Rechercher des projets européens

26 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Religiöse Bildung und interkulturelles Lernen

Date du début: 1 sept. 2014, Date de fin: 31 août 2017,

Short summary in English: The Europäisches Institut für interkulturelle und interreligiöse Forschung stands for research projects and studies on the one hand and regular conferences and educational events on the other, esp. in the academic field of religion and culture. Concerning the current debate about religion and education the project "Religiöse Bildung und interkulturelles Lernen" intends to ...
Voir le projet

 6

 TERMINÉ 

Intelligent Tutoring Interface for Technology Enhanced Learning (INTUITEL)

Date du début: 1 oct. 2012, Date de fin: 30 juin 2015,

The objective of INTUITEL is to enhance state-of-the-art e-learning content and Learning Management Systems (LMS) with features that so far have been provided only by human tutors. An INTUITEL-enabled system constitutes an integrated learning environment that configures itself in response to any learner, monitors his/her progress and behaviour, combines these data with pedagogical and methodologic ...
Voir le projet

 12

 TERMINÉ 

Corridor 24 Development Rotterdam-Genoa (CODE24)

Date du début: 8 oct. 2008, Date de fin: 30 déc. 2014,

CODE24 intends the interconnection of economic development. spatial. transport and ecological planning. The projects area of Corridor 24 covers a number of the most important economic regions in Europe within this major European North-South transport corridor across NL. D. CH and IT linking the North sea port Rotterdam and the Mediterranean port of Genoa. Its catchment area comprises 70 million in ...
Voir le projet

 17

 TERMINÉ 
L’objectif est de développer, expérimenter et mettre en place des scénarii exploitant les outils de réalité virtuelle pour l'apprentissage immersif des langues française et allemande.Le projet sensibilisera les enseignants des 7000 collèges de la Région du Rhin supérieur à l'utilisation de la 3D dans le cadre de l'apprentissage scolaire, mettra gratuitement à disposition le moteur de jeu immersif ...
Voir le projet

 7

 TERMINÉ 

LBBR : Lupus BioBank des OberRheins (Lupus)

Date du début: 31 déc. 2010, Date de fin: 30 déc. 2013,

Les maladies auto-immunes concernent 5 à 6 % de la population générale. Le Lupus Systémique en est l'archétype touchant avec prédilection des femmes jeunes. Son caractère hétérogène nécessite la création d'une ambitieuse cohorte de patients associant des dossiers cliniques détaillés à une biothèque complexe afin de pouvoir aborder la pathologie sous différents angles de recherche.Autoimmunerkranku ...
Voir le projet

 10

 TERMINÉ 
Cardiovascular disease (CVD) has a significant impact on the European society in terms of mortality, morbidity and allied healthcare costs. The opportunity of multi-scale modelling spanning, sub-cellular level up to whole heart is to improve CVD outcomes by providing a consistent, biophysically-based framework for the integration of the huge amount of fragmented and inhomogeneous data currently av ...
Voir le projet

 21

 TERMINÉ 
Description ARtSENSE tackles a very important problem in the modern usage of ICT in cultural heritage domain: bridging the gap between the digital world with the physical in a highly flexible way in order to enable a novel, adaptive cultural experience.ARtSENSE aims to develop an active assistants which looks over the user’s shoulder (physic ...
Voir le projet

 10

 TERMINÉ 
EURO-FOS aims at creating a powerful pan-European network on photonic subsystems by clustering top European systems groups with proven track record in the design, development and evaluation of photonic subsystems. EURO-FOS aims at bridging the gap between research on device-level physics and new architectures from the network-level. The first objective of the project is the integration of research ...
Voir le projet

 18

 TERMINÉ 

An integrated concept of tumor metastasis: implications for therapy (TuMIC)

Date du début: 1 avr. 2008, Date de fin: 31 mars 2012,

From many perspectives our concept of the process of metastasis is inadequate and needs to be revised. In particular, the potential impact of recent ideas about the cellular basis of tumor growth (cancer stem cells) and the establishment by remote tumors of special permissive microenvironments in target organs prior to metastasis (metastatic niches) remains to be explored. In the TuMIC project we ...
Voir le projet

 14

 TERMINÉ 
Dans le cadre de ce projet, « l’offre territoriale » du cluster BioValleysera structurée suivant les composantes clés d'un cluster, à savoir :l'industrie (offres et besoins des entreprises), la recherche (offresdes laboratoires publics) et la formation (offre de formation initialeet continue et sensibilisation des jeunes).Im Rahmen dieses Projekts basiert das „gebietsbezogeneAngebot“ des Clusters ...
Voir le projet

 14

 TERMINÉ 
The quantum technologies that are coming to fruition are narrow, isolated niches separated by vast domains of technologies still ruled by classical physics. The formidable challenge of creating a broad quantum-technological base calls for bridging and integrating these niches. In this spirit, we wish to capitalize on the remarkable analogies that have recently emerged between two previously unrela ...
Voir le projet

 13

 TERMINÉ 

Enabling Grids for E-sciencE III (EGEE-III)

