Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Federation for FIRE Plus (Fed4FIREplus)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2021,

The Fed4FIRE+ project has the objective to run and further improve Fed4FIRE’s “best-in-town” federation of experimentation facilities for the Future Internet Research and Experimentation initiative. Federating a heterogeneous set of facilities covering technologies ranging from wireless, wired, cloud services and open flow, and making them accessible through common frameworks and tools suddenly op ...
Voir le projet

 24

 TERMINÉ 

Early-life stressors and LifeCycle health (LIFECYCLE)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2021,

Early life is an important window of opportunity to improve health across the full lifecycle. European pregnancy and child cohort studies together offer an unique opportunity to identify a wide range of early life stressors linked with individual biological, developmental and health trajectory variations, and to the onset and evolution of non-communicable diseases. LIFECYCLE will establish the Eur ...
Voir le projet

 19

 TERMINÉ 

Next generation Pass-By Noise approaches for new powertrain vehicles (PBNv2)

Date du début: 1 mai 2017, Date de fin: 30 avr. 2021,

With transportation noise being the second most deadly environmental pollutant in Europe, engineering for future mobility must be inspired by ecology, economy and health to enable green and silent vehicles. Legislations define maximum noise emission limits that have to be complied with during standardized pass-by noise test procedures. Given novel, often electrified, vehicle powertrain concepts, n ...
Voir le projet

 10

 TERMINÉ 

Arctic Impact on Weather and Climate (Blue-Action)

Date du début: 1 déc. 2016, Date de fin: 28 févr. 2021,

Blue-Action will provide fundamental and empirically-grounded, executable science that quantifies and explains the role of a changing Arctic in increasing predictive capability of weather and climate of the Northern Hemisphere.To achieve this Blue-Action will take a transdisciplinary approach, bridging scientific understanding within Arctic climate, weather and risk management research, with key s ...
Voir le projet

 40

 TERMINÉ 
Limiting the climate change-induced temperature increase to less than 2°C will require strong reductions in greenhouse gas emissions. Lightweight materials and fibre-reinforced composites in particular, are a key enabling technology to achieve this goal. Current composite applications are however strongly overdesigned due to a lack of reliable design tools and predictive models for their mechanica ...
Voir le projet

 10

 TERMINÉ 

Ageing Trajectories of Health: Longitudinal Opportunities and Synergies (ATHLOS)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2020,

The objective of the ATHLOS Project is to achieve a better understanding of ageing by identifying patterns of healthy ageing pathways or trajectories, the determinants of those patterns, the critical points in time when changes in trajectories are produced, and to propose timely clinical and public health interventions to optimise healthy ageing. Moreover, a new definition of ‘old age’ based on ma ...
Voir le projet

 15

 TERMINÉ 

Accelerating data to market (Data Pitch)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

Information technology has driven, directly or indirectly, much of Europe’s economic growth during the last decades as the role of data transitioned from the support of business decisions to becoming a good in itself. An open approach towards data value creation has become critical in the new networked economy, with Europe well placed to nurture this new revolution. However, to date Europe’s data ...
Voir le projet

 4

 TERMINÉ 
ENABLE-S3 will pave the way for accelerated application of highly automated and autonomous systems in the mobility domains automotive, aerospace, rail and maritime as well as in the health care domain. Virtual testing, verification and coverage-oriented test selection methods will enable validation with reasonable efforts. The resulting validation framework will ensure Europeans Industry competiti ...
Voir le projet

 76

 TERMINÉ 
BRIDGES (Bringing together Research and Industry for the Development of Glider Environmental Services) will provide a necessary tool for further understanding, improved monitoring, and responsible exploitation of the marine environment while assuring its long-term preservation. This new tool, a robust, cost-effective, re-locatable, versatile and easily-deployed ocean glider, will support autonomo ...
Voir le projet

 21

 TERMINÉ 

Answering Questions using Web Data (WDAqua)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2018,

The H2020 work programme aims at increasing citizens’ participation in the digital society and making infrastructures “smart”. These processes are increasingly data-driven. Our central motivation is that sharing, connecting, managing, analysing and understanding data on the Web will enable better services for citizens, communities and industry. However, turning web data into successful services fo ...
Voir le projet

 6

 TERMINÉ 

Towards a EU framework for the security of Widezones (ZONESEC)

Date du début: 1 déc. 2014, Date de fin: 30 nov. 2018,

The advancement of 24/7 surveillance systems for the security of WideZones with multiple assets at localized scales is of extreme strategic relevance to European economies, industries, authorities and Citizens. Nevertheless, the cost for large deployments and maintenance of ground sensing networks for local surveillance across these WideZones is extremely high. Hence, large areas of high economic ...
Voir le projet

