Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

virtual Factories: Interoperation suppoRting buSiness innovaTion (FIRST)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2020,

The manufacturing industry is entering a new era in which new ICT technologies and collaboration applications are integrated with traditional manufacturing practices and processes, which brings virtual organisations to factories, i.e. Manufacturing 2.0. Virtual factory to future manufacturing slows the flexible amalgamation of manufacturing resources in multiple organisations to create timely, dem ...
Voir le projet

 5

 TERMINÉ 

Analysis System for Gathered Raw Data (ASGARD)

Date du début: 1 sept. 2016, Date de fin: 29 févr. 2020,

ASGARD has a singular goal, contribute to Law Enforcement Agencies Technological Autonomy and effective use of technology. Technologies will be transferred to end users under an open source scheme focusing on Forensics, Intelligence and Foresight (Intelligence led prevention and anticipation). ASGARD will drive progress in the processing of seized data, availability of massive amounts of data and ...
Voir le projet

 34

 TERMINÉ 

Design for Resource and Energy efficiency in cerAMic kilns (DREAM)

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2019,

The DREAM project aims to design, develop and demonstrate a radically improved architecture for ceramic industrial furnaces, characterised by optimised energy consumption, reduced emissions, and lower operating costs compared to currently available technological solutions. This will be obtained by substantially enhancing specific furnace parts (control system, refractories, emissions abatement sys ...
Voir le projet

 11

 TERMINÉ 
...ans. All the 7 RPOs of the EQUAL-IST consortium are at a starting stage in the setting up of GEPs and they have also ensured the support of the highest management levels both from their faculties and university as whole. The project will combine gender mainstreaming and positive actions on 3 main levels: HR practices and management processes, research design and delivery, student services and inst ...
Voir le projet

 9

 TERMINÉ 
ENABLE-S3 will pave the way for accelerated application of highly automated and autonomous systems in the mobility domains automotive, aerospace, rail and maritime as well as in the health care domain. Virtual testing, verification and coverage-oriented test selection methods will enable validation with reasonable efforts. The resulting validation framework will ensure Europeans Industry competiti ...
Voir le projet

 76

 TERMINÉ 

Shared Memories and Dialogues

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2018,

The project promotes migrant-background children’s inclusion and learning, through facilitation of children’s production of shared memories in dialogic communication. The project involves 48 classrooms of 9-11 years children, in three countries. It fosters recognition and empowerment of migrant-background children, avoiding their differentiation from non-migrant children. The project implements t ...
Voir le projet

 3

 TERMINÉ 

Linguacuisine

Date du début: 1 sept. 2016, Date de fin: 31 oct. 2018,

The Linguacuisine project addresses the future of equality of access and participation in learning linked to two core skills gaps recognised by today’s changing Europe: digital skills and language skills. The project will promote learning of digital literacy, languages, cuisines and cultures. It will do this by co-design of downloadable apps and social recipes by means of an authoring tool to deve ...
Voir le projet

 5

 TERMINÉ 

A VET course for Cultural Mediators to address the refugee crisis’ skills needs

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2018,

...te mutual recognition of the produced learning outcomes across the EU based on EQF and ECVET standards.THE ReCULM PARTNERSHIPThe National Center for Social Research – EKKE (EL), the UNIMORE University (IT), the ALMERIA University – UAL (ES) and the University of Glasgow – UGLA (UK) form a Strategic Partnership comprising field, academic and research expertise from 4 European countries in current i ...
Voir le projet

 4

 TERMINÉ 

European Clearing House for Open Robotics Development Plus Plus (ECHORD Plus Plus)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2018,

Description ECHORD++ will create new opportunities for European robotics researchers to work directly with SME/start-ups and new users/customers to create innovative products. ECHORD++ will continue ECHORD’s two pillars, “experiments” and “structured dialogue”, taking advantage of experience and investment in the infrastructure. In addition, ...
Voir le projet

 68

 TERMINÉ 

foSTering early childhOod media liteRacy competencIES

Date du début: 1 sept. 2015, Date de fin: 31 août 2018,

In our digital society, children widely use new media technologies and ICT tools everywhere diffused, starting at very young age. Although the role of ICT in education is becoming increasingly important and acknowledged as one of the first objectives towards the Digital Competence in the EU2020 strategy, from the point of view of ECEC the use of new media technology in preschool education has not ...
Voir le projet