Date du début: 1 mai 2008, Date de fin: 30 avr. 2010,

A globally distributed computing Grid now plays an essential role for large-scale, data intensive science in many fields of research. The concept has been proven viable through the Enabling Grids for E-sciencE project (EGEE and EGEE-II, 2004-2008) and its related projects. EGEE-II is consolidating the operations and middleware of this Grid for use by a wide range of scientific communities, such as ...
Voir le projet

 167

 TERMINÉ 
A network of regional experts aims at the integrated use of advanced science-based methods to monitor, assess, and predict air pollution and noise and their impact on the environment, quality of life and health along major transport routes. These methods are adapted to the Alpine topography and its specific meteorological phenomena which often amplify the levels of concentration and noise. The pur ...
Voir le projet

 11

 TERMINÉ 

moting sustainable inner urban development (PROSIDE)

Date du début: 28 févr. 2003, Date de fin: 29 juin 2006,

Due to the political, social and economic structural changes of the 90s in various European cities many former industrial or commercially-used areas were abandoned. The negative impact of these areas on the quality of urban life reaches far beyond the site itself. The conversion process of former commercially-used brownfields located in inner-city districts shows that projects of investors are oft ...
Voir le projet

 9

 TERMINÉ 

Joint Programme on Accessible Web Design

Date du début: 1 oct. 2007,

The main purpose of the project is the development of a distance learning module with regard to national diversity at a European level in the field of accessible web design. It will be summed up to a Europe wide unique academic training programme and will itself be designed in an accessible way to enable access by as many people as possible, including people with disabilities. One further goal is ...
Voir le projet

 6

 TERMINÉ 
This proposal aims at the establishment of a regional Master program in Nanoscale Science and Engineering for postgraduate students from MENA region. The program will be taught in English and will provide the students with up-to-date theoretical and experimental knowledge available for nanoscience and nanotechnology. The development and the delivery of the program will be achieved in close collabo ...
Voir le projet

 14

 TERMINÉ 
EUE-Net – European University-Enterprise Cooperation - is an initiative to create a European Network able to assemble and to coordinate the efforts towards a better cooperation between universities and enterprises at European level, to disseminate the cooperation models and to promote best practice in Europe. The target groups of the project are graduates, students and learners in European univer ...
Voir le projet

 31

 TERMINÉ 

BrainTrainer 2012

Date du début: 2 mai 2012,

"BrainTrainer 2012” is a project set up by Bilkent Universitesi Endustri Muhendisligi Operational Research Kulubu in association with ESTIEM (European Students of Industrial Engineering and Management), a network of youngEuropeans, which aims to empower and enthuse young people from different countries to take anactive and responsible role in society.The five-day intercultural event will gather 26 ...
Voir le projet

 18

 TERMINÉ 
Music is a discipline with several special features that distinguish music from other subject areas in higher education. Until recently, the European dimension of the Higher Music Education sector was limited, with low levels of participation in European cooperation schemes and a lack of expertise on important European developments in higher education, such as the Bologna Process. With the aim to ...
Voir le projet

 31

 TERMINÉ 
MEDASTAR is a project committed to bring opportunities to students from both public and private universities of Egypt and Lebanon, paying attention to develop the capacity of public administrators in Lebanon and unemployed graduate population in Egypt. Gender balance and equal opportunities is enhanced in the project. The particular goal is to promote Science and Technology initiatives in these tw ...
Voir le projet

 19

 TERMINÉ 

ERASMUS Network for Music ‘Polifonia’

Date du début: 1 oct. 2011,

The ERASMUS Network for Music ‘Polifonia’ will enhance the quality and attractiveness of European higher music education (HME) at the European level and internationally. Impacted by European higher education policy developments (e.g. the ‘Bologna’ and ‘EU 2020’ processes) and by changes in the profession, the HME sector in Europe has developed an increasingly unified approach which has benefited f ...
Voir le projet

 55

 TERMINÉ 
The english version of the contents description is being translated and should be available as of mid November. Please consult until then the original version in FR.
Voir le projet

 15

 TERMINÉ 
The project aims at improving engineering education in RS and EG through quality control procedures and external accreditation. This will be done by providing quality a assurance model for all technical universities in the region, the development of knowledge based economy by improvement of human resources and by forming the basis of integration of the region’s universities into the EU family of ...
Voir le projet

 13

 TERMINÉ 
When it's good to be IDOL : The IDOL project has identified the needs of blind and disabled individuals to be assisted in entering into the open job market. The project provides information on the latest assistive technologies and psychological training programmes for these groups. It also educates employers and the general public about the issues involved. This project started in 2003 and lasted ...
Voir le projet

 11

 TERMINÉ 
The HIICOSS II project is based on the results of a preliminary Norwegian project, HIICOSS, designed to improve training of seagoing personnel and update knowledge already acquired.The project therefore aims to establish a training theory and practice reference standard for the different stages (safety, firefighting, survival) covered by this proposal and develop a self-training CD-ROM for use in ...
Voir le projet

 20

 TERMINÉ 
The project EUROPOLYTEC: - The European competencies framework on trades of mechatronics is available on the website of the Europolytec association as a document http://www.asso-europolytec.eu/. This competencies framework is also available in the mechatronics section of the site. It has allowed describing the courses and jobs following a single framework.- The multilingual website combines inform ...
Voir le projet

 14