 19

 TERMINÉ 

Health Care Work Exchange 2016

Date du début: 1 juin 2016, Date de fin: 31 mai 2018,

The “Health Care Work Exchange 2016” project will enable 100 apprentices and students of health care vocational schools from 1 June 2016 to 31 May 2018 to carry out an internship in all countries participating in the ERASMUS+ Mobility Program. Apprentices and students in the fields of nursing, midwifery, physical therapy, occupational therapy, speech therapy, special education and in medical techn ...
Voir le projet

 39

 TERMINÉ 
The overall objectives of the GRAVITATE project are to create a set of software tools that will allow archaeologists and curators to reconstruct shattered or broken cultural objects, to identify and re-unify parts of a cultural object that has been separated across collections and to recognise associations between cultural artefacts that will allow new knowledge and understanding of past societies ...
Voir le projet

 7

 TERMINÉ 

Federated Interoperable Semantic IoT/cloud Testbeds and Applications (FIESTA)

Date du début: 1 févr. 2015, Date de fin: 31 janv. 2018,

Despite the proliferation of IoT and smart cities testbeds, there is still no easy way to conduct large scale experiments that leverage data and resources from multiple geographically and administratively distributed IoT platforms. Recent advances in IoT semantic interoperability provide a sound basis for implementing novel cloud-based infrastructures that could allow testbed-agnostic access to Io ...
Voir le projet

 15

 TERMINÉ 

European Data Science Academy (EDSA)

Date du début: 1 févr. 2015, Date de fin: 31 janv. 2018,

Data explosion on the web, fuelled by social networking, micro-blogging, as well as crowdsourcing, has led to the Big Data phenomenon. This is characterized by increasing volumes of structured, semi-structured and unstructured data, originating from sources that generate them at an increasing rate. This wealth of data provides numerous new analytic and business intelligence opportunities to variou ...
Voir le projet

 10

 TERMINÉ 

Communication About SocioScientific Issues (CASSIS) (CASSIS)

Date du début: 1 févr. 2014, Date de fin: 31 janv. 2018,

"CASSIS (Communication About SocioScientific Issues) is a collaborative research project between four universities in France, England (2) and New Zealand. The overall aim of the proposed staff exchange programme is to improve communication about socioscientific issues (SSIs) between people with opposing views, to help them to develop a collaborative reflection and to improve their reasoning integr ...
Voir le projet

 4

 TERMINÉ 
The overall aim of the EC call is building up a scientifically literate society, which enables its citizens to participate in the research and innovation process as part of Responsible Research and Innovation (RRI). This calls for democratic citizenship education, in which two educational approaches, often presented independently in schools, are integrated, viz. Inquiry-Based Science Education (IB ...
Voir le projet

 21

 TERMINÉ 

Access CenTer for PHotonics innovAtion Solutions and Technology support (ACTPHAST)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2017,

ACTPHAST is a unique "one-stop-shop" European access centre for photonics innovation solutions and technology support (Access CenTre for PHotonics innovAtion Solutions and Technology support). ACTPHAST will support and accelerate the innovation capacity of European SMEs by providing them with direct access to the expertise and state-of-the-art facilities of Europe's leading photonics research cent ...
Voir le projet

 29

 TERMINÉ 

Long-term effects of early nutrition on later health (EARLYNUTRITION)

Date du début: 1 févr. 2012, Date de fin: 31 oct. 2017,

Nutrition during early development has an important impact on later health, particularly through greater obesity risk, as demonstrated by FP6 EARNEST. EarlyNutrition explores the current key hypotheses on likely causes and pathways to prevention of early life origins of obesity (specifically adiposity) and associated disorders. We bring extraordinary expertise and study populations of 470,000 indi ...
Voir le projet

 40

 TERMINÉ 

Trans National Creative Exchange

Date du début: 1 août 2015, Date de fin: 31 juil. 2017,

Trans National Creative Exchange will be an international platform supporting the most exciting emerging creative talent from Europe and China. It will foster both professionals and students in the development and internationalization of their careers, allowing them to work in partnership to experiment, create and present new work for all, whilst gaining valuable experience and establishing profes ...
Voir le projet

 4

 TERMINÉ 

Open Data INcubator for Europe (ODINE)

Date du début: 1 févr. 2015, Date de fin: 31 juil. 2017,

...raunhofer IAIS and the ODI (both data facilitators and incubators), Telefonica (providing computing infrastructure and strong links to data protection and privacy stakeholders), and the University of Southampton (renowned for its open data research and home of Sir Tim Berners-Lee and Sir Nigel Shadbolt), we plan to establish a EU-wide, industry-focused network of open data companies around Europe, ...
Voir le projet