 6

 TERMINÉ 

European cooperative framework for Dual LEarning

Date du début: 1 sept. 2015, Date de fin: 31 août 2018,

EuroDuaLE want to open the road for transnational cooperation for the provision of dual learning programmes. HEIs are asked to strenghten the quality of the education provided, for example with the use of ICT solutions and more innovative training approaches, open up to cross-national cooperation and relate more efficiently with the labour market (EU Modernisation Agenda for HE, 2011) . With Euro ...
Voir le projet

 13

 TERMINÉ 
The rise of the system complexity, the rapid changing of consumers demand require the European industry to produce more customized products with a better use of resources.The main objective of IMPROVE is to create a virtual Factory of the Future, which provides services for user support, especially on optimization and monitoring. By monitoring anomalous behaviour will be detected before it leads t ...
Voir le projet

 13

 TERMINÉ 

European Consortium for Communicating Stem Cell Research (EuroStemCell)

Date du début: 1 janv. 2015, Date de fin: 31 mars 2018,

The European Consortium for Communicating Stem Cell Research (EuroStemCell) unites 33 partner institutions, that collectively represent >400 stem cell research groupings across Europe. Our common goal is to provide trusted high quality information on stem cells accessible to citizens and stakeholders across Europe, through support and further development of the multi-lingual European Stem Cell Inf ...
Voir le projet

 32

 TERMINÉ 
Age-related cancers, especially of the trachea, are neoplastic lesions that significantly impact upon the lives of thousands of European patients each year. Unfortunately, most present with inoperable lesions for which median survival is less than 12 months. Based on our previous clinically successful experiences with in vivo completely tissue engineered tracheal replacement in benign tracheal dis ...
Voir le projet

 13

 TERMINÉ 

Co-morbidity in relation to Aids (COBRA)

Date du début: 1 mars 2013, Date de fin: 28 févr. 2017,

Persons with HIV on combination antiretroviral therapy (cART) are at increased risk of the premature development of age-associated non-communicable comorbidities (AANCC), including cardiovascular, chronic kidney, liver and pulmonary disease, diabetes mellitus, osteoporosis, non-AIDS associated malignancies, and neurocognitive impairment. It has therefore been hypothesised that such individuals, de ...
Voir le projet

 12

 TERMINÉ 

Technology Transfer in Computing Systems (TETRACOM)

Date du début: 1 sept. 2013, Date de fin: 31 août 2016,

The mission of the TETRACOM Coordination Action is to boost European academia-to-industry technology transfer (TT) in all domains of Computing Systems. While many other European and national initiatives focus on training of entrepreneurs and support for start-up companies, the key differentiator of TETRACOM is a novel instrument called Technology Transfer Project (TTP). TTPs help to lower the barr ...
Voir le projet

 33

 TERMINÉ 
The balance between water demand and availability has reached a critical level in many areas of Europe, according to the European Environment Agency and it is expected that the situation will be exacerbated in future by climate and social change.The UN Environment Programme reports that trends indicate a 40% rise in average water consumption by Europeans over the next 20 years, while EC statistics ...
Voir le projet

 10

 TERMINÉ 
The importance of advanced simulation to the competitiveness of both large and small companies is well established. The principal objective of Fortissimo is to enable European manufacturing, particularly small to medium enterprises (SMEs), to benefit from the efficiency and competitive advantage inherent in the use of simulation. However, the simulation of, for example, high-pressure gas cylinders ...
Voir le projet

 96

 TERMINÉ 
Healthy seed are key to high crop yields, underpinning European and global food security. A wide range of diseases and pests are carried by seed and as well as spreading and increasing old problems, new problems may be introduced into the European Community countries via this route. There are currently opportunities to improve seed quality control by implementing emerging novel methodologies. The ...
Voir le projet

 14

 TERMINÉ 

Autonomic Service-Component Ensembles (ASCENS)

Date du début: 1 oct. 2010, Date de fin: 31 mars 2015,

Description Future software-intensive systems, such as sensor networks, power grids, satellite and robot swarms, will generally exhibit a number of characteristic features:Massive numbers of nodes, nodes with complex behavior, or complex interactions between nodes.Operation in open and non-deterministic environments with variable network top ...
Voir le projet

 17

 TERMINÉ 

Implantable Organic Nano-Electronics (iONE-FP7)

Date du début: 1 mars 2012, Date de fin: 28 févr. 2015,

The vision of iONE-FP7 is to exploit for the first time flexible organic electronics for the development and testing of Active Multifunctional Implantable Devices (AMIDs) to treat Spinal Cord Injury (SCI). The devices will (a) have long-term stability associated to high biocompatibility and safety, (b) have reduced risk of a host versus graft immune response, (c) mimic the local microenvironment f ...
Voir le projet

