Completion of the North breakwater in the Port of Constan?a (Completion of the North breakwater in the Port of Constanţa)
Date du début: 31 déc. 2010, Date de fin: 30 déc. 2013 PROJET  TERMINÉ 

The completion of the last 1,050 m long sector of the North breakwater, which has not been executed, will have positive effects in terms of safety operations in the Constanta Sea Port which is located on the Black Sea and connected to the Danube via the Danube-Black Sea Canal.Objectives• Decreasing the waves in the port to an acceptable level to ensure the safe operation of vessels• Decreasing the destructive effects of the waves on the infrastructure within the port• Smooth access of vessels to the entry into the port• Decreasing the sediments in the waters by guiding the currents further away