 7

 TERMINÉ 

Health Care Work Exchange 2015

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

From 1.6.2015 to 31.5.2017 the project “Health Care Work Exchange 2015” will offer 100 apprentices and students of health care vocational schools an opportunity to carry out an internship in all countries participating in ERASMUS+. Foremost apprentices and students in the fields of nursing, midwifery, physical therapy, occupational therapy, speech therapy, special education and in medical technica ...
Voir le projet

 38

 TERMINÉ 
SUPRAPOWER is a research project focused on a major innovation in offshore wind turbine technology by developing a new compact superconductor-based generator.The project aims to provide an important breakthrough in offshore wind industrial solutions by designing an innovative, lightweight, robust and reliable 10 MW class offshore wind turbine based on a superconducting (SC) generator, taking into ...
Voir le projet

 11

 TERMINÉ 

Position and Personalize Advanced Human Body Models for Injury Prediction (PIPER)

Date du début: 1 nov. 2013, Date de fin: 30 avr. 2017,

"In passive safety, human variability is currently difficult to account for using crash test dummies and regulatory procedures. However, vulnerable populations such as children and elderly need to be considered in the design of safety systems in order to further reduce the fatalities by protecting all users and not only so called averages.Based on the finite element method, advanced Human Body Mod ...
Voir le projet

 14

 TERMINÉ 

Enhanced European Coordination for Accelerator Research & Development (EUCARD-2)

Date du début: 1 mai 2013, Date de fin: 30 avr. 2017,

Research accelerators are facing important challenges that must be addressed in the years to come: existing infrastructures are stretched to all performance frontiers, new world-class facilities on the ESFRI roadmap are starting or nearing completion, and strategic decisions are needed for future accelerators and major upgrades in Europe.While current projects concentrate on their specific objecti ...
Voir le projet

 40

 TERMINÉ 

Integrated Approaches to Food Allergen and Allergy Risk Management (IFAAM)

Date du début: 1 mars 2013, Date de fin: 28 févr. 2017,

Up to 20 million European citizens suffer from food allergy. However management of both food allergy (by patients and health practitioners) and allergens (by industry) is thwarted by lack of evidence to either prevent food allergy developing or protect adequately those who are already allergic. iFAAM will develop evidence-based approaches and tools for MANAGEMENT of ALLERGENS in FOOD and integrate ...
Voir le projet

 46

 TERMINÉ 

MOBILISING THE POTENTIAL OF ACTIVE AGEING IN EUROPE (MOPACT)

Date du début: 1 mars 2013, Date de fin: 28 févr. 2017,

The starting point for MOPACT is the ambitious goals set by Horizon 2020 and the European Innovation Partnership Pilot Project on Active and Healthy Ageing (EIPAHA). Our response is ambitious too: we aim to provide the research and practical evidence upon which Europe can make longevity an asset for social and economic development. MOPACT will create a high quality, multi-disciplinary critical mas ...
Voir le projet

 32

 TERMINÉ 

Glioma Actively Personalized Vaccine Consortium (GAPVAC)

Date du début: 1 nov. 2012, Date de fin: 31 janv. 2017,

"Glioblastoma (GBM) is a rare (2-3 incidences in 100,000) and fatal disease. Each year, approximately 13,000 new cases of GBM are diagnosed in Europe. The 5-year survival rate of this highly aggressive tumor entity under conventional therapy is less than 6%. Currently available therapeutic options neglect the individuality of each patients’ disease and only temporarily influence tumor progression ...
Voir le projet

 13

 TERMINÉ 

Inclusive Growth Research Infrastructure Diffusion (INGRID)

Date du début: 1 févr. 2013, Date de fin: 31 janv. 2017,

Referring to the increasingly challenging EU2020-ambition of Inclusive Growth, the objectives of the InGRID project are to integrate and to innovate existing, but distributed European social sciences research infrastructures on ‘poverty and living conditions’ and ‘working conditions and vulnerability’ by improving the transnational data access, organising mutual knowledge exchange and improving me ...
Voir le projet

 17

 TERMINÉ 
Active therapeutic biodegradable and biocompatible materials are highly in demand. These are required for the production of medicinal products in a variety of areas including implant technology, tissue engineering, drug delivery and wound healing. Within implant technology such biomaterials can be used for dental, bone and cardiovascular implants. Tailored mechanical properties, biocompatibility a ...
Voir le projet

 14

 TERMINÉ 

Rational Bioactive Materials Design for Tissue Regeneration (BIODESIGN)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2016,