 13

 TERMINÉ 

Multibody Advanced Airship for Transport (MAAT)

Date du début: 1 sept. 2011, Date de fin: 28 févr. 2015,

"The MAAT project aims to investigate aerial transportation possibility by airship based cruiser-feeder system. MAAT is composed by tree modules :- the cruiser, named PTAH, (acronym of Photovoltaic Transport Aerial High altitude system);- the feeder, named ATEN (Aerial Transport Elevator Network feeder), is a VTOL system (Vertical Take Off and Landing) which ensure the connection ...
Voir le projet

 12

 TERMINÉ 

Cycloidal Rotor Optimized for Propulsion (CROP)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2014,

The CROP project introduces an innovative propulsion system for aircrafts based on the cycloidal rotor concept, using an integrated approach that includes the electric drive train, airframe integration and an environmental friendly energy source.The CROP system is supported on a multiphysics approach:1. The high thrust is obtained by unsteady-based cycloidal rotor operation;2. The development of l ...
Voir le projet

 6

 TERMINÉ 

Smart Connected Electro Mobility (smartCEM)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2014,

Four European cities/regions (Barcelona, Gipuzkoa-San Sebastian, Newcastle and Reggio Emilia) have come together to demonstrate the role of ICT solutions for cities and citizens in addressing shortcomings of electro mobility. Electric power solutions have proven to offer a potentially ground-breaking solution for more energy-efficient and less petrol-dependent vehicles and transport systems. The ...
Voir le projet

 31

 TERMINÉ 

Aerial Coanda High Efficiency Orienting-jet Nozzle (ACHEON)

Date du début: 1 déc. 2012, Date de fin: 30 nov. 2014,

The ACHEON project explores a novel propulsive system for aircrafts which overcome the main limitations of traditional systems introducing an effective and affordable vectored jet aerial propulsion with no part in move-ment. The project aims to overcome well known limits related to commonly known jet deflection system.The ACHEON system is based on the cumulated effects of three physical effects:1. ...
Voir le projet

 6

 TERMINÉ 
Background Ceramic tile production consumes large quantities of non-renewable materials, including sand, feldspars, alumina, zirconia, mullite and clay. Substantial amounts of water are also used, particular in the milling of raw materials and to finish the fired tiles. To produce 1 000 square metres of tiles, between 8-18 cubic metres of water are needed ...
Voir le projet

 4

 TERMINÉ 
This proposal aims to develop and implement efficacy of clinical trials with adult, tissue stem cells for degenerative diseases of epithelia and skeletal muscle. Extraordinary progress in the understanding of several key features of stem cells has been rapidly translated into novel cell therapy protocols that have yielded positive results in pre-clinical models of genetic and acquired diseases and ...
Voir le projet

 20

 TERMINÉ 

European Clearing House for Open Robotics Development (ECHORD)

Date du début: 1 janv. 2009, Date de fin: 31 déc. 2013,

Description Strengthening the knowledge transfer between scientific research and industry in robotics and stimulating their cooperation In Europe the robotics industry is strong, but still fragmented and dispersed. The objective of ECHORD is to provide new opportunities for coordinated and target- ...
Voir le projet

 105

 TERMINÉ 

Chromatin diseases: from basic mechanisms to therapy (DisChrom)

Date du début: 1 nov. 2009, Date de fin: 31 oct. 2013,

The scope of this ITN is to promote research and training in the field of chromatin diseases. Chromatin diseases (CD) are genetic pathologies resulting from mutations in structural components of chromatin or in enzymes that biochemically modify chromatin, altering chromatin status and thereby causing drastic effects on gene expression. CD frequency ranges from very rare to quite common pathologies ...
Voir le projet

 11

 TERMINÉ 

Language, Cognition, and Gender (ITN-LCG)

Date du début: 1 oct. 2009, Date de fin: 30 sept. 2013,

The Initial Training Network - Language, Cognition, and Gender (ITN LCG) investigates European languages from an interdisciplinary perspective to expand current knowledge of how language influences and forms the cognitive representations of women and men. The diversity of Europe offers a unique opportunity to investigate the impact of language and culture in establishing and maintaining gender ine ...
Voir le projet

 11

 TERMINÉ 

Coordination Action for Self-Awareness \nin Autonomic Systems (AWARE)

