉ 

Aim:Part of the TEN-T Priority Project 22 (Pan-European transport corridor K 4).The Project includes design and construction of a combined (road and rail) bridge with 4 road lanes and a single-track railway line plus bicycle lane.

Coordinateur

Details