The development of functional materials for tissue regeneration is today mostly based on perceived and limited design criteria often using a single point approach with lengthy animal trials. The outcome after in-vitro and in-vivo evaluation is often disappointing resulting in a tedious iteration process. The main objective of this project is to achieve radical innovations in state-of-the-art bioma ...
Voir le projet

 21

 TERMINÉ 

Improving Low Earth Orbit Security With Enhanced Electric Propulsion (LEOSWEEP)

Date du début: 21 oct. 2013, Date de fin: 1 nov. 2016,

The total mass of space debris in the low Earth orbit region is estimated to be close to 2,500 tons. About half of this mass is composed by rocket upper stages clustered in high inclination orbital regions. Because they are grouped in a relatively small number of families, acquiring the capability to deorbit just a few upper stage types would lead the way towards the elimination of hundreds of ton ...
Voir le projet

 11

 TERMINÉ 

Managing Impacts of Deep-seA reSource exploitation (MIDAS)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2016,

The MIDAS project addresses fundamental environmental issues relating to the exploitation of deep-sea mineral and energy resources; specifically polymetallic sulphides, manganese nodules, cobalt-rich ferromanganese crusts, methane hydrates and the potential mining of rare earth elements. These new industries will have significant impacts on deep-sea ecosystems, in some cases extending over hundre ...
Voir le projet

 34

 TERMINÉ 

Federation for FIRE (Fed4FIRE)

Date du début: 1 oct. 2012, Date de fin: 30 sept. 2016,

A federation of experimentation facilities will significantly accelerate Future Internet research. Fed4FIRE will deliver open and easily accessible facilities to the FIRE experimentation communities, which focus on fixed and wireless infrastructures, services and applications, and combinations thereof. The project will develop a demand-driven common federation framework, based on an open architect ...
Voir le projet

 43

 TERMINÉ 

Cities demonstrating cybernetic mobility (CITYMOBIL2)

Date du début: 1 sept. 2012, Date de fin: 31 août 2016,

European cities face four main mobility problems: congestion, land use , safety and environment. One of the main causes of such problems is the car-ownership rate. The centres of large cities address this issue combining efficient mass transits with car restriction policies but peripheral areas and smaller cities remain dominated by private cars.CityMobil has demonstrated how automating road vehi ...
Voir le projet

 49

 TERMINÉ 

Health Care Work Exchange 2014

Date du début: 1 juin 2014, Date de fin: 31 mai 2016,

From 1.6.2014 to 31.5.2016 the project “Health Care Work Exchange 2014” will offer 100 apprentices and students of health care vocational schools an opportunity to carry out an internship in all countries participating in ERASMUS+. Foremost apprentices and students in the fields of nursing, midwifery, physical therapy, occupational therapy, speech therapy, special education and in medical technica ...
Voir le projet

 27

 TERMINÉ 
Primary Ciliary Dyskinesia (PCD) is a rare genetically heterogeneous disorder which results from dysfunction of motile hair-like organelles (cilia) that results in severe, chronic airways disease. Due to other cilia-related disease mechanisms several other organ systems like the heart can be affected. The complexity of the disease phenotype, late diagnosis, as well as lack of evidence based manage ...
Voir le projet

 12

 TERMINÉ 

Attention Deficit Hyperactivity Disorder Drugs Use Chronic Effects (ADDUCE)

Date du début: 1 nov. 2010, Date de fin: 30 avr. 2016,

Attention deficit hyperactivity disorder (ADHD) is one of the most common neurodevelopmental disorders in children, affecting approximately 5% children in Europe. Methylphenidate (MPH) is the most-commonly prescribed medication for ADHD children; it is also increasingly used in ADHD adults. In 2007, the European Commission requested a referral to the Committee for Medicinal Products for Human Use ...
Voir le projet

 17

 TERMINÉ 
The clinical evidence indicates that the number of people with all levels of hearing impairment and hearing loss is rising mainly due to a growing global population and longer life expectancies. Hearing loss caused by pathology in the cochlea or the cochlear nerve is classified as sensorineural hearing loss. The study of the normal function and pathology of the inner ear has unique difficulties as ...
Voir le projet

 11

 TERMINÉ 

Transition Location Effect on Shock Wave Boundary Layer Interaction (TFAST)

Date du début: 1 févr. 2012, Date de fin: 31 janv. 2016,

Vision-2020, whose objectives include the reduction of emissions and a more effective transport systems, puts severe demands on aircraft velocity and weight. These require an increased load on wings and aero-engine components. The greening of air transport systems means a reduction of drag and losses, which can be obtained by keeping laminar boundary layers on external and internal airplane parts ...
Voir le projet

 16