Date du début: 1 oct. 2010, Date de fin: 30 sept. 2013,

The main aim of the AWARE Coordination Action is to provide a focal point for the wide range of research domains potentially addressed by the FET Proactive Initiative in AWARENESS. Self-awareness in autonomic systems can include ideas and concepts from artificial intelligence, network performance, distributed systems, machine learning, and artificial consciousness. This CA seeks to provide a commo ...
Voir le projet

 5

 TERMINÉ 

Self-aware Pervasive Service Ecosystems (SAPERE)

Date du début: 1 oct. 2010, Date de fin: 30 sept. 2013,

The objective of SAPERE is the development of a highly-innovative theoretical and practical framework for the decentralized deployment and execution of self-aware and adaptive services for future and emerging pervasive network scenarios. The framework will be grounded on a foundational re-thinking of current service models and of associated infrastructures and algorithms. In particular, getting in ...
Voir le projet

 6

 TERMINÉ 

Beyond CMOS Nanodevices for Adding Functionalities\nto CMOS (NANOFUNCTION)

Date du début: 1 sept. 2010, Date de fin: 31 août 2013,

Description NANOFUNCTION addresses the merging of advanced More than Moore (MtM) devices with Beyond-CMOS. Topics: Si nanowires for sensing, on-chip energy harvesting, nano-cooling and porous Si for RF passives.The NANOFUNCTION project aims to integrate at the European level the excellent European research laboratories in order to strengt ...
Voir le projet

 21

 TERMINÉ 

Persisting Transgenesis (PERSIST)

Date du début: 1 janv. 2009, Date de fin: 30 juin 2013,

"For many disabling or fatal diseases, there is pre-clinical or clinical evidence of the potential therapeutic efficacy of gene therapy and, yet, the limitations of current gene transfer technologies have prevented success or even caused serious adverse events leading to termination of trials. PERSIST will explore the use of highly innovative gene-modifying and delivery technologies and capitalize ...
Voir le projet

 29

 TERMINÉ 

Fatty liver: Inhibition of Progression (FLIP)

Date du début: 1 janv. 2010, Date de fin: 30 juin 2013,

"Non-alcoholic fatty liver disease (NAFLD) has become one of the top concerns for the practising hepatogastroenterologist due to the obesity epidemic and its potential to progress to advanced liver disease which significantly impacts on overall and liver-related mortality. The aim of the FLIP (Fatty Liver: Inhibition of Progression) project is to understand and prevent the progression of liver dis ...
Voir le projet

 17

 TERMINÉ 
The objectives of TeleFOT are to assess the impacts of functions provided by aftermarket and nomadic devices in vehicles and raise wide awareness of their traffic safety potential. These devices can provide different types of driver support functions and almost nothing is known about their safety and other impacts yet. The services and functions relate to cooperative driving like providing informa ...
Voir le projet

 4

 TERMINÉ 

Field Operational Tests of Aftermarket and Nomadic Devices in Vehicles (TELEFOT)

Date du début: 1 juin 2008, Date de fin: 30 nov. 2012,

Description TeleFOT project will assess the impacts of functions provided by aftermarket and nomadic devices in vehicles and raise wide awareness of their traffic safety potential. The objectives of the TeleFOT project are to assess the impacts of functions provided by aftermarket and nomadic devi ...
Voir le projet

 29

 TERMINÉ 
"SAVE ME aims to develop a system that detects natural (i.e. earthquake, fire,…) and man-made (i.e. terrorist attacks) disaster events in public transport terminals / vehicles and critical infrastructures (i.e. tunnels, and bridges) and that supports quick and optimal mass evacuation guidance, to save the lives of the general public and the rescuers, giving particular emphasis to the most vulnerab ...
Voir le projet

 11

 TERMINÉ 
Development of accurate identification tools for plant pathogens and pests is vital to support European Plant Health Policies. For this project Council Directive 2000/29/EC is important, listing some 275 organisms for which protective measures against introduction into and their spread within the Community needs to be taken. Those threats are now greater than ever because of the increases in the v ...
Voir le projet

 21

 TERMINÉ 

Neurotransmitter Cys-loop receptors: structure, function and disease (NeuroCypres)

Date du début: 1 févr. 2008, Date de fin: 31 juil. 2012,

Cys-loop receptors (CLRs) form a superfamily of structurally related neurotransmitter-gated ion channels, comprising nicotinic acetylcholine, glycine, GABA-A/C and serotonin (5HT3) receptors, crucial to function of the peripheral and central nervous system. CLRs cover a wide spectrum of functions, ranging from muscle contraction to cognitive functions. CLR (mal)function is linked to various disord ...
Voir le projet

 24